RE-BID Skate Park AFB.docx
DOCX document 101 KB Posted
- Attached to
- 2025 REBID SKATEPARK REPAIR PROJECT
- Solicitation number
- PR-25-02
- Issued by
- Montezuma County, Colorado
About this file
This is a Request for Bid (RFB) document from the City of Cortez General Services Department for the 2025 REBID Skatepark Repair Project in Colorado. The project seeks a contractor to repair approximately 1,000 square feet of damaged skatepark components, including grinding down existing concrete, providing a concrete repair strategy, creating a skateable surface with improved transitions, and developing an annual maintenance plan. The bid will be conducted using a Competitive Sealed Best Value Bidding method with two steps. Key dates include an advertisement release on 5/7/2025, bid questions due by 5/19/2025, sealed bids due on 5/30/2025 at 3:00 PM, and an anticipated construction start and finish in September 2025. The project has a total completion timeline of 90 calendar days from the Notice to Proceed.
The contract will be awarded based on a weighted evaluation of 40% qualifications and 60% bid price, with contractors required to meet minimum qualifications including concrete general contracting experience, insurance requirements, and Colorado labor preferences. Local vendor preferences are available, offering a 2.5% preference for businesses within Cortez city limits and a 2.0% preference for businesses in Montezuma County. The project has specific requirements for subcontractor utilization, with contractors limited to subcontracting no more than 50% of the contract work. Funding appears to be from the City of Cortez, with a focus on local economic participation and adherence to state apprenticeship and prevailing wage regulations for public works projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| thumbnail_IMG_3345.jpg | JPG image | |
| thumbnail_IMG_3339.jpg | JPG image | |
| thumbnail_IMG_3347.jpg | JPG image | |
| thumbnail_IMG_3352.jpg | JPG image | |
| thumbnail_IMG_3337.jpg | JPG image | |
| thumbnail_IMG_3354.jpg | JPG image | |
| thumbnail_IMG_3343.jpg | JPG image | |
| thumbnail_IMG_3329.jpg | JPG image | |
| thumbnail_IMG_3335.jpg | JPG image | |
| thumbnail_IMG_3344.jpg | JPG image | |
| thumbnail_IMG_3342.jpg | JPG image | |
| thumbnail_IMG_3336.jpg | JPG image | |
| thumbnail_IMG_3331.jpg | JPG image | |
| thumbnail_IMG_3350.jpg | JPG image | |
| thumbnail_IMG_3353.jpg | JPG image | |
| thumbnail_IMG_3349.jpg | JPG image | |
| thumbnail_IMG_3338.jpg | JPG image | |
| thumbnail_IMG_3334.jpg | JPG image | |
| thumbnail_IMG_3351.jpg | JPG image | |
| thumbnail_IMG_3332.jpg | JPG image | |
| thumbnail_IMG_3328.jpg | JPG image | |
| thumbnail_IMG_3330.jpg | JPG image | |
| thumbnail_IMG_3333.jpg | JPG image | |
| thumbnail_IMG_3348.jpg | JPG image | |
| thumbnail_IMG_3346.jpg | JPG image | |
| thumbnail_IMG_3341.jpg | JPG image | |
| thumbnail_IMG_3340.jpg | JPG image |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Cortez General Services Department
ADVERTISEMENT FOR BIDS
FOR
COMPETITIVE SEALED BEST VALUE
FOR THE
FOR THE
City of Cortez REBID Skatepark Repair Project
ADVERTISEMENT FOR BIDS (INFORMATION PACKET)
FOR
COMPETITVE SEALED BEST VALUE
TABLE OF CONTENTS
| I. | COMPETITVE SEALED BEST VALUE | 2 |
| I. | GENERAL INFORMATION | 3 |
| A. | PROJECT TITLE AND DESCRIPTION | 3 |
| B. | MINIMUM QUALIFICATIONS | 3 |
| C. | SCOPE OF SERVICES | 4 |
| D. | SCHEDULE | 5 |
| E. | CLARIFICATIONS | 6 |
| F. | SUBMITTALS OF SEALED QUALIFICATIONS AND BIDS | 6 |
| G. | METHOD OF SELECTION AND AWARD | 6 |
| II. | EVALUATION OF QUALIFICATIONS | 7 |
| A. | EVALUATION FACTORS | 7 |
| III. | BID FORM | 8 |
| APPENDIX A - EVALUATION OF QUALIFICATIONS FORM | 9 | |
| APPENDIX A1 - QUALIFICATIONS AND BID RANKING MATRIX | 12 | |
| APPENDIX B - SAMPLE CONSTRUCTION AGREEMENT | 14 | |
| APPENDIX C - BID FORM | 17 | |
| APPENDIX C1 - INFORMATION FOR BIDDERS | 20 | |
| APPENDIX D - CONSTRUCTION AND MATERIALS SUMMARY | 22 | |
| APPENDIX E - LOCAL VENDOR PREFERENCE | 24 |
ADVERTISEMENT FOR BIDS
FOR
COMPETITVE SEALED BEST VALUE BIDDING
Project No: GS – 25 – 04 –SRP Project Title: 2025 REBID Skatepark Repair Project Settlement Notice:
For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
1. GENERAL INFORMATION
PROJECT TITLE AND DESCRIPTION
The City of Cortez is seeking a contractor able to repair damaged components of the existing skatepark. The total area in need of repair is estimated at 1000 square feet. The contractor will provide methods of grinding down current concrete for repair, concrete type, strategy for repair, plans for a skateable surface (not too slippery, improves transitions throughout skatepark), and provide suggestions for plans for ongoing (annual) maintenance.
