This is an asbestos inspection report related to a roof replacement project at Fire Station #3 in Connecticut. The document supports the state and local contract opportunity for the removal and replacement of approximately 7,100 square feet of existing ballasted built-up roofing with a new EPDM membrane roofing system. The project scope includes removal and off-site disposal of existing roofing materials, insulation, cant strips, tapered edge components, and metal flashings, along with removal and replacement of the roof hatch, deteriorated roof decking, wood blocking, roof drains, and associated piping. The contractor must furnish and install a complete roofing system including underlayment, flat and tapered insulation, blocking, EPDM membrane, new flashings, coping, fascia, sheet metal trim, and new scuppers, all in accordance with project specifications and applicable codes.
The asbestos inspection report is a critical supporting document that identifies and documents the presence of asbestos-containing materials within the existing roof assembly prior to demolition and removal. This inspection is essential for ensuring compliance with environmental regulations and establishing proper handling, containment, and disposal procedures for hazardous materials. The findings from this inspection directly impact project planning, contractor qualifications, safety protocols, and disposal cost estimates, making it a prerequisite document for bid preparation and project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 10, 2021
Chris Till, P.E.
Town of Manchester Facilities Manager P.O. Box 191 321 Olcott Street Manchester, CT 06045-0191
RE: Limited Pre-Renovation Asbestos Inspection at Manchester Fire Station #1, 138 McKee Street, Manchester, CT and Fire Station #3, 11 Weaver Road, Manchester, CT
Mr. Till:
TRC was retained by the Town of Manchester to perform a limited pre-renovation Hazardous Materials Inspection for Asbestos Containing Materials (ACM) at the Manchester Fire Stations #1 and #3 in Manchester, CT. The inspection scope of work was limited to materials which could be impacted as part of a roof renovation/replacement project.
INSPECTION
Asbestos Tyler MacGillivray, State of Connecticut Licensed asbestos inspector (CT LIC# 001021), performed the above noted inspection on June 2, 2021. The inspection was conducted in accordance with current USEPA Asbestos Hazard Emergency Response Act (AHERA) (40 CFR Part 763 Subpart E) guidelines. The site inspection began with a visual survey of all exterior roof areas identified in the scope of work, in order to identify any suspect ACM that may be disturbed during renovation activities. Representative bulk samples of the suspect homogenous materials identified were then collected in accordance with AHERA sampling protocols. The collected bulk samples were transported following proper chain-of-custody procedures to the TRC laboratory in Windsor, Connecticut for analysis by Polarized Light Microscopy (PLM) with visual area estimation (vae) quantification, PLM EPA 600/R93/116. TRC’s laboratory is a CTDPH/ National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory.
RESULTS & OBSERVATIONS:
No ACM was identified on the roof areas of Fire Stations #1 & #3.
See Table 1 for detailed Asbestos bulk sampling results and attached drawings for asbestos sample locations.
Attached please find the Asbestos Bulk Sample Summary Table (Table 1), site sketches w/sampling locations, TRC bulk chain of custody forms, bulk asbestos laboratory reports, appropriate personnel & laboratory licenses and certifications and TRC’s mobile data solution reports.
Very truly yours, TRC
Gregory Kaczynski Project Manager
PL
M
G ra vi m et ric
A na ly si s g cr uc ib le de ci m al
A sb
A sb
D at e An al ys t La b Lo g
Sa m pl e
ID
C ru ci bl e
ID
g cr uc ib le pl us s am pl e g af te r 4 o
R es id ue in re si du e to ta l S am pl e
6/ 4/
KW
.2
.1
.7
0.
0.
0.
.5
.3
.8
0.
0.
0.
.7
.4
.0
0.
0.
0.
.5
.9
.0
0.
0.
0.
.1
.7
.4
0.
0.
0.
.7
.5
.9
0.
0.
0.
6/ 7/
3.
M an ch es te r G ra vi m et ric
.x ls
PL
M
G ra vi m et ric
A na ly si s g cr uc ib le de ci m al
A sb
A sb
D at e An al ys t La b Lo g
Sa m pl e
ID
C ru ci bl e
ID
g cr uc ib le pl us s am pl e g af te r 4 o
R es id ue in re si du e to ta l S am pl e
6/ 4/
KW
.5
.5
.8
0.
0.
0.
.6
.1
.4
0.
0.
0.
.9
.6
.1
0.
0.
0.
.4
.0
.5
0.
0.
0.
.6
.0
.7
0.
0.
0.
.3
.5
.3
0.
0.
0.
.8
.3
.9
2.
0.
0.
