This environmental information document is a template to collect project details for determining the necessary level of environmental review for federal grant applications. It requests information on project location and maps, description, size, ground disturbance, zoning, buildings, environmental impacts, and more. Key details include inquiring whether the project is near threatened species or critical habitats, involves tree cutting or trimming, impacts wetlands or floodplains, and whether it could disproportionately affect minority or low-income populations. It collects signatures and dates to verify accuracy of the information provided.
MPPEP Phase 2 Environmental Information Sheet
View the file
Other files for this federal grant opportunity
| File | Type | Posted |
|---|---|---|
| ad-2106.pdf | ||
| MPPEP2FeasibilityStudyGuide_508.pdf | ||
| MPPEP2FAQs_508.pdf | ||
| MPPEP2FactSheet_508.pdf | ||
| MPPEP_Phase2_Application_Template_08.23.23_Form.docx | DOCX document | |
| MPPEP_Phase2_Application_Template_09.06.23.docx | DOCX document | |
| FY 23 RBCS MPPEP2 Notice 8-21-23 Final PDF.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 2023
ENVIRONMENTAL INFORMATION
This document is used to collect information to determine what level of environmental review is necessary. The Agency may request additional information if needed. All answers need to be supported by appropriate documentation when applicable. Potentially helpful links are provided in blue, though not exhaustive or a comprehensive list of resources. A complete NEPA review is required prior to award. Construction may jeopardize completion of NEPA - do not begin construction until the Agency has confirmed a complete NEPA review.
APPLICANT NAME
1.
ADDRESS
Physical location of the project (includes specifics such as longitude and latitude and legal description)
2.
PHOTOS AND MAP
Please provide recent project site photos as well as an aerial map showing the building/lot/exact location of the project. Please indicate in detail on map any potential trenching or other ground disturbance, electrical connections, or other relevant information.
3. Photos and maps are attached. ☐
DETAILED PROJECT DESCRIPTION
Describe how proposed funds will be used. If project involves construction, whether interior or exterior or renovations, please describe in detail. For renewable energy systems such as solar panels be specific on type of system (fixed tilt, tracking, mounting & structure, i.e. ballasted, 3" pile driven, concrete, screws, etc.).
4.
SIZE OF THE PROJECT AND SITE
Please indicate the size (acres) of your project and how the project will impact the site including roads, right of ways, utilities, or other impacts. Example: Renewable energy solar project should include sq. ft, linear ft, number of installed units/panels/buildings, and details regarding any trenching or ground disturbance to be completed (indicate project square feet of existing and new ground disturbance).
5.
GROUND DISTURBANCE
6. Will the project involve construction without any ground disturbance (i.e. roof mounted solar)?
☐Yes ☐No
6a. If no ground disturbance, please provide land use, land ownership, & description (i.e. industrial, residential, wooded, grasslands, etc.).
6b. If ground disturbance is expected, provide descriptive info, including if the project site was previously disturbed (i.e., previous structure, excavation, cultivation).
ZONING
7. What is the zoning for the project location?
BUILDING AND LOCATION INFORMATION
8. What is the age/year built, of the building where the project will be located in/on?
(If no building involved, please type N/A.)
9. Will the project be located within the viewshed of a building that is a least 50+ years old?
☐Yes ☐No
10. Is the building or project site listed on the State/National Register of Historic Places? ☐Yes ☐No
10a. Findings are attached. ☐
11. If building is over 50 years old, located within the viewshed of a building over 50 years old, or on the State/National Register of Historic Places, has approval or concurrence been obtained from State Historic Preservation Office? ☐Yes ☐No
11a. Letters to and responses from the State Historic Preservation Office are attached. ☐
12. Have any Tribes or Tribal Historic Preservation Officers been contacted? (Some Tribes require government to government contact therefore consultation with the local RD State Office is recommended.) ☐Yes ☐No
Letters to and responses from the Tribes or Tribal Historic Preservation Officers, if applicable, are attached. ☐
12a. Summarize State/National Register of Historic Places, Tribes, and Tribal Historic Preservation Officers responses below.
