Rancho Transmission Main Amendment MC5264 WD0726 Addendum No1.pdf
PDF 14 MB Posted
- Solicitation number
- UD-26-352
- Issued by
- Los Angeles County, Los Angeles City, California
About this file
This is Addendum No. 1 to the contract documents for the Rancho Los Alamitos Transmission Main Abandonment Project (MC-5264) issued by the Long Beach Public Utilities Department on August 13, 2026. The addendum provides clarifications, additions, and deletions to the construction plans and specifications for the abandonment of approximately 2,050 linear feet of existing 24-inch steel cylinder concrete transmission main in Long Beach, California. Key modifications include the addition of traffic control plans as new sheets 8 and 9, revisions to the table of contents and general notes, updates to specification sections covering cement mortar, metal fabrications, asbestos cement pipe (ACP) handling procedures, traffic control and temporary restriping, selective site demolition, paving removal and resurfacing, utility pipeline removal or abandonment, cast-in-place concrete, trenching and backfilling, and disinfection of water utility pipelines. The addendum extends several submittal requirements, including detailed specifications for line-stop equipment showing sleeve or wrapper plate, completion flange, line-stop assembly, dimensions, materials, pressure ratings, welding details, concrete support, thrust restraint, and connections to existing pipeline, as well as procedures for field verification of existing steel-cylinder thickness and condition, welding to existing pipe, and restoration of interior lining and exterior coating. Related work sections added include water service bypassing, governmental safety requirements, and connecting to existing pressure pipelines.
The addendum addresses hazardous materials handling procedures specific to asbestos-cement pipe connections in accordance with Cal/OSHA, United States Environmental Protection Agency (US EPA), and governing health agency requirements, referencing applicable California Code of Regulations and South Coast Air Quality Management District Rule 1403. Revised submittal procedures now require a Pipeline Abandonment Work Plan with professional engineer stamp, along with detailed calculations demonstrating that the line-stop assembly, completion flange, temporary support, concrete support, and thrust restraint are adequate for the pipeline working pressure and 188 PSI hydrostatic test pressure. The coordination section has been amended to extend the advance shutdown notification period from 45 days to 48 days. Thrust block design requirements specify an allowable soil-bearing capacity of 2,000 psf in accordance with LBUD Standard Drawing WDS-107, with provisions for revised design calculations if field conditions indicate different bearing capacity. The specifications for cast-in-place concrete, trenching and backfilling, and disinfection of water utility pipelines have been replaced in their entirety to reflect updated requirements and methodologies for the abandonment project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1800 E. Wardlow Road Long Beach, CA 90807
562.570.2300 │LBUtilities.org
AD1-1
August 13, 2026
ADDENDUM NO. 1
TO THE CONTRACT DOCUMENTS
Long Beach Public Utilities Department Long Beach, California Specifications No. WD-07-26 Drawing No. MC-5264
RANCHO LOS ALAMITOS TRANSMISSION MAIN ABANDONMENT PROJECT
TO ALL PLAN HOLDERS
The following addendum is hereby made a part of the Contract Documents of the subject project as fully and completely as if the same were set forth therein. This Addendum No.
1 consists of pages AD1-1 to AD1-109.
CONTRACT DOCUMENTS
The following clarifications, additions, and deletions are made to the Construction Plans and Specifications as stated below:
CONSTRUCTION PLANS: See AD1-5 through AD1-13
1. ADD Traffic Control Plans to the end of approved drawing MC-5264 as new sheets 8 and 9 OF 9.
2. REVISE total sheet count across all sheets.
3. REVISE Table of Contents on Sheet 2
4. REVISE General Note 15 on Sheet 2 to reference Section 33 11 11 Part “1.2-A” instead of “2.1-A”
5. REVISE General Note 33 on Sheet 2 to reference Long Beach Standard Plan "340-
386” instead of “540-386”
SPECIFICATIONS:
1. Table of Contents (AD1:14 – 16)
a. ADD the following cross references to the specification included as part of the package:
03 32 10 Cement Mortar 05 50 00 Metal Fabrications 31 05 23 Cement and Concrete Conforming to Greenbook 32 12 16 Asphalt Concrete 33 11 13 Carbon Steel Mill Pipe
2 | P a g e
AD1-2
2. Section 01 10 01 Summary of Work and Sequence of Construction (AD1:17 – 21)
a. REPLACE Sections 1.1.B.9-13 with the amended Sections 1.1.B.9-17.
3. Section 01 10 03 Coordination (AD1:22 – 30)
a. In 1.3.D.2.a REPLACE 45-day with 48-day
4. Section 01 33 00 Submittal Procedures (AD1:31 – 42)
a. ADD the following row to the table of working drawings required per Section 1.12.C
SECTION TITLE SUBJECT PROFESSIONAL
ENGINEER
STAMP
01 10 01 Summary of Work and Sequence of
Construction
Pipeline Abandonment Work Plan Not Required
b. ADD the following to Section 1.13.E:
12. For line-stop equipment, show the sleeve or wrapper plate, completion flange, line-stop assembly, dimensions, materials, pressure ratings, welding details, concrete support, thrust restraint, and connections to the existing pipeline.
13. Submit procedures for field verification of the existing steel-cylinder thickness and condition, welding to the existing pipe, and restoration of the interior lining and exterior coating.
14. Submit calculations demonstrating that the line-stop assembly, completion flange, temporary support, concrete support, and thrust restraint are adequate for the pipeline working pressure and 188 psi hydrostatic test pressure shown on the Plans.
5. Section 01 35 44 Environmental Procedures for Hazardous Materials (AD1:43 – 47)
a. ADD the following as 1.1.I:
Work includes connections to existing asbestos-cement pipe (ACP). Perform handling, cutting, removal, packaging, transportation, and disposal of ACP in accordance with applicable Cal/OSHA, United States Environmental Protection Agency (US EPA), and governing health agency requirements. Refer to Section 33 01 19 for connection procedures and Section 02 41 15 for removal and abandonment procedures.
b. ADD the following related work sections to Section 1.2:
K. Section 33 01 10: Water Service Bypassing L. Section 01 35 26: Governmental Safety Requirements M. Section 33 01 19: Connecting to Existing Pressure Pipelines
c. ADD the following reference to Section 1.3:
7. 29 CFR 1926.1101: Asbestos
8. California Code of Regulations, Title 8, Section 1529: Asbestos
9. South Coast Air Quality Management District Rule 1403: Asbestos Emissions from Demolition/Renovation Activities
3 | P a g e
AD1-3
6. Section 01 55 26 Traffic Control and Temporary Restriping (AD1:48 – 56)
a. REPLACE Section in its entirety per amended version.
7. Section 02 41 13 Selective Site Demolition (AD1:57 – 64)
a. REPLACE Section 3.1.A as follows:
Shut off or disconnect utilities affecting demolition work. Schedule shutdowns with Owner, and notify Owner within 14 Calendar Days in advance of shutdowns required to perform Work unless earlier as required by the City.
8. Section 02 41 14 Paving Removal and Resurfacing (AD1:65 – 74)
9. Section 02 41 15 Utility Pipeline Removal or Abandonment (AD1:75 – 80)
10. Section 03 30 00 Cast-in-Place Concrete Conforming to Greenbook Specifications
(AD1: 81 – 96)
a. ADD the following references to Section 1.2 Related Work:
G. Section 31 23 24: Flowable Fill Controlled Low-Strength Material (CLSM) H. Section 31 23 33: Trenching and Backfilling I. Public Works Construction (Greenbook) §201-7: Grout
b. REVISE the description of the submittal requirements for Engineering Calculations for Thrust Block Design in Section 1.6.A per the following:
Thrust blocks shown on the plans are designed using an allowable soil-bearing capacity of 2,000 psf in accordance with LBUD Standard Drawing
WDS-107. If field conditions indicate an allowable soil-bearing capacity other than 2,000 psf, a revised design calculations shall be submitted to LBUD for review and approval before installation.
c. REVISE Section 3.2 Installation in its entirety per amended version.
11. Section 31 23 33 Trenching and Backfilling (AD1: 97 – 103)
12. Section 33 13 00 Disinfecting of Water Utility Pipelines (AD1: 104 – 109)
41Page
A signed copy of the Addenda Acknowledgement form provided in Part 1 or the Bidding
Requirements and a copy of this addendum must accompany the Bid Submittal.
Questions regarding the project shall be directed to Leela Stevens at (562) 619-8071.
Sincerely, Robert J. Verceles, P.E.