.4
.0
.6
0.
0.
0.
6/ 7/
2.
M an ch es te r G ra vi m et ric
.x ls
State of Connecticut
Lookup Detail View Name
Name
TYLER E MACGILLIVRAY
License Information lookup
License Type License Number
Expiration Date
Granted Date License Name
License Status
Licensure Actions or Pending Charges
Asbestos Consultant- Inspector
1021 04/30/2022 02/05/2019 TYLER E
MACGILLIVRAY
ACTIVE CURRENT None
Generated on: 6/7/2021 1:09:58 PM
WinBSI HBM Survey
WinBSI HBM Survey Manchester DPW, Fire Station 1, 138 McKee ST Manchester CT
6/9/2021, 4:48:57 PM UTC
CREATED
6/2/2021, 11:33:46 AM UTC
by Tyler MacGillivray
UPDATED
6/9/2021, 4:48:57 PM UTC
by Gregory Kaczynski
STATUS
Survey In Progress
ASSIGNED TO
No Assignment
Area #1 lower roof C/D corner
JOB INFORMATION
Site Name Fire Station 1
Address 138 McKee ST Manchester CT
TRC Project Number
Project Manager Greg Kaczynski
Inspector(s) Tyler Macgillivray
Client Manchester DPW
Type of Asbestos Survey Reno/Demo
Additional Testing for NOB Materials PLM EPA 600/R93/116 (w grav. red.)
Additional Analysis for NOB Materials (Calc)
PLM EPA 600/R93/116 (w grav. red.)
PLM Turnaround Time (TAT)
Date June 2, 2021
General Notes Lower roof:
- layer 1: built up roofing with stone, tar, and membrane
- layer 2: black tar paper vapor barrier
- layer 3: tan paper vapor barrier
Upper roof:
- layer 1: built up roofing with stone, tar, and membrane
- brown fiber board
- yellow insulation board
- black tar vapor barrier
- pink paper vapor barrier
AS-1 around all roof top units FC-1 on all roof top units / penetrations
Overview Photo
Area #1 lower roof C/D corner
Area #2 lower roof center
Area #3 lower roof A/B corner
Area 5 upper deck center
Area 5 upper roof B/C corner
Area #6 Upper roof D/ A corner
Upper roof facing side C
Lower roof facing side C & D
Lower roof
Site Sketch Diagrams
Options & Other Settings
Use auto-numbering? No
Auto-fill gaps? Yes
SURVEYS PERFORMED Asbestos
Asbestos Survey
Materials & Samples (8 Items)
Materials & Samples - 1. (2) Samples #1–2: BUR-1–Black tar built up roofing
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #1: BUR-1…Area #1
Sample Number 1
Sample Location Area #1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:03
Sample Location Photo
Asbestos Samples - 2. Sample #2: BUR-1…Area 2
Sample Number 2
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:03
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym BUR-1
Material Description Black tar built up roofing
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 2. (2) Samples #3–4: VB1–Black tar vapor barrier
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #3: N/A…Area #1
Sample Number 3
Sample Location Area #1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:03
Sample Location Photo
Asbestos Samples - 2. Sample #4: VB1…Area 2
Sample Number 4
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:04
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 1 Material Description Black tar vapor barrier
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 3. (2) Samples #5–6: VB2–Tan paper vapor barrier
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #5: N/A…Area #1
Sample Number 5
Sample Location Area #1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:04
Sample Location Photo
Asbestos Samples - 2. Sample #6: VB2…Area 2
Sample Number 6
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:05
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 2 Material Description Tan paper vapor barrier
Material Color Tan
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
No
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 4. (2) Samples #7–8: AS1–Grey / black asphalt roof with black glue
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #7: N/A…Upper roof RTU
Sample Number 7
Sample Location Upper roof RTU
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:40
Sample Location Photo
Asbestos Samples - 2. Sample #8: N/A…Lower roof side B perimeter
Sample Number 8
Sample Location Lower roof side B perimeter
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:41
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym AS ▸ 1 Material Description Grey / black asphalt roof with black glue
Representative Photos
Analyze by layer? Yes
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 5. (2) Samples #9–10: FC1–Black and grey roof flashing cement
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #9: N/A…Upper roof RTU
Sample Number 9
Sample Location Upper roof RTU
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:42
Sample Location Photo
Asbestos Samples - 2. Sample #10: N/A…Upper roof unit
Sample Number 10
Sample Location Upper roof unit
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:42
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym FC ▸ 1 Material Description Black and grey roof flashing cement
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 6. (2) Samples #11–12: BUR-2–Black tar built up roofing
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #11: BUR-2…Area 4
Sample Number 11
Sample Location Area 4
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:53
