RE-Bid_FIRE_STA_3_ROOF_REPLACEMENT_Asbestos_Inspection.pdf

PDF 7 MB Posted

Attached to
ROOF REPLACEMENT AT FIRE STATION #3
Solicitation number
25/26-78
Issued by
Hartford County, Connecticut

About this file

This is an asbestos inspection report related to a roof replacement project at Fire Station #3 in Connecticut. The document supports the state and local contract opportunity for the removal and replacement of approximately 7,100 square feet of existing ballasted built-up roofing with a new EPDM membrane roofing system. The project scope includes removal and off-site disposal of existing roofing materials, insulation, cant strips, tapered edge components, and metal flashings, along with removal and replacement of the roof hatch, deteriorated roof decking, wood blocking, roof drains, and associated piping. The contractor must furnish and install a complete roofing system including underlayment, flat and tapered insulation, blocking, EPDM membrane, new flashings, coping, fascia, sheet metal trim, and new scuppers, all in accordance with project specifications and applicable codes.

The asbestos inspection report is a critical supporting document that identifies and documents the presence of asbestos-containing materials within the existing roof assembly prior to demolition and removal. This inspection is essential for ensuring compliance with environmental regulations and establishing proper handling, containment, and disposal procedures for hazardous materials. The findings from this inspection directly impact project planning, contractor qualifications, safety protocols, and disposal cost estimates, making it a prerequisite document for bid preparation and project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 10, 2021

Chris Till, P.E.

Town of Manchester Facilities Manager P.O. Box 191 321 Olcott Street Manchester, CT 06045-0191

RE: Limited Pre-Renovation Asbestos Inspection at Manchester Fire Station #1, 138 McKee Street, Manchester, CT and Fire Station #3, 11 Weaver Road, Manchester, CT

Mr. Till:

TRC was retained by the Town of Manchester to perform a limited pre-renovation Hazardous Materials Inspection for Asbestos Containing Materials (ACM) at the Manchester Fire Stations #1 and #3 in Manchester, CT. The inspection scope of work was limited to materials which could be impacted as part of a roof renovation/replacement project.

INSPECTION

Asbestos Tyler MacGillivray, State of Connecticut Licensed asbestos inspector (CT LIC# 001021), performed the above noted inspection on June 2, 2021. The inspection was conducted in accordance with current USEPA Asbestos Hazard Emergency Response Act (AHERA) (40 CFR Part 763 Subpart E) guidelines. The site inspection began with a visual survey of all exterior roof areas identified in the scope of work, in order to identify any suspect ACM that may be disturbed during renovation activities. Representative bulk samples of the suspect homogenous materials identified were then collected in accordance with AHERA sampling protocols. The collected bulk samples were transported following proper chain-of-custody procedures to the TRC laboratory in Windsor, Connecticut for analysis by Polarized Light Microscopy (PLM) with visual area estimation (vae) quantification, PLM EPA 600/R93/116. TRC’s laboratory is a CTDPH/ National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory.

RESULTS & OBSERVATIONS:

No ACM was identified on the roof areas of Fire Stations #1 & #3.

See Table 1 for detailed Asbestos bulk sampling results and attached drawings for asbestos sample locations.

Attached please find the Asbestos Bulk Sample Summary Table (Table 1), site sketches w/sampling locations, TRC bulk chain of custody forms, bulk asbestos laboratory reports, appropriate personnel & laboratory licenses and certifications and TRC’s mobile data solution reports.

Very truly yours, TRC

Gregory Kaczynski Project Manager

PL

M

G ra vi m et ric

A na ly si s g cr uc ib le de ci m al

A sb

A sb

D at e An al ys t La b Lo g

Sa m pl e

ID

C ru ci bl e

ID

g cr uc ib le pl us s am pl e g af te r 4 o

R es id ue in re si du e to ta l S am pl e

6/ 4/

KW

.2

.1

.7

0.

0.

0.

.5

.3

.8

0.

0.

0.

.7

.4

.0

0.

0.

0.

.5

.9

.0

0.

0.

0.

.1

.7

.4

0.

0.

0.

.7

.5

.9

0.

0.

0.

6/ 7/

3.

M an ch es te r G ra vi m et ric

.x ls

PL

M

G ra vi m et ric

A na ly si s g cr uc ib le de ci m al

A sb

A sb

D at e An al ys t La b Lo g

Sa m pl e

ID

C ru ci bl e

ID

g cr uc ib le pl us s am pl e g af te r 4 o

R es id ue in re si du e to ta l S am pl e

6/ 4/

KW

.5

.5

.8

0.

0.

0.