The process to be used in the selection of the General Contractor is the Competitive Sealed Best Value Bidding method comprised of two steps as described in Section I (H).
MINIMUM QUALIFICATIONS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Provide Concrete Specific General Contracting services within the last three (3) years for at least two (2) projects each in excess of $20,000 (hard costs), utilizing the expertise present in their Colorado Office; and
2. Demonstrated specific General Contracting experience in projects of similar scope and complexity.
3. Firm must be fully insured with both automotive and comprehensive liability insurance and able to add the city as additionally insured.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
Website URL: https://www.cortezco.gov/bids.aspx
SCOPE OF SERVICES
a. Scope of Work: The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and described in the specifications for the project titled: 2025 Rebid Skatepark Repair Project, consisting in general terms of the following:
i. Repair spalling and patch cracks in concrete surfaces.
ii. Remove rectangular cement block on north side of park.
iii. Build a cement retaining wall on the north side; should double as a skateable surface; height will range from 18 in. to 8 in.
iv. Propose idea for sealer to apply to entire park that will withstand Colorado weather extremes, reduce water damage, and provide an ongoing maintenance opportunity for the park.
b. All work is in the City of Cortez city limits. Work performed shall be of high quality, in compliance with general accepted standards of workmanship, and in conformity with the Contract Documents.
c. SCHEDULING: The contractor shall schedule the improvements, such that the least inconvenience is caused to skatepark patrons. The Contractor shall provide a schedule to the City showing the sequence of area to be constructed. Contractor may be required to adjust work hours/schedule as a result of public input.
d. SPECIAL NOTICE TO RESIDENTS: Public Relations/Public Information is the responsibility of the Contractor and the City of Cortez. The Contractor will give significant advance warnings to the city. A general early-warning notification will be given at least one week prior to beginning the project.
e. COMPLETION OF WORK: The City of Cortez will require that all of the work be completed within 90 calendar days from the date of the Notice to Proceed. Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto.
f. GUARANTEE: The contractor shall guarantee and warrant all the workmanship and materials against any defects for one year from the date of final acceptance.
g. SUB-CONTRACTOR: The Contractor may not sub-contract more than fifty percent (50%) of the contract work. A proposed list of sub-contractors must be submitted for approval to the City prior to contract execution.
h. CONSTRUCTION DESIGN STANDARDS: The current City of Cortez Construction Design Standards is made a part of these specifications. Contractors are urged to familiarize themselves with the Construction Design Standards, which are available on-line at https://www.cortezco.gov/720/engineering. The “Contract Specifications” will take precedence over any similar conditions in the Construction Design Standards.
i. SUBSTITUTION OF MATERIALS: At no time shall materials be substituted for those shown on the Drawings or called for in the Specifications, unless written approval is obtained from the Owner’s Representative in writing prior to construction. Specified items with the notation “…or approved equal” must receive approval via the submittal process. Any deviation from the Drawings and Specifications shall be accompanied by a written directive of the Owner’s Representative.
j. PROTECTION OF PROPERTY: The contractor shall protect all existing improvements and property from damage.
k. DISTURBED UTILITY SERVICES: Utility services disturbed or damaged by the contractor shall be replaced back to as near normal condition as possible. The repair shall be coordinated with the Utility Owner.
l. CLEAN-UP: After completing work, clean all surfaces, pick up excess materials, and clean work area. All involved will have a final walk through, any punch list items will be addressed at that time.
m. The scope of services will include full Construction Contracting Services for the project specified during the process of construction, and warranty period to the City. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the City.
n. Per C.R.S. §24-92-Part 1, It is required that the General Contractor or other firm to which the contract is awarded to submit the Contractors or Subcontractors that will be used for all Mechanical, Sheet Metal, Fire Suppression, Sprinkler Fitting, Electrical and Plumbing work. You must also certify that all Firms identified participate in Apprenticeship Programs registered with the United State Department of Labor’s Employment and Training Administration or State Apprenticeship Councils recognized by The United States Department of Labor and have a proven record of graduating apprentices.
o. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
SCHEDULE
The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
| Advertisement |
| 5/7/2025 |
| Date Email Questions Due To csimpson@cortezco.gov |
| 5/19/2025 by 5:00 P.M |
| Date Email Answers Issued |
| 5/23/2025 by 5:00 P.M |
Sealed Bids (Due at Public Bid Opening) 110 West Progress Circle, Cortez.