Sample Location Photo
Asbestos Samples - 2. Sample #12: BUR-2…Area 5
Sample Number 12
Sample Location Area 5
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:53
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym BUR-2
Material Description Black tar built up roofing
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Materials & Samples - 7. (2) Samples #13–14: VB3–Black tar vapor barrier
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #13: VB3…Area 4
Sample Number 13
Sample Location Area 4
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:56
Sample Location Photo
Asbestos Samples - 2. Sample #14: VB3…Area 5
Sample Number 14
Sample Location Area 5
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 08:56
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 3 Material Description Black tar vapor barrier
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 8. (2) Samples #15–16: VB4–Pink paper vapor barrier
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #15: VB4…Area 4
Sample Number 15
Sample Location Area 4
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:01
Sample Location Photo
Asbestos Samples - 2. Sample #16: VB4…Area 5
Sample Number 16
Sample Location Area 5
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:01
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 4 Material Description Pink paper vapor barrier
Material Color Pink
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
No
Homogeneous Area
Total Approximate Quantity
Notes
LAB & SAMPLE SUBMISSION INFO
Signature
Signed 6/2/2021, 3:48:18 PM UTC
Asbestos Bulk Samples
Remarks to be added to the CoC Please send results to GKaczynski and TMacGillivray
Asbestos samples submitted to TRC lab?
Yes
Date Submitted to Lab June 2, 2021
Asbestos bulk sample CoC data electronically sent to lab yet?
No
Asbestos bulk sample results reviewed?
No
Override sample number validation? No
REPORTING
Select one or more documents below to be generated. Once completed in the cloud, they will be sent to the listed email address.
NOTE: Asbestos bulk sample CoC data must now be sent electronically to the lab by selecting "Asbestos chain-of-custody - Send to Lab" from the list below.
What documents should be generated?
Asbestos chain-of-custody
Where should the document(s) be sent?
gkaczynski@trcsolutions.com
Generate Documents
WinBSI HBM Survey Manchester DPW, Fire Station 3, 11 Weaver Rd Manchester CT
6/9/2021, 4:49:37 PM UTC
CREATED
6/2/2021, 11:35:15 AM UTC
by Tyler MacGillivray
UPDATED
6/9/2021, 4:49:37 PM UTC
by Gregory Kaczynski
STATUS
Survey In Progress
ASSIGNED TO
No Assignment
Area 1 lower roof side A
JOB INFORMATION
Site Name Fire Station 3
Address 11 Weaver Rd Manchester CT
TRC Project Number
Project Manager Greg Kaczynski
Inspector(s) Tyler Macgillivray
Client Manchester DPW
Type of Asbestos Survey Reno/Demo
Additional Testing for NOB Materials PLM EPA 600/R93/116 (w grav. red.)
Additional Analysis for NOB Materials (Calc)
PLM EPA 600/R93/116 (w grav. red.)
PLM Turnaround Time (TAT)
Date June 2, 2021
General Notes
Overview Photo
Area 1 lower roof side A
Area 2 lower roof center
Area 3 lower roof C/D corner
Area 4 upper roof B/ C corner
Area 5 upper roof center
Lower roof facing side A
Lower roof facing side C
Upper roof facing side A
Site Sketch Diagrams
Options & Other Settings
Use auto-numbering? No
Auto-fill gaps? Yes
SURVEYS PERFORMED Asbestos
Asbestos Survey
Materials & Samples (9 Items)
Upper roof facing side C
Materials & Samples - 1. (2) Samples #1–2: FC1–Black and grey roof flashing
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #1: FC1…Lower roof elevation change
Sample Number 1
Sample Location Lower roof elevation change
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:24
Sample Location Photo
Asbestos Samples - 2. Sample #2: FC1…Upper roof RTU
Sample Number 2
Sample Location Upper roof RTU
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:24
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym FC ▸ 1 Material Description Black and grey roof flashing
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 2. (2) Samples #3–4: BUR-1–Black tar built up roofing membrane
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #3: BUR-1…Area 1
Sample Number 3
Sample Location Area 1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:25
Sample Location Photo
Asbestos Samples - 2. Sample #4: BUR-1…Area 2
Sample Number 4
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:25
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym BUR-1
Material Description Black tar built up roofing membrane
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Materials & Samples - 3. (2) Samples #5–6: VB1–Black tar vapor barrier
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #5: VB1…Area 1
Sample Number 5
Sample Location Area 1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:40
Sample Location Photo
Asbestos Samples - 2. Sample #6: VB1…Area 2
Sample Number 6
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:40
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 1 Material Description Black tar vapor barrier