.6

.1

.4

0.

0.

0.

.9

.6

.1

0.

0.

0.

.4

.0

.5

0.

0.

0.

.6

.0

.7

0.

0.

0.

.3

.5

.3

0.

0.

0.

.8

.3

.9

2.

0.

0.

.4

.0

.6

0.

0.

0.

6/ 7/

2.

M an ch es te r G ra vi m et ric

.x ls

State of Connecticut

Lookup Detail View Name

Name

TYLER E MACGILLIVRAY

License Information lookup

License Type License Number

Expiration Date

Granted Date License Name

License Status

Licensure Actions or Pending Charges

Asbestos Consultant- Inspector

1021 04/30/2022 02/05/2019 TYLER E

MACGILLIVRAY

ACTIVE CURRENT None

Generated on: 6/7/2021 1:09:58 PM

WinBSI HBM Survey

WinBSI HBM Survey Manchester DPW, Fire Station 1, 138 McKee ST Manchester CT

6/9/2021, 4:48:57 PM UTC

CREATED

6/2/2021, 11:33:46 AM UTC

by Tyler MacGillivray

UPDATED

6/9/2021, 4:48:57 PM UTC

by Gregory Kaczynski

STATUS

Survey In Progress

ASSIGNED TO

No Assignment

Area #1 lower roof C/D corner

JOB INFORMATION

Site Name Fire Station 1

Address 138 McKee ST Manchester CT

TRC Project Number

Project Manager Greg Kaczynski

Inspector(s) Tyler Macgillivray

Client Manchester DPW

Type of Asbestos Survey Reno/Demo

Additional Testing for NOB Materials PLM EPA 600/R93/116 (w grav. red.)

Additional Analysis for NOB Materials (Calc)

PLM EPA 600/R93/116 (w grav. red.)

PLM Turnaround Time (TAT)

Date June 2, 2021

General Notes Lower roof:

- layer 1: built up roofing with stone, tar, and membrane

- layer 2: black tar paper vapor barrier

- layer 3: tan paper vapor barrier

Upper roof:

- layer 1: built up roofing with stone, tar, and membrane

- brown fiber board

- yellow insulation board

- black tar vapor barrier

- pink paper vapor barrier

AS-1 around all roof top units FC-1 on all roof top units / penetrations

Overview Photo

Area #1 lower roof C/D corner

Area #2 lower roof center

Area #3 lower roof A/B corner

Area 5 upper deck center

Area 5 upper roof B/C corner

Area #6 Upper roof D/ A corner

Upper roof facing side C

Lower roof facing side C & D

Lower roof

Site Sketch Diagrams

Options & Other Settings

Use auto-numbering? No

Auto-fill gaps? Yes

SURVEYS PERFORMED Asbestos

Asbestos Survey

Materials & Samples (8 Items)

Materials & Samples - 1. (2) Samples #1–2: BUR-1–Black tar built up roofing

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #1: BUR-1…Area #1

Sample Number 1

Sample Location Area #1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:03

Sample Location Photo

Asbestos Samples - 2. Sample #2: BUR-1…Area 2

Sample Number 2

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:03

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym BUR-1

Material Description Black tar built up roofing

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 2. (2) Samples #3–4: VB1–Black tar vapor barrier

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #3: N/A…Area #1

Sample Number 3

Sample Location Area #1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:03

Sample Location Photo

Asbestos Samples - 2. Sample #4: VB1…Area 2

Sample Number 4

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:04

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 1 Material Description Black tar vapor barrier

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 3. (2) Samples #5–6: VB2–Tan paper vapor barrier

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #5: N/A…Area #1

Sample Number 5

Sample Location Area #1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:04

Sample Location Photo

Asbestos Samples - 2. Sample #6: VB2…Area 2

Sample Number 6

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:05

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 2 Material Description Tan paper vapor barrier

Material Color Tan

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

No

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 4. (2) Samples #7–8: AS1–Grey / black asphalt roof with black glue

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #7: N/A…Upper roof RTU

Sample Number 7

Sample Location Upper roof RTU

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:40

Sample Location Photo

Asbestos Samples - 2. Sample #8: N/A…Lower roof side B perimeter

Sample Number 8

Sample Location Lower roof side B perimeter

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:41

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym AS ▸ 1 Material Description Grey / black asphalt roof with black glue

Representative Photos

Analyze by layer? Yes

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 5. (2) Samples #9–10: FC1–Black and grey roof flashing cement