5/30/2025 @ 3:00 P.M.
| Written Notification and Selection Announced |
| 6/6/2025 |
| Negotiation of Contract |
| 6/9/2025 – 6/13/2025 |
| Contract Approval (projected) |
| 6/25/2025 |
| Anticipated Design Start (projected) |
| 7/7/2025 |
| Anticipated Construction Start/Finish (projected) |
| 9/30/2025 |
(_3_) hard copies of the bid are due _5/30/2025_3:00 P.M. at the following address:
110 West Progress Circle Cortez, CO 81321 The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the schedule date and time.
CLARIFICATIONS
1. Owner initiated changes to this AFB will be issued under numerically sequenced email addenda. Addenda generally consist of the following items:
Clarifications Scope Changes Time and/or Date Changes Respondents must acknowledge all issued addenda in their bid.
The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the Sample Contract are expressly workable without reservation.
SUBMITTALS OF SEALED QUALIFICATIONS AND BIDS
1. All submittals must comply with the following items, a through e. The City retains the right to waive any minor irregularity or requirement should it be judged to be in the best interest of the City.
a) Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 7) in Appendix A. A two-sided single page cover letter addressed to the Casey Simpson, General Services Director for the City of Cortez outlining the firm(s) qualifications is required at the front of the submittal.
b) The bids are to include compensation for all materials, labor, equipment, and other necessary items to complete the work described in these documents, unless otherwise noted. The following bid items are to include compensation for other particular items pertinent to the project, but not listed separately as a bid item. All quantities are estimates and the actual final quantities will be field measured and agreed to for final payment. The City reserves the right to add to or delete from the quantities shown in the bid form.
c) Qualifications shall be evaluated in accordance with criteria as indicated in SECTION IV. A. PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A.
d) Response to all items shall be complete.
e) All references shall be current and relevant.
f) Bids shall be submitted on the bid required form and as per the Advertisement for Bids.
METHOD OF SELECTION AND AWARD
The process to be used in the selection of the Construction Contracting Services is the Competitive Sealed Best Value Bidding method comprised of two steps. STEP I is the Submittal of Qualifications as described in Section I (G). STEP II is the submittal and opening of the sealed bids at a public bid opening. The City of Cortez will evaluate the qualifications prior to the public bid opening in Step II. After the public bid opening and acknowledgement of the apparent low bidder, the City of Cortez will consider both qualifications and bid prices and determine the final ranking of firms with qualifications given 40% of the value of the weighted criteria and the bid price given 60%. Selection and award of this project will be by written notice and will be based on a combination of qualifications and bid price that represents the most advantageous and best overall value to the City. Refer to the enclosed Schedule in Section II (A).
After selection and award all bids, qualifications and ranking documents will be made available to the public.
EVALUATION OF QUALIFICATIONS
1. EVALUATION FACTORS
1. TECHNICAL APPROACH TO THE PROJECT
· Provide a strategic project approach summary discussing how your firm will provide successful Construction Contracting Services for this project. Include specific examples (1–2-page excerpts) of actual products (estimates, progress reports, schedules, constructability reviews, value engineering studies, forms, etc.).
· Provide a detailed description of how your firm will select qualified sub-contractors and manage them effectively on this project.
2. EXPERIENCE, PAST PERFORMANCE AND EXPERTISE
· Provide a description of successful prior construction contracts, including performance in the areas of cost, quality control, schedule, compliance with plans and specifications and adherence to applicable laws and regulations as performed by your firm and by your subcontractors.
3. PROJECT MANAGEMENT PLAN
· Provide a description of the composition and management structure of your firm. Identify the firm’s roles and responsibilities and relevant technical expertise and experience of the key management personnel that will be used on this project. Provide a description and separate graphic organizational chart complete with working titles identifying the lines of authority, responsibility and coordination between your firm and your subcontractors and,
· Describe the proposed project schedule, quality control program, financial resources, equipment to be used on this project and its current location, and any other information or resources that demonstrates your firm’s competency to perform this work
4. STAFFING PLAN
· Provide a detailed staffing plan of key management personnel to be assigned to this project from your firm and your subcontractors and identify the time commitments and all current office locations.