Director of Water/Sewer Engineering cc: Leela Stevens, Civil Engineer
Carolina Avendano, Capital Project Coordinator IV
AD1-4
© 2026 Microsoft Corporation © 2026 TomTom © 2026 Zenrin
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
LONG BEACH PUBLIC UTILITIES DEPARTMENT
LONG BEACH, CALIFORNIA
PLANS FOR THE CONSTRUCTION OF
JULY 2026
GENERAL MANAGER
WD-07-26
THOMAS BEKELE - SENIOR DIRECTOR ENGINEERING DATE
LONG BEACH PUBLIC UTILITIES DEPARTMENT
APPROVED BY:
ENGINEER NAME R.C.E. # DATE
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
E BIXBY HILL RD TO E 7TH ST
SUBMITTED BY:
TITLE SHEET
NOT TO SCALE
VICINITY MAP
NOT TO SCALE
LOCATION MAP
B. ANATOLE FALAGÁN
STELLA SHAOSTELLA SHAO 93142 07-29-2029
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195
7-28-2026
7-31-2026
7-31-2026
8/13/26AD-1 AMENDMENT NO. 1 - NEW SHEETS
AD1 - 5 of 109
CONSTRUCTION NOTES
ITEM DESCRIPTION
EXISTING 24" SCC WATER LINE TO BE ABANDONED IN PLACE. FILL ABANDONED PORTION OF 24" LINE WITH CLSM.
INSTALL 24" LINE STOP FOR TEMPORARY ISOLATION OF THE PIPELINE. TRENCH RESTORATION PER LBUD STD. WDS-406.
TRENCH RESTORATION PER LBUD STD. WDS-406.
WELD 24" STEEL BLIND FLANGE WITH 4" OPENING TO EXISTING 24" SCC PIPE (SEE DETAIL 4, SHEET 7). SEE NOTE 8.
WELD ON 24" STEEL BLIND FLANGE. SEE NOTE 8.
DI BLIND FLANGE WITH 4" THREADED OUTLET BEND TO CONNECT TO BLOW-OFF PER LBUD STD. WDS-112.
BLOW-OFF ASSEMBLY AT DEAD END MAIN PER LBUD STD. WDS-112 OR MATERIAL APPROVED BY LBUD. CONTRACTOR
TO REFER TO THE STD DRAWING FOR BLOW-OFF ASSEMBLY.
PROVIDE INSULATING FLANGE KIT.
NOT USED.
NOT USED.
4" BLOW-OFF ASSEMBLY WITH CAST IRON LID COVER PER LBUD STD. WDS-112.
PROVIDE THRUST BLOCK OF SIZE SPECIFIED IN PLANS.
WELD 12" STEEL BLIND FLANGE. SEE NOTE 8.
PLUG PIPE WITH CEMENT MORTAR. 12" MINIMUM DEPTH.
PROTECT IN PLACE.
ASSEMBLY OF 4" DI OR LBUD APPROVED MATERIAL NIPPLE (1'-3" LENGTHS), 90 BEND AND 4" NIPPLE (LENGTH AS
NEEDED TO BE ABOVE THE THRUST BLOCK) PER LBUD STD. WDS-122.
CONTRACTOR TO VERIFY THE ANCHOR/THRUST BLOCK ON THE EX. VALVE. IF THE VALVE DOES NOT HAVE AN ANCHOR/ THRUST BLOCK. THE CONTRACTOR SHALL INSTALL ANCHOR AND THRUST BLOCK PER LBUD WDS-107.
DEMOLITION NOTES
ITEM DESCRIPTION
VALVE ABANDONMENT PER LBUD STD. WDS-127.
ABANDON EXISTING UNLOCATED BLOW-OFF VALVE IN PLACE UTILIZING INTERNAL CCTV-GUIDED INFLATABLE ISOLATION PLUG AND SEQUENCED CLSM MANUFACTURED BY CHERNE, PETERSON, PLUGCO, OR APPROVED EQUAL.
EXISTING VALVE FOR PIPELINE ISOLATION. CONTRACTOR TO COORDINATE WORK EFFORTS WITH LBUD.
ABANDON EXISTING MANHOLE, SEE NOTE 2.
ABANDON EXISTING VALVE BY REMOVING VALVE AND VALVE CAN. BACKFILL AND REPAVE PER LBUD STD. WDS-406.
BLOW-OFF TO BE ABANDONED AND REMOVED. REMOVE CAN AND BLOW-OFF APPURTENANCES. BACKFILL AND REPAVE
PER LBUD STD. DWG. WDS-406.
BLOW-OFF TO BE ABANDONED AND REMOVED. REMOVE CAN AND BLOW-OFF APPURTENANCES.REMOVE AND REPLACE
CONCRETE SIDEWALK PANEL PER LBUD STD.
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 24" SCC WATER LINE.
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 12" STL WATER LINE.
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 4" PIPELINE.
CATHODIC PROTECTION TO BE ABANDONED AND REMOVED. REMOVE AND REPLACE CONCRETE SIDEWALK PANEL PER
LBUD STD.
EXISTING 12" WATER LINE TO BE ABANDONED IN PLACE.
REMOVE EXISTING FLEXIBLE COUPLING.
UNBOLT AND REMOVE TIE RODS.
EXISTING ACCESS MANWAY. CONTRACTOR TO FIELD VERIFY. IF ACCESS MANWAY IS FOUND CONTRACTOR SHALL ABANDON ACCESS MANWAY BY REMOVING LID AND RISER, TOP 2-FEET OF CONC MANHOLE, BACKFILL AND REPAVE OR
MATCH THE EXISTING CONDITION.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
GENERAL NOTES, PUBLIC AGENCIES &
UTILITIES, UTILITY LEGEND AND SHEET INDEX
SHEET INDEX
SHT# SHEET TITLE
1 TITLE SHEET
2 GENERAL NOTES, PUBLIC AGENCIES & UTILITIES, UTILITY LEGEND AND SHEET INDEX
3 VALVE AND PIPELINE ISOLATION PLAN
4 SITE PLAN
5 DETAIL 1
6 DETAIL 2
7 DETAIL 3
EXISTING GAS
EXISTING SANITARY SEWER
EXISTING WATER
EXISTING STORM DRAIN
EXISTING UNDERGROUND ELECTRIC
EXISTING FORCE MAIN
EXISTING WATER VALVE
EXISTING WATER METER
EXISTING FIRE HYDRANT
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM DRAIN MANHOLE
WHERE REINFORCEMENT IS REQUIRED TO EXTEND THROUGH THE NEW JOINT, CONCRETE SHALL BE REMOVED IN THE
FOLLOWING SEQUENCE.
1. A SAWCUT SHALL BE MADE ONE AND ONE-HALF (1/2) INCHES DEEP AT THE REMOVAL LIMITS. CARE SHALL BE EXERCISED IN SAWING AT THE REMOVAL LIMITS SO AS NOT TO CUT THE REINFORCING STEEL IN THE REMAINING SLAB. THE EXISTING REINFORCING STEEL SHALL BE RETAINED AND EXTENDED INTO THE NEW CONSTRUCTION AS INDICATED ON THE PLANS.
2. USING HANDHELD EQUIPMENT, THE CONCRETE SHALL BE CAREFULLY REMOVED FOR THE FULL DEPTH OF THE WALL OR SLAB AND FOR A MINIMUM DISTANCE FROM THE SAWCUT EQUAL TO THE LONGEST EXTENSION OF THE EXISTING BARS TO BE EXTENDED INTO THE NEW CONSTRUCTION. THIS EXTENSION SHALL BE 30 BAR DIAMETERS, UNLESS OTHERWISE SHOWN.
3. EXISTING REINFORCEMENT SHALL BE CUT TO THE REQUIRED BAR EXTENSION.
4. THE REMAINING CONCRETE MAY BE REMOVED BY ANY SUITABLE METHOD UPON APPROVAL OF THE ENGINEER, WHO SHALL BE THE SOLE JUDGE OF THE USE OF ANY CONCRETE REMOVAL EQUIPMENT. EXPLOSIVES, WRECKING BALL, OR OTHER SIMILAR DEVICES, WHICH ARE LIKELY TO DAMAGE THE CONCRETE TO BE LEFT IN PLACE, SHALL NOT BE USED.
CONCRETE REMOVAL NOTES DISCLAIMER
THESE DOCUMENTS HAVE BEEN PREPARED FOR A SPECIFIC PROJECT AND SHALL NEITHER BE
ALTERED NOR REUSED FOR ANY OTHER PURPOSE. ALSO, THESE DOCUMENTS DO NOT REPRESENT
AS-BUILT CONDITIONS. IF THESE DOCUMENTS ARE ALTERED INTENTIONALLY OR UNINTENTIONALLY, OR REUSED WITHOUT THE DESIGN ENGINEER'S WRITTEN APPROVAL, IT WILL BE AT THE SOLE RISK
AND RESPONSIBILITY OF THE USER. THE ACT OF ALTERING OR REUSING IS CONSTRUED AS
INDEMNIFYING AND HOLDING THE DESIGN ENGINEERING FIRM AND IT'S EMPLOYEES HARMLESS
FROM ALL CLAIMS, DAMAGES, AND EXPENSES, INCLUDING ATTORNEYS FEES, ARISING OUT OF
SUCH ACT.
1. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION OF THE PROJECT, INCLUDING
SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD HARMLESS THE CITY, ITS EMPLOYEES, AGENTS AND ITS
CONSULTANTS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK OH THIS PROJECT.
2. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD
SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, AND IN ACCORDANCE WITH THE CITY OF LONG
BEACH AMENDMENTS TO STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION (LATEST
EDITION), THE CITY OF LONG BEACH PUBLIC UTILITIES DEPARTMENT (LBUD) WATER AND SEWER STANDARDS, ALL APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS, AND IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, ALL TO THE SATISFACTION OF THE LONG
BEACH PUBLIC UTILITIES DEPARTMENT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN PLANS AND/OR FIELD CONDITIONS IMMEDIATELY TO DESIGN ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION, AND
SHALL BE RESPONSIBLE FOR DISCREPANCIES NOT SO REPORTED AND RESOLVED.
4. THE CONTRACTOR SHALL PERFORM A UTILITY SEARCH FOR THE PROJECT AREAS. THE
CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR ANY DAMAGE TO THESE LINES OR STRUCTURES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY EACH RESPECTIVE UTILITY AND UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA, 811 TO DETERMINE THE EXACT FIELD LOCATION OF UTILITIES WHICH MAY CONFLICT WITH THE WORK.
5. THE CONSTRUCTION DRAWINGS SHOW THE GENERAL LOCATION AND DEPTH OF UNDERGROUND
UTILITIES BASED ON THE BEST INFORMATION AVAILABLE TO LBUD. LBUD DOES NOT GUARANTEE THE
LOCATION OR DEPTH OF UNDERGROUND UTILITIES AND IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO FIND THE EXACT LOCATION AND DEPTH OF UNDERGROUND UTILITIES IN AREAS
REQUIRING EXCAVATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES, PAVEMENT, CURBS, TRAFFIC STRIPING, MARKER AND MARKINGS, TRAFFIC SIGNAL DETECTOR LOOPS, STREET LIGHT CONDUITS, STRUCTURES, TREES, AND IRRIGATION SYSTEM AS A RESULT OF HIS OPERATION AND WILL BE REQUIRED TO REPAIR OR REPLACE SAME TO THE SATISFACTION OF AND AS DIRECTED BY, LONG BEACH PUBLIC UTILITIES DEPARTMENT, THE ENGINEER, UTILITY COMPANY OR PROPERTY OWNER.
7. THE CONTRACTOR SHALL HAVE COPIES OF THE PLANS AND SPECIFICATIONS FOR THE PROJECT ON THE PROJECT SITE AT ALL TIMES, AND THEY SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS
AND SPECIFICATIONS.
8. SANITARY SEWER SHALL BE MAINTAINED ON THE SITE.
9. THE CONTRACTOR SHALL COOPERATE WITH CONTRACTORS PERFORMING OTHER CONSTRUCTION
WORK IN AREAS ADJACENT TO THE PROJECT SITE.
10. THE CONTRACTOR SHALL MAINTAIN DUST CONTROL AT ALL TIMES. DUST SHALL BE CONTROLLED
PER SPECIFICATION 01 50 00.
11. THE WALLS AND FACE OF ALL EXCAVATION FIVE (5) FEET OR GREATER IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING TO THE GROUND, OR OTHER EQUIVALENT MEANS. TRENCHES OR EXCAVATION LESS THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED WHEN EXAMINATION BY A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA HAS INDICATED THAT HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. THE CONTRACTOR SHALL OBTAIN A PERMIT TO
PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED FROM CAL-OSHA.
12. ALL PIPE SHALL BE FIELD HYDROSTATIC TESTED TO 188 PSI IN ACCORDANCE WITH THE
SPECIFICATIONS.
13. NO WATER SERVICES SHALL BE CLOSER THAN TWO (2) FEET TO A COUPLING, JOINT OR FITTING.
14. MINIMUM HORIZONTAL SEPARATION BETWEEN WATER SERVICES SHALL BE TWO (2) FEET UNLESS
OTHERWISE NOTED ON THE PLANS.
15. DUCTILE IRON PIPE AND FITTINGS SHALL BE CLASS 52 WITH INTEGRALLY CAST RESTRAINED JOINTS AND ENCASED WITH TWO LAYERS OF POLYETHYLENE WRAP UNLESS OTHERWISE NOTED. SEE SPECIFICATION SECTION 33 11 11 PART 2.1-A FOR JOINT RESTRAINT REQUIREMENTS. DUCTILE IRON PIPE SHALL HAVE DETECTABLE METALLIC LOCATING TAPE AND IDENTIFICATION TAPE PER SPECIFICATION
SECTION 33 05 26.
16. PROPOSED WATER MAINS SHALL HAVE A MINIMUM COVER OF FORTY-TWO (42) INCHES UNLESS
SHOWN ON THE PLANS.
17. ALL BURIED DUCTILE IRON FITTINGS, VALVES, COUPLINGS AND APPURTENANCES SHALL BE COATED WITH NO-OX-ID COMPOUND, WRAPPED WITH NO-OX-ID TAPE, AND DOUBLE ENCASED WITH
POLYETHYLENE.
18. BURIED JOINING HARDWARE USED FOR FLANGED CONNECTIONS AND FLEX/TRANSITION
COUPLINGS SHALL BE TYPE 316 STAINLESS STEEL.
19. RESTRAINED JOINT FITTINGS AND THRUST BLOCKS SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, CONNECTIONS, VALVES, AND FITTING LOCATIONS. INSTALL THRUST BLOCKS AT NEW PIPE BENDS CLOSEST TO CONNECTION TO EXISTING PUSH-ON JOINTS. (THRUST BLOCKS USE 2,000
PSF SOIL BEARING VALUE PER WDS-107).
20. BURIED VALVES SHALL BE INSTALLED PER DETAIL WDS-119.
21. HYDROSTATIC AND BAC-T TEST SHALL BE COMPLETE AND ACCEPTABLE PRIOR TO CONSTRUCTING
SYSTEM CONNECTIONS.
22. STREET PAVING SHALL BE RESTORED PER DETAIL WDS-406.
23. REPLACE OR RECONNECT WATER SERVICES AS SHOWN ON THE PLANS.
24. THIS PROJECT INCLUDES CONNECTIONS TO EXISTING ASBESTOS CEMENT PIPE (ACP). THE
CONTRACTOR IS ADVISED THAT ASBESTOS IS A KNOWN HUMAN CARCINOGEN WHEN INHALED AND
POSES SERIOUS HEALTH RISKS. THE CONTRACTOR SHALL PERFORM ALL HANDLING OF ACP IN STRICT CONFORMANCE WITH APPLICABLE CAL/OSHA, EPA AND GOVERNING HEALTH AGENCY REQUIREMENTS.
REFER TO SECTION 02 41 13 FOR PROCEDURES FOR HANDLING ASBESTOS AND OTHER HAZARDOUS
MATERIALS.
25. CONTRACTOR SHALL SALVAGE CAST IRON VALVE BOX SLEEVE AND LID AT ALL LOCATIONS WHERE EXISTING VALVES ARE TO BE TAKEN OUT OF SERVICE, REFER TO ABANDONED VALVE TABLE FOR LIST
OF VALVES. CONTRACTOR SHALL BACKFILL VALVE BOX HOLE WITH CONCRETE SLURRY MIX.
CONTRACTOR SHALL DELIVER TO LBUD MAINTENANCE YARD SALVAGED VALVE BOX PARTS.
26. A MINIMUM OF FIVE-HUNDRED (500) LINEAL FEET OF STEEL TRENCH PLATES SHALL BE USED ON THE PROJECT AT ANY GIVEN TIME. GRIND PAVEMENT UNDER EDGES OF STEEL TRENCH PLATES TO
RECESS TRENCH PLATES FLUSH WITH PAVEMENT.
27. STREET CENTERLINE AND SURVEY MONUMENTS THAT MUST BE REMOVED FOR CONSTRUCTION
SHALL BE REPLACED BY A CALIFORNIA LICENSED LAND SURVEYOR, OR PROTECTED IN PLACE.
28. BACKFILL TRENCH ZONE WITH NATIVE EARTH BACKFILL OR IMPORTED BACKFILL PER TRENCHING, BACKFILLING, AND COMPACTING SPECIFICATION. INSTALL SAND-CEMENT SLURRY BACKFILL WHERE NOTED ON PLANS. THE CONTRACTOR HAS THE OPTION OF BACKFILLING WITH SAND-CEMENT SLURRY IN
LIEU OF NATIVE OR IMPORTED MATERIALS AT HIS DISCRETION ELSEWHERE.