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #9: N/A…Upper roof RTU

Sample Number 9

Sample Location Upper roof RTU

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:42

Sample Location Photo

Asbestos Samples - 2. Sample #10: N/A…Upper roof unit

Sample Number 10

Sample Location Upper roof unit

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:42

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym FC ▸ 1 Material Description Black and grey roof flashing cement

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 6. (2) Samples #11–12: BUR-2–Black tar built up roofing

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #11: BUR-2…Area 4

Sample Number 11

Sample Location Area 4

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:53

Sample Location Photo

Asbestos Samples - 2. Sample #12: BUR-2…Area 5

Sample Number 12

Sample Location Area 5

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:53

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym BUR-2

Material Description Black tar built up roofing

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Materials & Samples - 7. (2) Samples #13–14: VB3–Black tar vapor barrier

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #13: VB3…Area 4

Sample Number 13

Sample Location Area 4

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:56

Sample Location Photo

Asbestos Samples - 2. Sample #14: VB3…Area 5

Sample Number 14

Sample Location Area 5

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 08:56

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 3 Material Description Black tar vapor barrier

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 8. (2) Samples #15–16: VB4–Pink paper vapor barrier

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #15: VB4…Area 4

Sample Number 15

Sample Location Area 4

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:01

Sample Location Photo

Asbestos Samples - 2. Sample #16: VB4…Area 5

Sample Number 16

Sample Location Area 5

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:01

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 4 Material Description Pink paper vapor barrier

Material Color Pink

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

No

Homogeneous Area

Total Approximate Quantity

Notes

LAB & SAMPLE SUBMISSION INFO

Signature

Signed 6/2/2021, 3:48:18 PM UTC

Asbestos Bulk Samples

Remarks to be added to the CoC Please send results to GKaczynski and TMacGillivray

Asbestos samples submitted to TRC lab?

Yes

Date Submitted to Lab June 2, 2021

Asbestos bulk sample CoC data electronically sent to lab yet?

No

Asbestos bulk sample results reviewed?

No

Override sample number validation? No

REPORTING

Select one or more documents below to be generated. Once completed in the cloud, they will be sent to the listed email address.

NOTE: Asbestos bulk sample CoC data must now be sent electronically to the lab by selecting "Asbestos chain-of-custody - Send to Lab" from the list below.

What documents should be generated?

Asbestos chain-of-custody

Where should the document(s) be sent?

gkaczynski@trcsolutions.com

Generate Documents

WinBSI HBM Survey Manchester DPW, Fire Station 3, 11 Weaver Rd Manchester CT

6/9/2021, 4:49:37 PM UTC

CREATED

6/2/2021, 11:35:15 AM UTC

by Tyler MacGillivray

UPDATED

6/9/2021, 4:49:37 PM UTC

by Gregory Kaczynski

STATUS

Survey In Progress

ASSIGNED TO

No Assignment

Area 1 lower roof side A

JOB INFORMATION

Site Name Fire Station 3

Address 11 Weaver Rd Manchester CT

TRC Project Number

Project Manager Greg Kaczynski

Inspector(s) Tyler Macgillivray

Client Manchester DPW

Type of Asbestos Survey Reno/Demo

Additional Testing for NOB Materials PLM EPA 600/R93/116 (w grav. red.)

Additional Analysis for NOB Materials (Calc)

PLM EPA 600/R93/116 (w grav. red.)

PLM Turnaround Time (TAT)

Date June 2, 2021

General Notes

Overview Photo

Area 1 lower roof side A

Area 2 lower roof center

Area 3 lower roof C/D corner

Area 4 upper roof B/ C corner

Area 5 upper roof center

Lower roof facing side A

Lower roof facing side C

Upper roof facing side A

Site Sketch Diagrams

Options & Other Settings

Use auto-numbering? No

Auto-fill gaps? Yes

SURVEYS PERFORMED Asbestos

Asbestos Survey

Materials & Samples (9 Items)

Upper roof facing side C

Materials & Samples - 1. (2) Samples #1–2: FC1–Black and grey roof flashing

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #1: FC1…Lower roof elevation change

Sample Number 1

Sample Location Lower roof elevation change

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:24

Sample Location Photo

Asbestos Samples - 2. Sample #2: FC1…Upper roof RTU

Sample Number 2

Sample Location Upper roof RTU

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:24

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym FC ▸ 1 Material Description Black and grey roof flashing

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 2. (2) Samples #3–4: BUR-1–Black tar built up roofing membrane

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #3: BUR-1…Area 1

Sample Number 3

Sample Location Area 1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:25

Sample Location Photo

Asbestos Samples - 2. Sample #4: BUR-1…Area 2

Sample Number 4

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:25

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym BUR-1

Material Description Black tar built up roofing membrane

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Materials & Samples - 3. (2) Samples #5–6: VB1–Black tar vapor barrier