5. SAFETY PLAN AND SAFETY RECORD
· Describe your firm’s safety program and provide your firms’ safety record over the last ten years.
6. JOB STANDARDS
· Demonstrate on past projects examples how a high quality of workmanship was achieved and industry standards of care were achieved and,
· Describe the firm’s method of personnel procurement, employment of Colorado workers, work force development and long-term career opportunities of workers and,
· Describe the firm’s availability of training programs, including apprenticeships approved by the United States Department of Labor and,
· Describe the benefits provided to workers, including healthcare and defined benefit or defined contribution retirement benefits, and whether the firm pays industry-standard wages.
7. AVAILABILITY AND USE OF DOMESTICALLY PRODUCED GOODS
· Describe how your firm intends to use domestically produced iron, steel, and related manufactured goods in this project.
8. LOCAL PRESENCE
· Describe what Services under the contract or any Subcontract will be performed by a Cortez owned Business, Montezuma County Owned Business, or Regionally owned Business.
BID FORM
A. After submission of the Sealed Qualifications as per Section I (G) those firms intending to submit a sealed bid are required to use the Bid Form Appendix C.
B. This AFB document, it’s appendices, and any written addenda issued prior to the bid opening, and written clarifications shall serve as the only basis for Bid.
C. The Bidder, by submitting this bid, does hereby accept that minor changes by the City to the exhibited contract and its exhibits, which do not adversely affect the Bidder, shall not be cause for withdrawal or modification of the amounts submitted herein. Exceptions to the AFB documents and/or modification of the bid may render the proposal non-responsive.
D. Upon due consideration and review of this document along with its appendices, written addenda, and written clarifications prior to the bid opening, the respondent does hereby submit the following bid, consistent with the schedules provided in the Scope of Services.
APPENDIX A - EVALUATION OF QUALIFICATIONS FORM
COMPETITIVE SEALED BEST VALUE BIDDING
Name of Firm: _______________________________________________________________ Name of Project: ______________________________________________________________ Evaluator No_____________________________________ Date: ___________________
AFB REFERENCE MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements (including letter from surety) have not been met, specify the reason(s): ____________________________________________________________________________
SCORE
| Weight1 x Rating2 = Score | |
| 1. TECHNICAL APPROACH TO PROJECT |
· Provide a strategic project approach summary discussing how your firm will provide successful Construction Contracting Services for this project. Include specific examples (1-2 page excerpts) of actual products (estimates, progress reports, schedules, constructability reviews, value engineering studies, forms, etc.).
x
· Provide a detailed description of how your firm will select qualified sub-contractors and manage them effectively on this project.
x
2. EXPERIENCE, PAST PERFORMANCE AND EXPERTISE
· Provide a description of successful prior construction contracts, including performance in the areas of cost, quality control, schedule, compliance with plans and specifications and adherence to applicable laws and regulations as performed by your firm and by your subcontractors.
x
3. PROJECT MANAGEMENT APPROACH
· Provide a description of the composition and management structure of your firm. Identify the firm’s roles and responsibilities and relevant technical expertise and experience of the key management personnel that will be used on this project. Provide a description and separate graphic organizational chart complete with working titles identifying the lines of authority, responsibility and coordination between your firm and your subcontractors and, x
· Describe the proposed project schedule, quality control program, financial resources, equipment to be used on this project and its current location, and any other information or resources that demonstrates your firm’s competency to perform this work x
4. STAFFING PLAN
· Provide a detailed staffing plan of key management personnel to be assigned to this project from your firm and your subcontractors and identify the time commitments and all current office locations.
x
5. SAFETY PLAN AND SAFETY RECORD
· Describe your firm’s safety program and provide your firms’ safety record over the last ten years.
x
6. JOB STANDARDS
· Demonstrate on past projects examples how a high quality of workmanship was achieved, and industry standards of care were achieved and, X
· Describe the firm’s method of personnel procurement, employment of Colorado workers, work force development and long-term career opportunities of workers and, x
· Describe the firm’s availability of training programs, including apprenticeships approved by the United States Department of Labor and, x
· Describe the benefits provided to workers, including healthcare and defined benefit or defined contribution retirement benefits, and whether the firm pays industry-standard wages.
x
7. AVAILABILITY AND USE OF DOMESTICALLY PRODUCED GOODS
· Describe how your firm intends to use domestically produced iron, steel, and related manufactured goods in this project.