13. Will the project be located within a Historic District? ☐Yes ☐No
Correspondence with Historic District is attached. ☐
If project located in Historic District, please summarize the review/comments/approval from the local town historic district below.
https://npgallery.nps.gov/nrhp https://egis.hud.gov/tdat/ https://grantsdev.cr.nps.gov/THPO_Review/index.cfm
ENVIRONMENTAL IMPACT
14. Consult the Information for Planning and Consultation (IPaC) website and pull a report for your project area.
IPaC report is attached. ☐
Are there threatened or endangered species or critical habitats within the project area?
☐ Yes ☐ No
If yes, describe the impact your project will have on these resources below.
15. Will the project involve cutting trees or trimming trees? ☐Yes ☐No
If yes, explain in detail below: how many, how large, tree type, etc.
15a. If yes to 15, can the applicant/project refrain from cutting, clearing, or trimming trees during habitat critical time frames? (Ex. 6/1 - 7/31 for long-eared bat.) ☐Yes ☐No
Discuss relevant construction timeline below.
https://ecos.fws.gov/ipac/
16. Is the project located in or could the project affect a wetland? (Use the links below to assist in your determination.) ☐Yes ☐No
• National Wetlands Inventory: https://www.fws.gov/wetlands/data/Mapper.html
• Web Soil Survey: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm
Wetlands map is attached. ☐
16a. If yes to 16, has an Army Corps or other permit been issued for the project site? ☐Yes ☐No
Applicable permits are attached. ☐
17. Is the project located in or could the project affect a floodplain (100- or 500-year floodplains)? (Use the links below to assist in your determination.) ☐Yes ☐No
• Federal Emergency Management Agency: http://msc.fema.gov/portal
• Web Soil Survey: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm
FEMA map is attached. ☐
18. Is the project site on or in the vicinity of classified land, such as State/Federal Parks, Monuments, Natural Landmarks, Wilderness Areas, Wild and Scenic Rivers, State Lands, National Forest, etc.?
☐Yes ☐No
Land map is attached. ☐
18a. If yes to 18, explain and indicate if the land managing agency has been contacted.
19. Does project affect Coastal Resources (including Great Lake area) including impact to a coral reef (Coastal Barrier Resources System or Coastal Zone Management Areas)? (If your project is not located on the coast, you will likely check no.) ☐Yes ☐No
If on coast, coastal map is attached. ☐
20. Is the proposal located on prime, important, unique or of local Importance Farmland? (Use the links below to assist in your determination.) ☐Yes ☐No
• WSS: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm
• FPPA guidance available from NRCS:
https://www.nrcs.usda.gov/wps/portal/nrcs/main/national/landuse/fppa/
Web Soil Survey is attached. ☐ https://www.fws.gov/wetlands/data/Mapper.html https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm http://msc.fema.gov/portal https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm https://fwsprimary.wim.usgs.gov/cbrs-mapper-v2/ https://coast.noaa.gov/czm/mystate/ https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm https://www.nrcs.usda.gov/wps/portal/nrcs/main/national/landuse/fppa/ https://www.protectedlands.net/map/
20a. If yes to 20, has National Resources Conservation Service (NRCS) completed a Land Evaluation and Site Assessment (LESA)? ☐Yes ☐No
20b. If yes to 20, is the project expected to benefit by saving or offsetting energy for a farm or agricultural producer? ☐Yes ☐No
NRCS letter is attached. ☐
21. Is the project expected to house, store, reclaim, recycle or involve the handling of hazardous materials, e.g. waste storage, disposal recovery, incineration or waste treatment actions?
☐Yes ☐No
If yes, explain.
22. Has a Phase 1 Environmental Site Assessment (ESA) been prepared for this site? (A Phase I is not the same as a NEPA review. The Phase I is generally needed for all projects over $100,000 when loan funds are requested, and the agency will take a security interest in real estate.) ☐Yes ☐No
22a. If prepared, Phase 1 ESA is attached. ☐
23. Does the property contain any areas where regulated hazardous substances or petroleum products appear to have been released? ☐Yes ☐No
If yes, explain.
24. Does the property contain an underground storage tank (UST)? ☐Yes ☐No
If yes, explain and include: type, size, age, date of last state certification.
25. Does the property contain any aboveground storage tanks (AST)? ☐Yes ☐No
If yes, are the ASTs in secondary containment? ☐Yes ☐No
26. Will or could the project have any emissions or cause uncontrolled or unpermitted releases of hazardous substances, pollutants, contaminants, petroleum, or natural gas products? Yes No
If yes, explain.