29. THE CONTRACTOR SHALL NOTIFY LONG BEACH PUBLIC UTILITIES DEPARTMENT AND LONG BEACH FIRE DEPARTMENT PRIOR TO ANY SHUT DOWN OF THE EXISTING WATER MAIN THAT WILL RESULT IN FIRE WATER SERVICE AND/OR WATER SERVICE BEING INTERRUPTED. IF REQUIRED BY THE CITY, THE CONTRACTOR SHALL PROVIDE A DEDICATED FIRE WATCH FOR EACH BUILDING THAT IS AFFECTED. THE
CONTRACTOR SHALL CALL 562-570-2563 OR 562-570-2560 WHEN ISSUING A FIRE WATCH.
30. THE CONTRACTOR SHALL COORDINATE ALL WORK ACTIVITIES WITH LONG BEACH PUBLIC
UTILITIES DEPARTMENT. SUCH COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO, SCHEDULING
OF WATER MAIN SHUTDOWNS, VALVE OPERATIONS, INSPECTIONS, TESTING, DISINFECTION,
CONNECTIONS TO EXISTING FACILITIES, AND ANY WORK INVOLVING ACTIVE OR ABANDONED LBUD SYSTEMS. ALL WORK ON EXISTING WATER FACILITIES, INCLUDING OPERATION OF VALVES AND SYSTEM
ISOLATION, SHALL BE PERFORMED BY OR UNDER THE DIRECTION OF LBUD UNLESS OTHERWISE
APPROVED. THE CONTRACTOR SHALL PROVIDE ADVANCE NOTICE TO LBUD AND OBTAIN APPROVAL
PRIOR TO PERFORMING ANY WORK THAT MAY IMPACT WATER SERVICE, SYSTEM OPERATION, OR
PUBLIC SAFETY.
31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE EXISTING WATER MAIN IN SERVICE DURING CONSTRUCTION AND SHALL SUBMIT A WATER SUPPLY BYPASS PLAN FOR APPROVAL BY LBUD PRIOR TO CONSTRUCTION. THE BYPASS PLAN SHALL INCLUDE TEMPORARY FIRE PROTECTION AND TRAFFIC CONTROL. TRAFFIC CONTROL SHALL BE MAINTAINED AT ALL TIES AND SHALL BE PROTECTED WITH ADEQUATE BARRICADES, LIGHTS, SIGNS AND WARNING DEVICES, PER THE CURRENT STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION MANUAL OF TRAFFIC CONTROLS AND PER
THE DIRECTION OF THE CITY OF LONG BEACH.
32. IF GROUNDWATER IS ENCOUNTERED, CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ACCESS PITS AND TRENCHES AND DISPOSING OF WATER AS REQUIRED BY THE CONTRACT DOCUMENTS AND APPLICABLE NPDES PERMITS AND FEDERAL, STATE, AND LOCAL GOVERNMENT REQUIREMENTS.
33. PROVIDE TRAFFIC CONTROL AS NEEDED PER THESE TRAFFIC CONTROL PLANS AND THE CITY OF LONG BEACH STANDARD PLAN 540-386. MAINTAIN PUBLIC ACCESS ON PUBLIC STREETS AND SAFETY
AROUND CONSTRUCTION SITE. IF ANY OF THE PROPOSED WORK REQUIRES TRAFFIC CONTROL
CONFIGURATIONS NOT SHOWN ON THESE PLANS, THE CONTRACTOR'S BID SHALL INCLUDE THIS WORK
AS PART OF THE TOTAL BID PRICE.
34. OPERATION OF ALL VALVES ON THE PUBLIC WATER LINES SHALL BE PERFORMED BY LONG BEACH PUBLIC UTILITIES DEPARTMENT UNLESS OTHERWISE SHOWN. COORDINATE ALL VALVE OPERATIONS
WITH LBUD AS REQUIRED.
35. ALL CONCRETE PAVING, INCLUDING SIDEWALKS, CURBS AND GUTTERS REQUIRING REMOVAL, SHALL BE SAWCUT AND REPLACED IN KIND TO THE NEAREST CONSTRUCTION JOINT.
36. THE CONTRACTOR SHALL PROVIDE FOR PUBLIC SAFETY AND CONVENIENCE DURING ALL PHASES OF THE WORK, CONTRACTOR SHALL ESTABLISH ADEQUATE ACCESS TO ALLEYS AND GARAGES AT THE
END OF EACH WORKING DAY TO THE SATISFACTION OF THE CITY OF LONG BEACH AND LBUD.
CONTRACTOR WILL ALSO ACCOMMODATE GARBAGE TRUCK ACCESS ON ALL PICKUP DAYS.
37. SERVICE LATERALS CROSSING THE PIPELINE HAVE NOT BEEN SHOWN ON THE PIPELINE PROFILES, THE CONTRACTOR SHALL ASSUME EACH HOUSE OR BUSINESS WILL HAVE THE FOLLOWING SERVICES CROSSING THE PIPELINE: WATER, SEWER, GAS, AND ELECTRIC. THE CONTRACTOR SHALL TAKE
ADEQUATE MEASURES TO PROTECT THE EXISTING SERVICE LATERALS.
38. REQUIREMENTS FOR WATER METERS AND WATER SERVICE LATERALS SHALL BE PER LBUD
STANDARDS.
39. TRAFFIC LOOPS HAVE BEEN SHOWN ON THE PLANS BASED ON THE BEST AVAILABLE
INFORMATION. THE CONTRACTOR'S BID SHALL ASSUME ALL EFFECTED TRAFFIC LOOPS AND
ASSOCIATED CONDUIT (SHOWN OR NOT SHOWN ON THE PLANS MUST BE REPLACED AS PART OF THE
PROJECT.
40. JETTING SHALL NOT BE ALLOWED UNDER ANY CIRCUMSTANCES.
41. THE CONTRACTOR SHALL COMPLETE THE VALVE TABLES SHOWN ON PLAN SHEETS 4 AS PART OF
THE FIELD MARKED UP AS-BUILT PLANS.
42. THE LOCATION OF ALL HYDRANTS ARE SUBJECT TO THE APPROVAL OF THE LONG BEACH FIRE
DEPARTMENT.
43. CENTERLINES AND RIGHT-OF-WAY LINES SHOWN ARE BASED ON LOS ANGELES COUNTY
ASSESSORS MAPS AND INFORMATION PROVIDED BY LONG BEACH PUBLIC UTILITIES DEPARTMENT.
44. FINAL LOCATION OF METERS AND SERVICES TO BE DETERMINED DURING CONSTRUCTION BY LBUD
ENGINEER.
45. THE CONTRACTOR SHALL PROVIDE POTABLE WATER TO SERVICES WHENEVER AN INTERRUPTION
LASTS LONGER THAN FOUR (4) HOURS.
46. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE TRAFFIC LANE IN EACH DIRECTION DURING CONSTRUCTION. CONTACT LONG BEACH TRANSIT AT (562) 599-8570 PRIOR TO CLOSING ANY BUS STOPS
PER SPECIFICATION 01 55 26.
47. THE CONTRACTOR SHALL SHUT OFF EXISTING CORPORATION STOP, CUT AND CAP EXISTING
SERVICE AT WATER MAIN TAP, CUT AND CAP EXISTING SERVICE AT METER.
48. WATER MAINS SHALL PASS HYDROTESTING AND BACTERIA TESTING BEFORE ANY SERVICES ARE
CONNECTED.
49. CONTRACTOR SHALL INSTALL FLANGE COUPLING ADAPTERS OR FLANGE X PUSH-ON ADAPTERS
WHERE DUCTILE IRON FLANGED FITTINGS ARE JOINED WITH PLAIN END PIPE.
GENERAL CONSTRUCTION NOTES GENERAL CONSTRUCTION NOTES (Cont.)