x
8. Local Presence
· Describe what Services under the contract or any Subcontract will be performed by a Cortez Owned Business, Montezuma County Owned Business, or Regionally Owned Business x
TOTAL SCORE:
NOTES:
| 1. | Weights are to be assigned prior to evaluation and are to be consistent on all evaluation forms. Use only whole numbers. | |
| 2. | Rating: | 0 = not provided 1 = Unacceptable 2 = Poor 3 = Fair 4 = Good 5 = Excellent |
| 3. | Total score includes the sum total of all criteria. Note: A passing score (as a percentage of the total points available) is to be established prior to evaluation. |
APPENDIX A1 - QUALIFICATIONS AND BID RANKING MATRIX
QUALIFICATIONS 40%/BID COST 60%
FIRM
QUALS SCORE3
BID SCORE4
QUALS & BID SCORE5
RANK6
Notes
NOTES:
1. Insert total score from each evaluator's SUBMITTAL review.
2. Add all evaluators’ total scores and divide by the number of evaluators to determine the average score for each firm’s qualifications.
3. The maximum score for qualifications on the evaluation form is equivalent to 40 points and is equivalent to the maximum points available for qualifications. Therefore, each firm’s score is determined as a percentage of the maximum points available. To score each average qualification score, use the example formula.
Assume the highest score is 600.
Scoring of Qualifications
| Firm B: | 600 x 40 points = 40 points |
| 600 | |
| Firm C: | 500 x 40 points = 33.33 points |
| 600 | |
| Firm A: | 400 x40 points = 26.66 points |
| 600 |
4. Determine score for each firm’s sealed Bid with the lowest fee being equivalent to a maximum score of 60 points. To score each Bid, use the example formula.
Assume the lowest Bid was $100,000.
Scoring of Bids
| Firm A: | $100,000 x 60 points = 60 points |
| $100,000 | |
| Firm B: | $100,000 x 60 points = 48 points |
| $125,000 | |
| Firm C: | $100,000 x 60 points = 39.99 points |
| $150,000 |
5. Add the average qualification score to the Bid score to determine cumulative qualifications and fee score.
6. Numerically rank all firms with the highest scoring firm being the most qualified and advantageous to the City.
APPENDIX B - SAMPLE CONSTRUCTION AGREEMENT
THIS AGREEMENT (this “Agreement”), entered into effective the ?? day of ????, 202? (the “Effective Date”), by and between THE CITY OF CORTEZ, COLORADO, a Colorado home-rule municipality, hereinafter referred to as the “City,” and ??????????, a Colorado corporation (insert the correct type of entity – limited liability company, corporation, etc., and state of registration), hereinafter referred to as the “Contractor.” The City and the Contractor may be referred to herein individually as a “Party,” and collectively as the “Parties.”
WITNESSETH:
| In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the Parties as follows: | ||
| 1. | Contract Documents. The Contract Documents consist of this Agreement, the conditions of the Contract (General, Supplementary, and Other Conditions), the Drawings, the Specifications, all Addenda issued prior to, and all modifications issued after execution of this Agreement. The foregoing documents form the Contract, and all are fully a part of the Contract as if attached to this Agreement. | |
| 2. | Scope of the Work. The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and described in the specifications for the project titled: 2025 Rebid Skatepark Repair Project (the “Project”). Work performed shall be of high quality, in compliance with general accepted standards of workmanship, and in conformity with the Contract Documents. | |
| 3. | Time of Substantial Completion. The Contractor will commence the work required by the Contract Documents on the day indicated in the Notice to Proceed. The work to be performed pursuant to this Agreement shall be substantially completed, as that term is defined in the General Conditions, within ONE HUNDRED SEVENTY (170) calendar days of the Contractor having received Notice to Proceed. Any extensions of the time limit set forth above must be agreed upon in writing by the Parties. | |
| 4. | Liquidated Damages. It is specifically recognized by and between the Parties that the City will suffer certain unspecified damages in the event the Project is not completed within the time set forth above. In recognition of the difficulty of ascertaining the actual damages to be sustained by the City, the Parties agree that the assessment of liquidated damages shall be appropriate. In the event the Project is not completed within the specified time, there shall be assessed against the Contractor, and the Contractor hereby authorizes the City to retain from any moneys due the Contractor, the sum of $300.00 per day for each and every calendar day the Project remains unfinished. | |
| 5. | Contract Sum. The City certifies that funds have been appropriated and will pay to the Contractor such amounts in the manner and at such time as set forth by the Contract Documents. The City shall pay the Contractor for the performance of the Contract, subject to additions and deletions provided therein, the sum of ?????????????? ($?????????). Such sum shall be apportioned to each individual work item of the Contract. The total amount of the individual work items shall equal the total Contract amount. If the Time of Substantial Completion extends into more than one City budget year and the City has not appropriated the entire Contract Sum in the current budget year, the Contract becomes a multi-year financial obligation of the City and the City’s obligation to pay any amount of the Contract Sum beyond what has been appropriated in the current budget year is contingent upon the availability of funds appropriated by the City Council for each fiscal year budget during the term of the Contract. State of Colorado laws prohibit the City from entering into contracts that contain a multi-year financial obligation without a non-appropriation clause, so any financial obligations in the Contract that extend beyond the end of the City's current fiscal year budget shall be subject to an annual budget appropriation for all funds to be expended during the then current fiscal year. Absent the necessary appropriation, the City may terminate the Contract immediately and shall only be obligated to pay the Contractor for work rendered to the date of termination. | |