27. For projects involving new construction, will the project affect any Water Resources (Sole Source Aquifers, Well-head protection areas, Watershed Protection Areas, etc.)? ☐Yes ☐No
If yes, explain.
28. Is there any controversy that you are aware of or about the project for environmental reason?
☐Yes ☐No
If yes, explain.
29. Does the proposal have any concerns or disproportionately high and or adverse human health or environmental effects on minority populations or low-income populations? (Use the links below to assist in your determination.) ☐Yes ☐No
• Environmental Justice Screening and Mapping Tool: https://www.epa.gov/ejscreen
• USDA Policy: https://www.rd.usda.gov/files/1970e.pdf
Environmental Justice map is attached. ☐ https://epa.maps.arcgis.com/apps/webappviewer/index.html?id=9ebb047ba3ec41ada1877155fe31356b https://epa.maps.arcgis.com/apps/webappviewer/index.html?id=9ebb047ba3ec41ada1877155fe31356b https://www.epa.gov/ejscreen https://www.rd.usda.gov/files/1970e.pdf
If yes to 29, explain.
30. Is the subject business facility connected to a municipal wastewater system? ☐Yes ☐No
If no, describe the existing on-site system, including capacity.
31. Is the subject business facility connected to a municipal water system? ☐Yes ☐No
If no, describe the existing on-site system, including capacity.
32. Is the project located in a county that has been designated by EPA as a Non-Attainment or Maintenance for any of the National Ambient Air Quality Standards? (Use the links below to assist in your determination.) ☐Yes ☐No
• NEPAssist: https://www.epa.gov/nepa/nepassist
• Environmental Protection Agency Greenbook: https://www.epa.gov/green-book
SIGNATURE, DATE, & TITLE OF PREPARER
Signature Date
Title of Preparer https://www.epa.gov/nepa/nepassist https://www.epa.gov/green-book
| Applicant Name |
| Address |
| Photos and Map |
| Detailed Project Description |
| Size of the Project and Site |
| Ground Disturbance |
| Zoning |
| Building and Location information |
| Environmental Impact |
| Signature, Date, & Title of Preparer |
| APPLICANT NAME: |
| ADDRESS: |
| DETAILED PROJECT DESCRIPTION: |
| SIZE OF THE PROJECT AND SITE: |
| ZONING: |
| Photos and maps attached 3: Off |
| No Ground Disturbance: |
| Age of Building: |
| Check Box9: Off |
| Check Box10: Off |
| Check Box6: Off |
| Check Box11: Off |
| Check Box10a: Off |
| Check Box12: Off |
| Check Box11a: Off |
| Yes Ground Disturbance: |
| Check Box13: Off |
| Check Box12x: Off |
| Summarize 12a: |
| Summarize 13: |
| Check Box13x: Off |
| Check Box14: Off |
| Check Box14x: Off |
| Check Box15: Off |
| impact on resources 14: |
| Check Box15a: Off |
| Tree cutting or trimming details 15: |
| Contruction timeline 15a: |
| Check Box16: Off |
| Check Box16x: Off |
| Check Box16ax: Off |
| Check Box17x: Off |
| Check Box16a: Off |
| Check Box17: Off |
| Check Box18: Off |
| Text18a: |
| Check Box18x: Off |
| Check Box19x: Off |
| Check Box20x: Off |
| Check Box19: Off |
| Check Box 20: Off |
| Check Box20a: Off |
| Check Box20b: Off |
| Check Box 21: Off |
| Check Box 22: Off |
| Check Box 23: Off |
| Check Box20bx: Off |
| Check Box 22a: Off |
| Check Box 24: Off |
| Check Box 25: Off |
| Check Box 25x: Off |
| Text 24: |
| Check Box 26: Off |
| Check Box 27: Off |
| Check Box 28: Off |
| Check Box 29: Off |
| Text27: |
| Text26: |
| Text28: |
| Check Box 29x: Off |
| Check Box 30: Off |
| Check Box 31: Off |
| Check Box 32: Off |
| Text29: |
| Text30: |
| Text31: |
| Date26_af_date: |
| Text32: |
| Text 23: |
| Text 21: |
| Clear: |
File details come from the government source that posted it. Updated .