PUBLIC AGENCIES AND UTILITIES
LONG BEACH PUBLIC UTILITIES DEPARTMENT - WATER/SEWER (562) 570-2300
1800 E WARDLOW ROAD
LONG BEACH, CA 90807
LONG BEACH PUBLIC UTILITIES DEPARTMENT - GAS (562) 570-2046
2400 E SPRING ST. BLD 500 YETEIN HU
LONG BEACH, CA 90806 LBGASUTILITYREQUEST@LONGBEACH.GOV
CITY OF LONG BEACH - TRAFFIC SIGNALS (562) 570-2766
1601 SAN FRANCISCO AVE. DAVID ROBERTS
LONG BEACH, CA 90813
CITY OF LONG BEACH - LIGHTS (562) 570-2766
1601 SAN FRANCISCO AVE. DAVID ROBERTS
LONG BEACH, CA 90813
CITY OF SIGNAL HILL (562) 989-7253
2175 CHERRY AVE. MATT TYRON
SIGNAL HILL, CA 90755
LOS ANGELES COUNTY FLOOD CONTROL DISTRICT (562) 989-7253
2175 CHERRY AVE. MATT TYRON
SIGNAL HILL, CA 90755
LOS ANGELES COUNTY SANITATION DISTRICT (562) 480-7187
10179 GLENOAKS BLVD. ORBEL JARAMILLO
SUN VALLEY, CA 91352
MARATHON PIPELINE (562) 981-3416
2350 223RD ST DARRON CUNNINGHAM
CARSON, CA 90810
CRIMSON PIPELINE LP (562) 285-4161
3780 KILROY ARIPORT WAY REY RODRIGUEZ
LONG BEACH, CA 90806
FRONTIER COMMUNICATION (800) 366-7801
P.O. BOX 639406 UTILITY COORDINATOR
CINCINNATI, OH 45263
PARAMOUNT PETROLEUM (562) 531-2060
2852 GUNDRY AVE STEPHEN PAYTON
SIGNAL HILL, CA 90755
UTI FOR CHARTER COMMUNICATION - LONG BEACH (562) 383-9963
4781 IRWINDALE AVE JUAN GUARADO
IRWINDALE, CA 91706
UTI FOR SC EDISON - DISTRIBUTION - LONG BEACH (562) 302-1212
P.O. BOX 11982 FACILITIES MAPPING, BLDG D - KIM GURULE
SANTA ANA, CA 92711-1982
UTI FOR VERIZON - HUNTINGTON BEACH (714) 375-6760
7352 SLATER AVE MYRNA PENA
HUNTINGTON BEACH, CA 92647
EXISTING STEEL CYLINDER CONCRETE
EXISTING ASBESTOS CEMENT PIPE
EXISTING CAST IRON
EXISTING STEEL WATER
UTILITY ABANDONMENT
EXISTING THRUST BLOCK
UTILITY LEGEND
7-31-2026
7-31-2026
TRAFFIC CONTROL PLAN 1
TRAFFIC CONTROL PLAN 2
8/13/26AD-1
AMENDMENT NO. 1 - NEW SHEETS
1.2-A
AD1 - 6 of 109
E
BI
XB
Y
H
IL
L R
D
N HOLLY GLEN DR
PALO VERDE AVE
E SHERI LN
E ROCHELLE LN
HILLSIDE DR
PEPPER TREE LN
LARIAT CIR RANCHO DR
N DOUBLE TREE LN
BI
XB
Y
TE
R R
AC
E
D R
E 7T
H S
T
SILVERA
AVE
PEPPER TREE LN
R
IV
ER
A
C
IR
'' S
TL
W
24'' STL W 24'' STL W
24'' SCC W
24'' SCC W
24'' SCC W
24'' SC
C
W
24'' S
CC W
24'' SCC W
24'' SCC W
24'' SCC W
24'' S
CC W
24'' S
CC W
24'' SCC W
24'' SCC W
29+71
+8
+0
+0
13+00 14+00
15+00
16+00
17+00
+0
+0
20+00 21+00
22+00
23+00
24+00
25+00
26+00 27+00
28+00
29+00
EX. 24" GATE VALVE
(T10-WVA-004)
TEMPORARY CLOSE
EX. 24" BUTTERFLY
VALVE
(S11-WVA-016)
CLOSE (REMOVE)
EX. 12" GATE VALVE
(S11-WVA-021)
TEMPORARY CLOSE
INSTALL 24" LINE STOP
FOR TEMPORARY
ISOLATION OF PIPE
EX. 12" GATE VALVE
(S11-WVA-029)
CLOSE (ABANDONED)
EX. 12" GATE VALVE
(S11-WVA-028)
CLOSE (ABANDONED)
EX. 8" GATE VALVE
(T10-WVA-003)
TEMPORARY CLOSE
EX ACCESS MANWAY
TO BE ABANDONED IN PLACE
DEWATERING VOLUME:
APPROXIMATE MAXIMUM VOLUME OF WATER = 48,600
GALLONS. ACTUAL VOLUME MAY BE LESS DUE TO
EXISTING LEAK-BY ISOLATION AND CURRENT OPERATING
CONDITION AND CURRENT OPERATING CONDITIONS.
CONTRACTOR TO COORDINATE WITH LBUD.
EX. ACCESS MANWAY
TO BE ABANDONED IN PLACE
EX. ACCESS MANWAY
TO BE ABANDONED IN PLACE
24'' SCC W
24'' STL W
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
VALVE AND PIPELINE ISOLATION PLAN
1" = 50'
7-31-2026
7-31-2026
8/13/26AD-1
AMENDMENT NO. 1 - NEW SHEETS
AD1 - 7 of 109
SEE DETAIL 1,
DETAIL 1 IN SHEET 5
SEE DETAIL 2
SHEET 6
SEE DETAIL 3
SHEET 7
E
BI
XB
Y
H
IL
L R
D
N HOLLY GLEN DR
PALO VERDE AVE
E SHERI LN
E ROCHELLE LN
HILLSIDE DR
PEPPER TREE LN
LARIAT CIR
RANCHO DR
N DOUBLE TREE LN
BI
XB
Y
TE
R R
AC
E
D R
E 7T
H S
T
SILVERA
AVE
PEPPER TREE LN
R
IV
ER
A
C
IR
C
K
O B
WELDED JOINTS THIS
SECTION (APPROX. 134 LF)
WELDED JOINTS THIS SECTION
(APPROX. 175 LF)
O
C
PH-1
PH-3
PH-2
10' EASEMENT TO LBWD
SEE NOTE 1 PER TRACT
NO. 17367 AND 21067
10' EASEMENT TO LBWD
SEE NOTE 1 PER TRACT NO. 17367
AND 21067
10' EASEMENT TO LBWD
SEE NOTE 1 PER TRACT
NO. 17367 AND 21067
SEE DETAIL 1,
DETAIL 2 IN SHEET 5
O
G
ABANDON EXISTING UNLOCATED BLOW-OFF VALVE IN PLACE UTILIZING INTERNAL CCTV-GUIDED INFLATABLE ISOLATION PLUG AND SEQUENCED CLSM MANUFACTURED BY CHERNE, PETERSON, PLUGCO, OR APPROVED EQUAL.
EXISTING VALVE FOR PIPELINE ISOLATION. CONTRACTOR TO COORDINATE WORK EFFORTS WITH LBUD.
B
C
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
SITE PLAN
1" = 50'
REMOVED/ABANDONED VALVE INFORMATION TABLE
CONSTRUCTION NOTES
ITEM DESCRIPTION
EXISTING 24" SCC WATER LINE TO BE ABANDONED IN PLACE. FILL ABANDONED PORTION OF 24" LINE WITH CLSM.1
EXISTING ACCESS MANWAY. CONTRACTOR TO FIELD VERIFY. IF ACCESS MANWAY IS FOUND CONTRACTOR SHALL ABANDON ACCESS MANWAY BY REMOVING LID AND RISER, TOP 2-FEET OF CONC MANHOLE, BACKFILL AND REPAVE OR
MATCH THE EXISTING CONDITION.
O
CATHODIC PROTECTION TO BE ABANDONED AND REMOVED. REMOVE AND REPLACE CONCRETE SIDEWALK PANEL PER
LBUD STD.K
DEMOLITION NOTES
ITEM DESCRIPTION
POTHOLE TABLE
PH-1
PH-2
PH-3
NOTES:
1. PROPERTY BOUNDARIES, RIGHT-OF-WAY LIMITS, LOT LINES, EASEMENTS, AND
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE BASED ON AVAILABLE RECORD
DRAWINGS AND GIS DATA PROVIDED BY LBUD AND HAVE NOT BEEN VERIFIED BY FIELD
SURVEY. THESE FEATURES ARE APPROXIMATE AND ARE PROVIDED FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION
OF ALL UTILITIES AND OTHER EXITING CONDITIONS, INCLUDING PROPERTY LINES AND
EASEMENTS, AS NEEDED PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ENGINEER'S ATTENTION FOR RESOLUTION.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
AND SUPPORT ALL EXISTING UTILITIES WITHIN PROXIMITY UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DISINFECT AND PERFORM BAC-T TEST PIPING, INCLUDING ANY
PIPES AND LATERALS DISCONNECTED AND RECONNECTED, PER ANSI/AWWA C651-23,
PRIOR TO RECONNECTION PER AGENCY REQUIREMENTS. FOR LATERALS,
DISINFECTION AND TESTING SHOULD BE MINIMUM UP TO THE NEAREST VALVE OR AS
REQUIRED BY LBUD. SEE SPECIFICATION SECTION 33 13 00 FOR CHLORINATION OF
WATER MAINS FOR DISINFECTION.
4. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE
PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE
RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE
CONTRACTOR WILL BE RESPONSIBLE FOR DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL BE EXPECTED TO PUMP OUT REMAINING NUISANCE WATER IN
THE PIPE AND DISCHARGE THE WATER TO EXISTING STORM DRAIN CATCH BASINS.
5. EXISTING LARGE GATE VALVES AND CONCRETE ANCHOR BLOCK UNDER THE VALVE
BODY TO BE REMOVED. CONTRACTOR TO REMOVE AND DISPOSE OF THE CONCRETE
ANCHOR BLOCK.