| 6. | Progress Payments. The City will make progress payments for the work included in the Contract based upon the percentage completion of the unit quantities actually installed for each work item of the Contract. The Contractor shall prepare an itemized statement indicating by unit quantities the amount of each item completed for that period. The Project Manager will review the progress payment request to verify the quantities indicated. The City shall retain at least FIVE percent (5%) of the amount of each payment until final completion and acceptance of all work covered by the Contract Documents. | |
| 7. | Final Payment. Final payment shall be paid by the City to the Contractor forty-five (45) days after substantial completion of the work unless otherwise stipulated in the Notice of Substantial Completion, the date fixed for final settlement as legally published, provided the work has then been completed, the Contract fully performed, and a final certificate of payment has been issued by the Engineer. | |
| 8. | Capital Project Management System. The services to be performed by the Contractor pursuant to this Agreement will be administered under the Capital Project Management System of the City. In order to ensure that the Project is consistent with its authorized scope, budget, and schedule, it will be necessary for the Contractor to submit certain reports to the city. The following reports are required: | |
| A) | Schedule of Work. The Contractor shall provide a schedule for the completion of all unit work items covered by the Contract. The schedule shall indicate the anticipated percentage completion of each unit work item for each month for the duration of the work. The initial schedule must be submitted to the City prior to processing of the first payment request. The schedule will be updated monthly thereafter and submitted with succeeding payment requests, which requests will not be processed in the absence of the updated schedules or work. | |
| B) | Estimated Schedule of Payments. The Contractor shall provide an estimated schedule of monthly payments as a percentage of the total contract sum for each month throughout the term of the Contract. The estimated schedule of payments shall be submitted to the City before the first payment request will be processed. | |
| C) | Personnel Manpower List. The Contractor shall submit a listing of personnel required to complete each unit work item of the Contract. The personnel manpower list shall include position title, duties, and duration necessary on the job to complete the unit work items as specified in the Contract Documents. The manpower list shall be submitted to the City before the first payment request will be processed. | |
| D) | Cost Breakdown. The Contract sum shall be allocated among the various unit work items. For contracts which are bid on a unit price basis, said allocation is reflected in the bid documents. For contracts which are bid on a lump sum basis, the Contractor shall allocate the contract sum to the various unit work items. The total cost of the unit work items shall equal the contract sum and the cost allocation shall be submitted to the City before the first payment request will be processed. The failure to file any report required by this Agreement shall automatically suspend the processing of all payment requests. | |
| 9. | City Representative and Engineer. The City hereby designates Assistant Director of Parks and Recreation, as its project representative (Project Manager), and authorizes this individual to make all necessary and proper decisions with reference to the Project. All Contract interpretations, Change Orders, and other requests for clarification or instruction shall be directed to the City representative, who shall be authorized to bind the City with respect to any decision made in accordance with the Capital Project Management Control System. | |
| 10. | Change Orders. The City may order changes within the scope of the work without invalidating this Agreement. If such changes alter the amount due under the Contract Documents, or in the time required for the performance of the work, such alteration shall be approved by both Parties in writing on the Change Order. A Change Order that alters the scope of the work, but not the amount due or the time required, shall be approved by both Parties in writing. Such Change Orders shall be processed in accordance with the procedures specified in the City Capital Project Management System and in accordance with the City purchasing ordinance. The Contractor shall not proceed with any work covered by a proposed Change Order until they receive a properly executed Change Order form. | |
| 11. | Governing Law, Jurisdiction and Dispute Resolution. This Agreement shall be governed by the laws of the State of Colorado, the Charter of the City of Cortez, and the Codes and Regulations of the City of Cortez. The Parties agree that jurisdiction and venue for any legal action arising from or out of the Contract shall be in the 22nd Judicial District, Montezuma County, Colorado, District Court, and that no mandatory arbitration or trial to a jury shall be allowed. | |
| 12. | Termination/Default. | |
