RA 693JK322RA0001 Attachment 2 Project Deliverables.doc
DOC document 29 KB Posted
- Attached to
- FY22 - Research Announcement #8
- Solicitation number
- 693JK322RA0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers RFQ 693JK322RA0001.pdf | ||
| RA 693JK322RA0001_Notice_Revised_03312022.doc | DOC document | |
| RA 693JK322RA0001 Attachment 6 Title VI Non Discrimination Assurances.docx | DOCX document | |
| RA 693JK322RA0001 Attachment 5 Additional Info.doc | DOC document | |
| RA 693JK322RA0001 Attachment 7 Research Topics.docx | DOCX document | |
| RA 693JK322RA0001 Attachment 1 Team Project Activities.doc | DOC document | |
| RA 693JK322RA0001 Attachment 4 Budget Summary.pdf | ||
| RA 693JK322RA0001 Attachment 8 Terms and Conditions.docx | DOCX document | |
| RA 693JK322RA0001_03192022 Notice.doc | DOC document | |
| RA 693JK322RA0001 Attachment 3 Deliverable-Milestone Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Transportation (USDOT)
RA #693JK322RA0001
Pipeline and Hazardous Materials Safety Administration (PHMSA) Attachment #2
SAMPLE SAMPLE SAMPLE SAMPLE
PROJECT DELIVERABLES
1. Conduct kick-off Team meeting and determine experimental procedure to measure residual stress. Results due to DOT within three (3) months of the effective date of the Agreement.
2. Conduct analytical and finite element analysis to calculate residual stress, and align experimental results with the mechanical modeling. Results due to DOT within six (6) months of the effective date of the Agreement.
3. Measure material properties, residual stress, prepare free films and adhesion test panels, and establish mechanical modeling of the residual stress of the multi-layer coatings. Results due to DOT within nine (9) months of the effective date of the Agreement.
4. Conduct adhesion and free film degradation test and residual stress relaxation testing. Results due to DOT within twenty-one (21) months of the effective date of Agreement.
5. An understanding of multi-layer pipeline coating disbondment mechanism(s) due to residual stress development resulting from coating manufacturing/extrusion process and characteristics of surface anchor profile and surface preparation methods will be established. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
6. Strategy to reduce multi-layer pipeline coating disbondment will also be recommended. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
7. Quarterly status and progress reports and final project report will be prepared and submitted in accordance the Agreement.
8. Paper submission to conference presentations and publication to NACE or other pipeline conference. Due to DOT within twenty-four (24) months of the effective date of the Agreement.
SAMPLE SAMPLE SAMPLE SAMPLE