6. CONTRACTOR TO ABANDON EXISTING ACCESS MANHOLE, BY REMOVING LID, RISER,
TOP 2-FEET OF CONCRETE MANHOLE AND BACKFILL AND COMPACT. THE VOID MUST
BE FILLED WITH APPROVED MATERIALS, SUCH AS TYPE II BORROW OR FLOWABLE FILL,
AND COMPACTED TO MEET 90-95% RELATIVE COMPACTION. THE ABANDONED AREA
MUST BE BACKFILLED TO EXISTING GRADE IN UNDEVELOPED AREAS OR PAVED PER
CITY STANDARD IN DEVELOPED AREAS.
7. A POTHOLE INVESTIGATION WAS PERFORMED AT SELECT LOCATIONS ALONG THE
PROJECT ALIGNMENT TO BETTER INFORM EXISTING SUBSURFACE CONDITIONS, WITH
ONLY PARTIAL CONFIRMATION VERIFIED. THE CONTRACTOR SHALL NOT RELY SOLELY
ON THE POTHOLE DATA FOR CONSTRUCTION AND SHALL PERFORM INDEPENDENT
VERIFICATION OF ALL EXISTING UTILITIES AND SUBSURFACE FEATURES AS
NECESSARY TO COMPLETE THE WORK. SEE APPENDICES IN SPECIFICATIONS FOR
FULL POTHOLE REPORT AND SUPPORTING DOCUMENTATION.
8. CONTRACTOR TO FIELD VERIFY THE STEEL PIPE CYLINDER THICKNESS AND ASSESS
THE CONDITION OF PIPE PRIOR TO WELDING. CONFIRM PIPE IS INTACT AND
SUFFICIENT STEEL THICKNESS EXISTS TO SUPPORT PROPOSED WELDING
OPERATIONS AS SHOWN IN THE PLANS.
BLOW-OFF TO BE ABANDONED AND REMOVED. REMOVE CAN AND BLOW-OFF APPURTENANCES.REMOVE AND REPLACE
CONCRETE SIDEWALK PANEL PER LBUD STD.G
7-31-2026
7-31-2026
8/13/26AD-1
AD1 - 8 of 109
E BIXBY HILL RD
S11-WVA-023
S11-WVA-017
S11-WVA-016
E
1'- 6"
1'- 3"
E
3'- 0"
S11-WVA-021
EX. 24" SCC W
(RECORD #3610)
EX. 12" ACP W (MC-3765)
4'-3/8" ± ABOVE 24" SCC W
H C
EX. CABLE
EX. CABLE
3' L X 8'-8" W X 7' D 16
S11-WVA-018
BO
S11-WBO-020 G
FILL THE DISTURBED SOIL
WITH CLSM (MIN. 2FT) FOR
THRUST BLOCK BACKING
2'-1"± J
EX. ROAD CURB
15 EX. BLOW-OFF VAULT
EX. SIDEWALK
G
E
S11-WBO-019 F
8'-8"
S11-WBO-038
PA
LO
V
ER
D E
AV
E
8' L X 8' W X 8' D CONCRETE
SUPPORT/THRUST RESTRAINT
WITH 2 #6 REBAR TIES
8'-0"
EX. CABLE
EX. MEDIAN CURB
EX. MEDIAN CURB
8' -0
SEE NOTE 1
EX. ROAD CURB
'-1
1"
EX. BUTTSTRAP
5'-0"±
EX. THRUST
BLOCK
11'-7"4'-0"
3' -0
5'-0"
E BIXBY HILL RD C/L
NOTES:
1. PROPERTY BOUNDARIES, RIGHT-OF-WAY LIMITS, LOT LINES, EASEMENTS, AND
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE BASED ON AVAILABLE RECORD
DRAWINGS AND GIS DATA PROVIDED BY LBUD AND HAVE NOT BEEN VERIFIED BY FIELD
SURVEY. THESE FEATURES ARE APPROXIMATE AND ARE PROVIDED FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION
OF ALL UTILITIES AND OTHER EXITING CONDITIONS, INCLUDING PROPERTY LINES AND
EASEMENTS, AS NEEDED PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ENGINEER'S ATTENTION FOR RESOLUTION.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
AND SUPPORT ALL EXISTING UTILITIES WITHIN PROXIMITY UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DISINFECT AND PERFORM BAC-T TEST PIPING, INCLUDING ANY
PIPES AND LATERALS DISCONNECTED AND RECONNECTED, PER ANSI/AWWA C651-23,
PRIOR TO RECONNECTION PER AGENCY REQUIREMENTS. FOR LATERALS,
DISINFECTION AND TESTING SHOULD BE MINIMUM UP TO THE NEAREST VALVE OR AS
REQUIRED BY LBUD. SEE SPECIFICATION SECTION 33 13 00 FOR CHLORINATION OF
WATER MAINS FOR DISINFECTION.
4. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE
PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE
RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE
CONTRACTOR WILL BE RESPONSIBLE FOR DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL BE EXPECTED TO PUMP OUT REMAINING NUISANCE WATER IN
THE PIPE AND DISCHARGE THE WATER TO EXISTING STORM DRAIN CATCH BASINS.
5. EXISTING LARGE GATE VALVES AND CONCRETE ANCHOR BLOCK UNDER THE VALVE
BODY TO BE REMOVED. CONTRACTOR TO REMOVE AND DISPOSE OF THE CONCRETE
ANCHOR BLOCK.
6. CONTRACTOR TO ABANDON EXISTING ACCESS MANHOLE, BY REMOVING LID, RISER,
TOP 2-FEET OF CONCRETE MANHOLE AND BACKFILL AND COMPACT. THE VOID MUST
BE FILLED WITH APPROVED MATERIALS, SUCH AS TYPE II BORROW OR FLOWABLE FILL,
AND COMPACTED TO MEET 90-95% RELATIVE COMPACTION. THE ABANDONED AREA
MUST BE BACKFILLED TO EXISTING GRADE IN UNDEVELOPED AREAS OR PAVED PER
CITY STANDARD IN DEVELOPED AREAS.
7. A POTHOLE INVESTIGATION WAS PERFORMED AT SELECT LOCATIONS ALONG THE
PROJECT ALIGNMENT TO BETTER INFORM EXISTING SUBSURFACE CONDITIONS, WITH
ONLY PARTIAL CONFIRMATION VERIFIED. THE CONTRACTOR SHALL NOT RELY SOLELY
ON THE POTHOLE DATA FOR CONSTRUCTION AND SHALL PERFORM INDEPENDENT
VERIFICATION OF ALL EXISTING UTILITIES AND SUBSURFACE FEATURES AS
NECESSARY TO COMPLETE THE WORK. SEE APPENDICES IN SPECIFICATIONS FOR
FULL POTHOLE REPORT AND SUPPORTING DOCUMENTATION.
8. CONTRACTOR TO FIELD VERIFY THE STEEL PIPE CYLINDER THICKNESS AND ASSESS
THE CONDITION OF PIPE PRIOR TO WELDING. CONFIRM PIPE IS INTACT AND
SUFFICIENT STEEL THICKNESS EXISTS TO SUPPORT PROPOSED WELDING
OPERATIONS AS SHOWN IN THE PLANS.
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
DETAIL 1
24" SCC PIPE ABANDONMENT DETAIL AT BIXBY HILL RD
1/2" = 1'-0"
1/2" = 1'-0"
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 4" PIPELINE.J
ABANDON EXISTING VALVE BY REMOVING VALVE AND VALVE CAN. BACKFILL AND REPAVE PER LBUD STD. WDS-406.
BLOW-OFF TO BE ABANDONED AND REMOVED. REMOVE CAN AND BLOW-OFF APPURTENANCES. BACKFILL AND REPAVE
PER LBUD STD. DWG. WDS-406.
BLOW-OFF TO BE ABANDONED AND REMOVED. REMOVE CAN AND BLOW-OFF APPURTENANCES.REMOVE AND REPLACE
CONCRETE SIDEWALK PANEL PER LBUD STD.
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 24" SCC WATER LINE.
E
F
G
H
EXISTING VALVE FOR PIPELINE ISOLATION. CONTRACTOR TO COORDINATE WORK EFFORTS WITH LBUD.C
B
DEMOLITION NOTES
ITEM DESCRIPTION
PROTECT IN PLACE.
ASSEMBLY OF 4" DI OR LBUD APPROVED MATERIAL NIPPLE (1'-3" LENGTHS), 90 BEND AND 4" NIPPLE (LENGTH AS
NEEDED TO BE ABOVE THE THRUST BLOCK) PER LBUD STD. WDS-122.
CONTRACTOR TO VERIFY THE ANCHOR/THRUST BLOCK ON THE EX. VALVE. IF THE VALVE DOES NOT HAVE AN ANCHOR/ THRUST BLOCK. THE CONTRACTOR SHALL INSTALL ANCHOR AND THRUST BLOCK PER LBUD WDS-107.