| A) | Termination. This Agreement may be terminated by either Party upon ten (10) days written notice should the other Party materially fail to perform in accordance with its terms, through no fault of the Party instituting the termination. This Agreement may be terminated by the City upon at least ten (10) days written notice to the Contractor in the event the Project is permanently abandoned by the City. In the event of termination not the fault of the Contractor, the Contractor shall be compensated for all services performed to termination date, together with reasonable expenses then due. | |
| B) | Default. Each and every term and condition of this Agreement shall be deemed to be a material element of this Agreement. Time is of the essence. In the event either Party should fail or refuse to perform according to the terms of this Agreement, they may be declared in default hereof. A Notice of Default shall be in writing and signed by the Party declaring the Contract to be in default. This letter shall include the special portion or portions of the Contract which are in default. | |
| C) | Remedies Upon Default. In the event a Party has been declared in default hereof, such defaulting Party shall be allowed a period of five (5) days within which to rectify said default. In the event the default remains uncorrected, the non-defaulting Party may elect to (1) terminate the Agreement and seek damages; (2) treat the Agreement as continuing and require specific performance; or (3) avail themselves of any other remedy at law or equity. If the Contractor defaults or neglects to carry out the work in accordance with this Agreement, the City may elect to make good such deficiencies and charge the Contractor therefore. In the event of any of the agreements herein by either Party which shall require the Party not in default to commence legal or equitable actions against the defaulting Party, the defaulting Party shall be liable to the non-defaulting Party for the non-defaulting Party’s reasonable attorney fees and costs incurred because of the fault. | |
| 13. | Assignment. It is understood that the City enters into this Agreement based on the special abilities of the Contractor and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Contractor shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. | |
| In WITNESS WHEREOF, the Parties have executed or caused to be executed by their duly-authorized officials this Agreement effective as of the Effective Date written above. | ||
| THE CITY OF CORTEZ, COLORADO: |
Drew C. Sanders, City Manager
ATTEST:
Linda L. Smith, City Clerk
CONTRACTOR: ??????????????????
Authorized Representative Signature Printed Name
Title
Fed ID #
APPENDIX C - BID FORM
City of Cortez General Services
BID FORM
Institution/Agency:
Project No./Name:
Bidder Acknowledges Receipt of Addenda Numbers:
| Bidder Anticipates Services outside the United States or Colorado. * |
| No ☐ |
| Yes ☐ If Yes see 3A below |
| Bidder will comply with 80% Colorado Labor on project above $500,000: |
| Yes☐ |
| No ☐ If No see 3B below |
| Bidder is a Service-Disabled Veteran Owned Small Business: * |
| No ☐ |
| Yes ☐ If Yes see 3C below |
Base Bid
(Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable)
Bidder’s Time of Completion
a. Time Period from Notice to Proceed to Substantial Completion:
b. Time Period from Substantial Completion to Final Acceptance:
c. Total Time of Completion of Entire Project (a + b):
| 1. | BID: Pursuant to the advertisement by the city of Cortez dated | 4/16,2025 the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable. |
| 2. | EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done. | |
| 3. | PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid. |
A. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) * B. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project. Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) * C. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs. Attach proof of certification along with the bid submission. * D. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S. 24-92-115 E. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
| 4. | BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the City may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy. |
| 5. | TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract. |
| 6. | EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications. |
| 7. | ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents. |
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.
Dated this
Day of
| , |
| 20 |
THE BIDDER:
Company Name
Address (including city, state and zip)
Phone number:
Name (Print) and Title
Signature
APPENDIX C1 - INFORMATION FOR BIDDERS
City of Cortez General Services
INFORMATION FOR BIDDERS
| Institution or Agency: |
| City of Cortez |
| Project No./Name: |
| GS – 25 – 04-SPR |
1. BID FORM: Bidders are required to use the Bid form attached to the bidding documents. Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, also in calendar days. Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
INSTRUCTIONS FOR BID SUBMISSION
(3) hard copies of the bid are due 4/30/2025 3:00 P.M. at the following address:
110 West Progress Circle Cortez, CO 81321 Submissions must be titled with the ADVERTISEMENT FOR BID (AFB) Number, AFB Title, and the Offeror’s name as noted below:
GS – 25 – 04 – SRP – 2025 REBID SKATEPARK REPAIR PROJECT FOR CITY OF CORTEZ
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: The bidder’s attention is called to the fact that all work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. Each bid must be accompanied by a bid bond or a certified check payable to the City of Cortez. No bid will be considered unless it is accompanied by the required guaranty. When the successful bidder has been identified and a Notice of Award issued the remaining bid bonds will be returned to unsuccessful bidders. Upon Notice of Award, the successful bidder will be required to obtain a Performance Bond and a Separate Payment Bond for 100% of its bid.