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #5: VB1…Area 1

Sample Number 5

Sample Location Area 1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:40

Sample Location Photo

Asbestos Samples - 2. Sample #6: VB1…Area 2

Sample Number 6

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:40

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 1 Material Description Black tar vapor barrier

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 4. (2) Samples #7–8: VB2–Tan paper vapor barrier

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #7: VB2…Area 1

Sample Number 7

Sample Location Area 1

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:41

Sample Location Photo

Asbestos Samples - 2. Sample #8: VB2…Area 2

Sample Number 8

Sample Location Area 2

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:41

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 2 Material Description Tan paper vapor barrier

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

No

Homogeneous Area

Total Approximate Quantity

Materials & Samples - 5. (2) Samples #9–10: PB-1–Black pitch box tar

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #9: PB-1…Lower level elevation change

Sample Number 9

Sample Location Lower level elevation change

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:43

Sample Location Photo

Asbestos Samples - 2. Sample #10: PB-1…Upper level side D

Sample Number 10

Sample Location Upper level side D

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 09:43

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym PB-1

Material Description Black pitch box tar

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 6. (2) Samples #11–12: CS-1–Stretchy tan roof top cap sealant

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #11: CS-1…Upper roof top cap

Sample Number 11

Sample Location Upper roof top cap

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:02

Sample Location Photo

Asbestos Samples - 2. Sample #12: CS-1…Upper roof top cap

Sample Number 12

Sample Location Upper roof top cap

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:02

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym CS-1

Material Description Stretchy tan roof top cap sealant

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 7. (2) Samples #13–14: BUR-2–Black tar built up roof membrane

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #13: BUR-2…Area 4

Sample Number 13

Sample Location Area 4

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:03

Sample Location Photo

Asbestos Samples - 2. Sample #14: BUR-2…Area 5

Sample Number 14

Sample Location Area 5

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:03

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym BUR-2

Material Description Black tar built up roof membrane

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 8. (2) Samples #15–16: VB3–Black tar vapor barrier

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #15: VB3…Area 4

Sample Number 15

Sample Location Area 4

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:04

Sample Location Photo

Asbestos Samples - 2. Sample #16: VB3…Area 5

Sample Number 16

Sample Location Area 5

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 10:04

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym VB ▸ 3 Material Description Black tar vapor barrier

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

Notes

Materials & Samples - 9. (2) Samples #17–18: AS1–Grey and black asphalt roof with black glue

Sample Information

Asbestos Samples (2 Items)

Asbestos Samples - 1. Sample #17: N/A…Lower roof elevation change (side B)

Sample Number 17

Sample Location Lower roof elevation change (side B)

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 12:14

Sample Location Photo

Asbestos Samples - 2. Sample #18: N/A…upper roof roof cap

Sample Number 18

Sample Location upper roof roof cap

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date June 2, 2021

Time 12:14

Sample Location Photo

Material Information

Sampled or Assumed? Sampled

Material Acronym AS ▸ 1 Material Description Grey and black asphalt roof with black glue

Material Color Black

Representative Photos

Analyze by layer? No

Is material non-friable organically bound (NOB)?

Yes

Homogeneous Area

Total Approximate Quantity

LAB & SAMPLE SUBMISSION INFO

Signature

Signed 6/2/2021, 3:49:21 PM UTC

Asbestos Bulk Samples

Remarks to be added to the CoC Please send results to GKaczynski and TMacGillivray

Asbestos samples submitted to TRC lab?

Yes

Date Submitted to Lab June 2, 2021

Asbestos bulk sample CoC data electronically sent to lab yet?

No

Asbestos bulk sample results reviewed?

No

Override sample number validation? No

REPORTING

Select one or more documents below to be generated. Once completed in the cloud, they will be sent to the listed email address.

NOTE: Asbestos bulk sample CoC data must now be sent electronically to the lab by selecting "Asbestos chain-of-custody - Send to Lab" from the list below.

What documents should be generated?

Asbestos chain-of-custody

Where should the document(s) be sent?

gkaczynski@trcsolutions.com

Generate Documents

2021-58 FIRE STA 1 ROOF REPLACEMENT ADD 1
20.242 Fire Station #1 Roof Replacement - Addendum #1
FS#1RRADD#1
DATE: June 10, 2021
End of Addendum ‘1’
20.242 #1 Sign-In Sheet 06.03.21
TRC Asbestos Inspection Report for Fire Station #1 & 3 Roofs - June 2021

File details come from the government source that posted it. Updated .