WELD 24" STEEL BLIND FLANGE WITH 4" OPENING TO EXISTING 24" SCC PIPE (SEE DETAIL 4, SHEET 7). SEE NOTE 8.4
CONSTRUCTION NOTES
ITEM DESCRIPTION
EXISTING 24" SCC WATER LINE TO BE ABANDONED IN PLACE. FILL ABANDONED PORTION OF 24" LINE WITH CLSM.
INSTALL 24" LINE STOP FOR TEMPORARY ISOLATION OF THE PIPELINE. TRENCH RESTORATION PER LBUD STD. WDS-406.
LINE-STOP DETAIL AT PALO VERDE AVE
1/2" = 1'-0"
NEW VALVE INFORMATION TABLE
GIS STRUCTURE SIZE (IN.) MAKE (MFG.) STEM DEPTH NO. OF TURNS NORTH-SOUTH STREET DIST. FROM PROP LINE DIST. FROM CURB EAST-WEST STREET DIST. FROM PROP LINE DIST. FROM CURB DRAWING/FILE NO.
REMARKS
S11-WBO-038 4 - PALO VERDE AVE 12'-6 3/8" 10'-11 11/16" E BIXBY HILL RD 10'-2 1/2" -
DI BLIND FLANGE WITH 4" THREADED OUTLET BEND TO CONNECT TO BLOW-OFF PER LBUD STD. WDS-112.
BLOW-OFF ASSEMBLY AT DEAD END MAIN PER LBUD STD. WDS-112 OR MATERIAL APPROVED BY LBUD. CONTRACTOR
TO REFER TO THE STD DRAWING FOR BLOW-OFF ASSEMBLY.
PROVIDE INSULATING FLANGE KIT.
4" BLOW-OFF ASSEMBLY WITH CAST IRON LID COVER PER LBUD STD. WDS-112.
PROVIDE THRUST BLOCK OF SIZE SPECIFIED IN PLANS.
7-31-2026
7-31-2026
8/13/26AD-1
AD1 - 9 of 109
HILLSIDE DR13
S11-WVA-028
13'-6"±
EX. 24" SCC W (MC-3982)
S11-WVA-029
EX. 8" VCP SEWER
EX. 12" ACP W (MC-3981)
A
L
1'-2"±
I
1'-2" L X 4' W X 3' D3
A
4'-0"
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
DETAIL 2
SCALE:
12" STL PIPE ABANDONMENT DETAIL AT ROCHELLE LN
1/2" = 1'-0"
NOTES:
1. PROPERTY BOUNDARIES, RIGHT-OF-WAY LIMITS, LOT LINES, EASEMENTS, AND
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE BASED ON AVAILABLE RECORD
DRAWINGS AND GIS DATA PROVIDED BY LBUD AND HAVE NOT BEEN VERIFIED BY FIELD
SURVEY. THESE FEATURES ARE APPROXIMATE AND ARE PROVIDED FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION
OF ALL UTILITIES AND OTHER EXITING CONDITIONS, INCLUDING PROPERTY LINES AND
EASEMENTS, AS NEEDED PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ENGINEER'S ATTENTION FOR RESOLUTION.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
AND SUPPORT ALL EXISTING UTILITIES WITHIN PROXIMITY UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DISINFECT AND PERFORM BAC-T TEST PIPING, INCLUDING ANY
PIPES AND LATERALS DISCONNECTED AND RECONNECTED, PER ANSI/AWWA C651-23,
PRIOR TO RECONNECTION PER AGENCY REQUIREMENTS. FOR LATERALS,
DISINFECTION AND TESTING SHOULD BE MINIMUM UP TO THE NEAREST VALVE OR AS
REQUIRED BY LBUD. SEE SPECIFICATION SECTION 33 13 00 FOR CHLORINATION OF
WATER MAINS FOR DISINFECTION.
4. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE
PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE
RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE
CONTRACTOR WILL BE RESPONSIBLE FOR DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL BE EXPECTED TO PUMP OUT REMAINING NUISANCE WATER IN
THE PIPE AND DISCHARGE THE WATER TO EXISTING STORM DRAIN CATCH BASINS.
5. EXISTING LARGE GATE VALVES AND CONCRETE ANCHOR BLOCK UNDER THE VALVE
BODY TO BE REMOVED. CONTRACTOR TO REMOVE AND DISPOSE OF THE CONCRETE
ANCHOR BLOCK.
6. CONTRACTOR TO ABANDON EXISTING ACCESS MANHOLE, BY REMOVING LID, RISER,
TOP 2-FEET OF CONCRETE MANHOLE AND BACKFILL AND COMPACT. THE VOID MUST
BE FILLED WITH APPROVED MATERIALS, SUCH AS TYPE II BORROW OR FLOWABLE FILL,
AND COMPACTED TO MEET 90-95% RELATIVE COMPACTION. THE ABANDONED AREA
MUST BE BACKFILLED TO EXISTING GRADE IN UNDEVELOPED AREAS OR PAVED PER
CITY STANDARD IN DEVELOPED AREAS.
7. A POTHOLE INVESTIGATION WAS PERFORMED AT SELECT LOCATIONS ALONG THE
PROJECT ALIGNMENT TO BETTER INFORM EXISTING SUBSURFACE CONDITIONS, WITH
ONLY PARTIAL CONFIRMATION VERIFIED. THE CONTRACTOR SHALL NOT RELY SOLELY
ON THE POTHOLE DATA FOR CONSTRUCTION AND SHALL PERFORM INDEPENDENT
VERIFICATION OF ALL EXISTING UTILITIES AND SUBSURFACE FEATURES AS
NECESSARY TO COMPLETE THE WORK. SEE APPENDICES IN SPECIFICATIONS FOR
FULL POTHOLE REPORT AND SUPPORTING DOCUMENTATION.
8. CONTRACTOR TO FIELD VERIFY THE STEEL PIPE CYLINDER THICKNESS AND ASSESS
THE CONDITION OF PIPE PRIOR TO WELDING. CONFIRM PIPE IS INTACT AND
SUFFICIENT STEEL THICKNESS EXISTS TO SUPPORT PROPOSED WELDING
OPERATIONS AS SHOWN IN THE PLANS.
1/2" = 1'-0"
CUT AND REMOVE INTERFERING PORTIONS OF EXISTING 12" STL WATER LINE.I
CONSTRUCTION NOTES
ITEM DESCRIPTION
EXISTING 24" SCC WATER LINE TO BE ABANDONED IN PLACE. FILL ABANDONED PORTION OF 24" LINE WITH CLSM.1
DEMOLITION NOTES
ITEM DESCRIPTION
VALVE ABANDONMENT PER LBUD STD. WDS-127.A
PROVIDE THRUST BLOCK OF SIZE SPECIFIED IN PLANS.
WELD 12" STEEL BLIND FLANGE. SEE NOTE 8.
PLUG PIPE WITH CEMENT MORTAR. 12" MINIMUM DEPTH.
PROTECT IN PLACE.
EXISTING 12" WATER LINE TO BE ABANDONED IN PLACE.L
CONTRACTOR TO VERIFY THE ANCHOR/THRUST BLOCK ON THE EX. VALVE. IF THE VALVE DOES NOT HAVE AN ANCHOR/ THRUST BLOCK. THE CONTRACTOR SHALL INSTALL ANCHOR AND THRUST BLOCK PER LBUD WDS-107.17
7-31-2026
7-31-2026
8/13/26AD-1
AD1 - 10 of 109
BIXBY TERRACE DR
T10-WM-025
T10-WVA-003
3'-2"±
EX. 33" RCP SD
4' ± ABOVE EXIST.
24" STL W
EX. 4" CIP FM
EX. 6" VCP SS
EX. CONC. ENCASEMENT
M
N
O
3'-2" L X 9' W X 7' D
SEE NOTE 3
SEE NOTE 3
3'-2"
3'-2"±
6' -1
5'
-8
15FILL THE DISTURBED SOIL WITH CLSM (MIN.
2FT) FOR THRUST BLOCK BACKING
SEE NOTE 2
CAUTION!!
VERIFY LOCATION OF
ALL UTILITIES WITHIN
PROXIMITY, PROTECT IN
PLACE AND PROVIDE
SUPPORT AS NEEDED.