5. TAXES: The bidder’s attention is called to the fact that the Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two (2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative. Bidders should note the Method of Award is applicable to this Bid as stated below.
| A. | DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with deductible alternates, deducted in numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
| B. | ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid plus all additive alternates added in the numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder. |
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
10. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation (Advertisement for Bids, Documented Quotes, or Requests for Proposals) whether settlement will be advertised in newspapers or electronic media.
APPENDIX D - CONSTRUCTION AND MATERIALS SUMMARY
The scope of work and materials to be used in this project are summarized below. If conflicts or differences arise, the specifications below take precedence.
1. SCOPE: This specification covers the furnishing of materials used in and the placement of the concrete surface course. concrete surface course materials shall be placed in accordance with these specifications.
This item assumes that underlying courses have been inspected, tested, and approved by the Owner’s Representative, in accordance with City of Cortez requirements. Due diligence should be performed in establishing conformance of underlying courses prior to beginning of operations.
2. MATERIALS:
a. Concrete: Ardex Concrete Patch (or equivalent) shall be used. Mixing Ratio: 5 quarts (4.75 L) water bag; for smaller batches, use 2.75 parts powder to 1 part water by volume Material Requirements on Smooth Substrate (approx.): 22.5 sq. ft. per bag at 1/4″ (2.1 sq. m at 6mm). Application methods and the texture of the concrete being coated will affect this rate. ARDEX CP™ is a trowel-grade, cementitious topping for filling and repairing areas of indoor and outdoor concrete above, on or below grade.
i. Key Features
1. Portland cement-based concrete patch and fill
2. Repair, re-slope and re-form all concrete surfaces
3. Easy to apply and hardens quickly
4. Installs from 1/4″ to 1/2″ (6 to 12 mm) neat, and up to 2″ (5 cm) with aggregate
5. Freeze-thaw resistant
6. Suitable for foot and rubber tire traffic
7. Suitable for commercial and residential applications
8. Use for interior and exterior floors and walls
b. Sealant: Single Seal/Freeze Protect (or equivalent) shall be used. Product can be sprayed, brushed, or rolled on. It can be used on substrates ranging from freshly poured (green) to those that are completely cured (existing). If using on freshly poured materials, make sure that all excess water has been removed (no puddling) and that the material is firm to the touch.
3. Skatepark Area Repair Dimensions North Bowl 8' x 8' 4' x 10' Total = 104 sf North Entrance to the South Entrance - Flat Area 1' x 1' 4' x 1' 5' x 2' 4' x 4' 3' x 9' 3' x 5' 4' x 7' 8' x 9' Total = 173 sf
South Bowl 4' x 6' 9' x 4' Total = 60 sf
Eastside Flat Area 1' x 2' 1' x 3' 3' x 6' Total = 23 sf
1/2 Bowl - Southside 4' x 4' 5' x 2' Total = 26 sf Steps with Grind Rail 4' x 6' 4' x 7' 1' x 5' 1' x 5' Total = 62 sf
Eastside Curved 1' x 3' 9' x 1.5' 6' x 6' 6' x 12' Total = 124.5 sf Curved Area near South Entrance 1' x 2' 6' x 3' 1' x 7' Total = 27 sf
South Entrance Steps 1' x 5.5' 1' x 4' 1' x 2' Total = 11.5 sf On Top of East Side 8' x 1' 7' x 1' 1' x 2' Total = 17 sf
Northeast Top Sidewalk 8' x 8' 4' x 6' Total = 88 sf Bench or Tabletop on Top of East Side 26' x 1.5' Total = 39 sf
APPENDIX E - LOCAL VENDOR PREFERENCE
Service Center 110 West Progress Circle Cortez, CO 81321
LOCAL VENDOR PREFERENCE
Adopted by Council Resolution No. 14, Series 2021 The City of Cortez supports the procurement of goods and services locally.
The Cortez City Council adopted the “Local Vendor Preference” for the procurement of goods and services on June 8, 2021, as stated below:
· Business located within the City Limits = 2.5% Vendor Preference
· Business located in Montezuma County not in City Limits = 2.0% Vendor Preference
· Total amount of preference is not to exceed $25,000.
· In-City and County-preference cannot be combined.
“Local Vendor” is determined by:
· An established business located within the City of Cortez City limits shall be eligible for the 2.5% preference.
· An established business located within the boundaries of Montezuma County shall be eligible for the 2.0% preference.
· A business outside the City Limits or County boundaries with a sales representative who works out of his home within the City or County limits does not qualify for preference.
· Goods and services procured with the aid of grant funding and/or Federal or State of Colorado funds.
The City local vendor preference shall defer to the procurement rules of the grant or funding entity.