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 4. (2) Samples #7–8: VB2–Tan paper vapor barrier
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #7: VB2…Area 1
Sample Number 7
Sample Location Area 1
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:41
Sample Location Photo
Asbestos Samples - 2. Sample #8: VB2…Area 2
Sample Number 8
Sample Location Area 2
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:41
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 2 Material Description Tan paper vapor barrier
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
No
Homogeneous Area
Total Approximate Quantity
Materials & Samples - 5. (2) Samples #9–10: PB-1–Black pitch box tar
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #9: PB-1…Lower level elevation change
Sample Number 9
Sample Location Lower level elevation change
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:43
Sample Location Photo
Asbestos Samples - 2. Sample #10: PB-1…Upper level side D
Sample Number 10
Sample Location Upper level side D
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 09:43
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym PB-1
Material Description Black pitch box tar
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 6. (2) Samples #11–12: CS-1–Stretchy tan roof top cap sealant
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #11: CS-1…Upper roof top cap
Sample Number 11
Sample Location Upper roof top cap
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:02
Sample Location Photo
Asbestos Samples - 2. Sample #12: CS-1…Upper roof top cap
Sample Number 12
Sample Location Upper roof top cap
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:02
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym CS-1
Material Description Stretchy tan roof top cap sealant
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 7. (2) Samples #13–14: BUR-2–Black tar built up roof membrane
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #13: BUR-2…Area 4
Sample Number 13
Sample Location Area 4
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:03
Sample Location Photo
Asbestos Samples - 2. Sample #14: BUR-2…Area 5
Sample Number 14
Sample Location Area 5
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:03
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym BUR-2
Material Description Black tar built up roof membrane
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 8. (2) Samples #15–16: VB3–Black tar vapor barrier
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #15: VB3…Area 4
Sample Number 15
Sample Location Area 4
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:04
Sample Location Photo
Asbestos Samples - 2. Sample #16: VB3…Area 5
Sample Number 16
Sample Location Area 5
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 10:04
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym VB ▸ 3 Material Description Black tar vapor barrier
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
Notes
Materials & Samples - 9. (2) Samples #17–18: AS1–Grey and black asphalt roof with black glue
Sample Information
Asbestos Samples (2 Items)
Asbestos Samples - 1. Sample #17: N/A…Lower roof elevation change (side B)
Sample Number 17
Sample Location Lower roof elevation change (side B)
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 12:14
Sample Location Photo
Asbestos Samples - 2. Sample #18: N/A…upper roof roof cap
Sample Number 18
Sample Location upper roof roof cap
Asbestos Bulk Analysis PLM EPA 600/R93/116
Grab or Composite Grab
Date June 2, 2021
Time 12:14
Sample Location Photo
Material Information
Sampled or Assumed? Sampled
Material Acronym AS ▸ 1 Material Description Grey and black asphalt roof with black glue
Material Color Black
Representative Photos
Analyze by layer? No
Is material non-friable organically bound (NOB)?
Yes
Homogeneous Area
Total Approximate Quantity
LAB & SAMPLE SUBMISSION INFO
Signature
Signed 6/2/2021, 3:49:21 PM UTC
Asbestos Bulk Samples
Remarks to be added to the CoC Please send results to GKaczynski and TMacGillivray
Asbestos samples submitted to TRC lab?
Yes
Date Submitted to Lab June 2, 2021
Asbestos bulk sample CoC data electronically sent to lab yet?
No
Asbestos bulk sample results reviewed?
No
Override sample number validation? No
REPORTING
Select one or more documents below to be generated. Once completed in the cloud, they will be sent to the listed email address.
NOTE: Asbestos bulk sample CoC data must now be sent electronically to the lab by selecting "Asbestos chain-of-custody - Send to Lab" from the list below.
What documents should be generated?
Asbestos chain-of-custody
Where should the document(s) be sent?
gkaczynski@trcsolutions.com
Generate Documents
| 2021-58 FIRE STA 1 ROOF REPLACEMENT ADD 1 |
| 20.242 Fire Station #1 Roof Replacement - Addendum #1 |
| FS#1RRADD#1 |
| DATE: June 10, 2021 |
| End of Addendum ‘1’ |
| 20.242 #1 Sign-In Sheet 06.03.21 |
| TRC Asbestos Inspection Report for Fire Station #1 & 3 Roofs - June 2021 |
File details come from the government source that posted it. Updated .