9' -0
SLEEVE OR WRAPPER PLATE PER
LINE-STOP REQUIMENTS
COMPLETION FLANGE
EXISTING PIPE
CONCRETE SUPPORT (4,500 PSI)
L W
D
#6 REBAR
#6 REBAR
UNDISTURBED EARTH (TYP)
THRUST
BLOCK
(CONCRETE
4,500 PSI)
PROIVIDE CLSM AS SHOWN IN
PLANS IF THE SOIL IS DISTURBED
EXISTING PIPE
BACKFILL SOIL
EX MORTAR COATING 8" CUTBACK
EX STEEL CYLINDER
EX MORTAR LINING
8" TO 14" (TYP)
B5
8" (MIN)
NEW DIP BLIND
FLANGED WITH 4"
NIPPLE PER WDS-113
INSULATING
FLANGE GASKET
EX 24" SCC
PIPE
BLOW-OFF ASSEMBLY PER WDS-113
WELDED FLANGE
ADD LINING/COATING REPAIR
AFTER WELDING
B
NOTES:
1. TORQUE BOLTS PER INSULATING FLANGE SET
MANUFACTURERS RECOMMENDATIONS (TYP)
2. ASTM A307 BOLT - UNC THREADS, WITH ASTM
A563 NUT, ZINC COATED
SEE NOTE 2
INSULATING SLEEVE (1
REQD) EACH BOLT
INSULATING GASKET (1
REQD)
PLATE WASHER (2 REQD)
FOR EACH BOLT
INSULATING WASHER (2
REQD) FOR EACH BOLT
FLANGES
DIRECTOR OF WATER/SEWER ENGINEERING
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
APP'D.BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
NTSSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 07/20/26
VARIOUS
DESCRIPTIONDATEREV. SHEET OF SHEETS
MC-5264
DRAWING / FILE NUMBER:
DATE
DATE
GENERAL MANAGER
LONG BEACH PUBLIC UTILITIES
DEPARTMENT
RANCHO LOS ALAMITOS TRANSMISSION
MAIN ABANDONMENT PROJECT
JH
ISC 07/20/26
FI
LE
N A
M E
: M c_ dw g
D E
S
IG
N B
Y
N/A
MUNIS PROJECT: 6512030005
801 South Grand Avenue, Suite 275 Los Angeles, CA 90071 562.314.4195 www.atkinsrealis.com/northamerica
ANATOLE FALAGÁN
DETAIL 3
24" SCC PIPE ABANDONMENT DETAIL AT BIXBY TERRACE DR
1/2" = 1'-0"
NOTES:
1. PROPERTY BOUNDARIES, RIGHT-OF-WAY LIMITS, LOT LINES, EASEMENTS, AND
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE BASED ON AVAILABLE RECORD
DRAWINGS AND GIS DATA PROVIDED BY LBUD AND HAVE NOT BEEN VERIFIED BY FIELD
SURVEY. THESE FEATURES ARE APPROXIMATE AND ARE PROVIDED FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION
OF ALL UTILITIES AND OTHER EXITING CONDITIONS, INCLUDING PROPERTY LINES AND
EASEMENTS, AS NEEDED PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE
BROUGHT TO THE ENGINEER'S ATTENTION FOR RESOLUTION.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
AND SUPPORT ALL EXISTING UTILITIES WITHIN PROXIMITY UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DISINFECT AND PERFORM BAC-T TEST PIPING, INCLUDING ANY
PIPES AND LATERALS DISCONNECTED AND RECONNECTED, PER ANSI/AWWA C651-23,
PRIOR TO RECONNECTION PER AGENCY REQUIREMENTS. FOR LATERALS,
DISINFECTION AND TESTING SHOULD BE MINIMUM UP TO THE NEAREST VALVE OR AS
REQUIRED BY LBUD. SEE SPECIFICATION SECTION 33 13 00 FOR CHLORINATION OF
WATER MAINS FOR DISINFECTION.
4. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE
PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE
RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE
CONTRACTOR WILL BE RESPONSIBLE FOR DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL BE EXPECTED TO PUMP OUT REMAINING NUISANCE WATER IN
THE PIPE AND DISCHARGE THE WATER TO EXISTING STORM DRAIN CATCH BASINS.
5. EXISTING LARGE GATE VALVES AND CONCRETE ANCHOR BLOCK UNDER THE VALVE
BODY TO BE REMOVED. CONTRACTOR TO REMOVE AND DISPOSE OF THE CONCRETE
ANCHOR BLOCK.
6. CONTRACTOR TO ABANDON EXISTING ACCESS MANHOLE, BY REMOVING LID, RISER,
TOP 2-FEET OF CONCRETE MANHOLE AND BACKFILL AND COMPACT. THE VOID MUST
BE FILLED WITH APPROVED MATERIALS, SUCH AS TYPE II BORROW OR FLOWABLE FILL,
AND COMPACTED TO MEET 90-95% RELATIVE COMPACTION. THE ABANDONED AREA
MUST BE BACKFILLED TO EXISTING GRADE IN UNDEVELOPED AREAS OR PAVED PER
CITY STANDARD IN DEVELOPED AREAS.
7. A POTHOLE INVESTIGATION WAS PERFORMED AT SELECT LOCATIONS ALONG THE
PROJECT ALIGNMENT TO BETTER INFORM EXISTING SUBSURFACE CONDITIONS, WITH
ONLY PARTIAL CONFIRMATION VERIFIED. THE CONTRACTOR SHALL NOT RELY SOLELY
ON THE POTHOLE DATA FOR CONSTRUCTION AND SHALL PERFORM INDEPENDENT
VERIFICATION OF ALL EXISTING UTILITIES AND SUBSURFACE FEATURES AS
NECESSARY TO COMPLETE THE WORK. SEE APPENDICES IN SPECIFICATIONS FOR
FULL POTHOLE REPORT AND SUPPORTING DOCUMENTATION.
8. CONTRACTOR TO FIELD VERIFY THE STEEL PIPE CYLINDER THICKNESS AND ASSESS
THE CONDITION OF PIPE PRIOR TO WELDING. CONFIRM PIPE IS INTACT AND
SUFFICIENT STEEL THICKNESS EXISTS TO SUPPORT PROPOSED WELDING
OPERATIONS AS SHOWN IN THE PLANS.
1/2" = 1'-0"
REMOVE EXISTING FLEXIBLE COUPLING.
UNBOLT AND REMOVE TIE RODS.
EXISTING ACCESS MANWAY. CONTRACTOR TO FIELD VERIFY. IF ACCESS MANWAY IS FOUND CONTRACTOR SHALL ABANDON ACCESS MANWAY BY REMOVING LID AND RISER, TOP 2-FEET OF CONC MANHOLE, BACKFILL AND REPAVE OR
MATCH THE EXISTING CONDITION.
M
N
O
CONSTRUCTION NOTES
ITEM DESCRIPTION
EXISTING 24" SCC WATER LINE TO BE ABANDONED IN PLACE. FILL ABANDONED PORTION OF 24" LINE WITH CLSM.1
DEMOLITION NOTES
ITEM DESCRIPTION
PROVIDE THRUST BLOCK OF SIZE SPECIFIED IN PLANS.12
WELD ON 24" STEEL BLIND FLANGE. SEE NOTE 8.5
PROTECT IN PLACE.15
LINE-STOP DETAIL
NTS
LINE-STOP NOTES
1. REFER TO PLANS FOR DIMENSIONS.
2. MINIMUM BEARING AREA WAS CALCULATED FOR ALLOWABLE SOIL BEARING PRESSURE OF 2,000 PSF AND 188 PSI TEST PRESSURE. SPECIAL DESIGN CALCULATIONS ARE TO BE SUBMITTED TO LBUD FOR APPROVAL IF ALLOWABLE SOIL BEARING CAPACITY IS GREATER OR LOWER THAN 2,000 PSF OR
LOWER THAN 2,000 PSF.
3. COAT AND WRAP ALL METAL SURFACES IN ACCORDANCE WITH SECTION 33 11 19 OF THE
SPECIFICATIONS, (PROTECTIVE COATINGS). ALL CONCRETE SHALL BE 4,500 PSI MINIMUM, 28 DAYS
COMPRESSIVE STRENGTH. CONCRETE IS TO BE PLACED AGAINST UNDISTURBED EARTH.
4. ALL VERTICAL SURFACES NOT BEARING AGAINST UNDISTURBED EARTH SHALL BE FORMED.
THRUST BLOCK DETAIL
NTS
THRUST BLOCK NOTES
1. REFER TO PLANS FOR DIMENSIONS.
2. MINIMUM BEARING AREA WAS CALCULATED FOR ALLOWABLE SOIL BEARING PRESSURE OF 2,000 PSF AND 188 PSI TEST PRESSURE. SPECIAL DESIGN CALCULATIONS ARE TO BE SUBMITTED TO LBUD FOR APPROVAL IF ALLOWABLE SOIL BEARING CAPACITY IS GREATER OR LOWER THAN 2,000 PSF. REFER TO
LBUD STANDARD (WDS-107) FOR PIPE SIZE 12" AND SMALLER FOR DEAD END.
3. COAT AND WRAP ALL METAL SURFACES IN ACCORDANCE WITH SECTION 33 11 19 OF THE
SPECIFICATIONS, (PROTECTIVE COATINGS).
This is the start of the file's text. The full file is on GovTribe.