SOLICITATION_R6_MBS_08_25.pdf
PDF 404 KB Posted
- Attached to
- ROAD MAINTENANCE, SNOQUALMIE RANGER DISTRICT-ENUMCLAW AREA. MT. BAKER-SNOQUALMIE NATIONAL FOREST
- Solicitation number
- R6-MBS-08-25
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment-1.pdf | ||
| SOL _R6-MBS-08-25-SM_PACKET.pdf | ||
| SOL_08_25_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
R6-MBS-08-25 5/28/2008 UNDER BDSA REG. 2 �
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Mt Baker Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A Everett, WA 98201
As ordered from date of Award through June 30, 2009
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Bonnie Childs 425 783-6053 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5a.
This request does not commit the Government to pay any costs incurred in the preparation of the
June 20, 2008 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(a) (b) (c) (d) (e) (f)
ROAD MAINTENANCE
Snoqualmie Ranger District Enumclaw Area
DO NOT ENTER PRICES HERE
Mail quote to:
Contracting Officer Mt. Baker-Snoqualmie National Forest
SEE ATTACHED
OF ITEMS
SCHEDULE
2930 Wetmore Avenue, Suite 3A Everett, WA 98201
OR fax quote to: 425-783-0129
Technical Contact: Ron Hausinger
(425) 888-1421 X-257
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR
DAYS
12. DISCOUNT FOR PROMPT PAYMENT � NUMBE
R
PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
SCHEDULE OF ITEMS
ROAD MAINTENANCE- SNOQUALMIE (ENUMCLAW AREA) RANGER DISTRICT
SUB-
ITEM
NO. Description
Estimated Quantity Unit Unit Price TOTAL PRICE
251 (1) Rirap Machine placed 50 Cubic yd $______________ $____________
251 (2) Rirap Hand placed 25 Square yd $______________ $____________
640 (1) Install Road Closure Devices 25 each $______________ $____________
807(2) Excavator 8 Hour $______________ $____________
807(3) Backhoe 8 Hour $______________ $____________
807(4) Grader 8 Hour $______________ $____________
807(5) Crawler Tractor 8 Hour $______________ $____________
807(6) Dump Truck 8 Hour $______________ $____________
807(10) Trailer 8 Hour $______________ $____________
807(11) 3 Axle Low Boy 8 Hour $______________ $____________
807(12) Service Truck W / Chain Saw 10 Hour $______________ $____________
811(1) Surface Maintenance Level 3-5 Roads 3 Single Lane Mile $______________ $____________
811(2) Surface Maintenance Level 3-5 Roads 6 Double Lane Mile $______________ $____________
811(4) Shoulder Maintenance 2 Road Mile $______________ $____________
813(1) Spot Surfacing, Forest Service Furnished 15 Cubic Yard $______________ $____________
813(3) Spot Surfacing, Commercial Source 30 Ton $______________ $____________
813(4) Haul 750 Cubic Yard Mile $______________ $____________
813(5) Haul 9 Truck Hour $______________ $____________
832(1) Load, Haul and Place Material 90 Cubic Yard $______________ $____________
832(2) Load, Haul and Place Material 1 Mile $______________ $____________
832(4) Haul 250 Cubic Yard Mile $______________ $____________
833(1)a Installation of 18 Inch diameter pipe, Government furnished. 40 Linear
Foot $______________ $____________
ROAD MAINTENANCE- SNOQUALMIE (ENUMCLAW AREA) RANGER DISTRICT
SUB-
ITEM
NO. Description
Estimated Quantity Unit Unit Price TOTAL PRICE
833(1)a1 Installation of 18 Inch diameter pipe, Government furnished, buried cable in/or along road.
40 Linear Foot $______________ $____________
833(1)b Installation of 24 Inch diameter pipe, Government furnished. 60 Linear
Foot $______________ $____________
833(1)b1 Installation of 24 Inch diameter pipe, Government furnished, buried cable in/or along road.
40 Linear Foot $______________ $____________
833(1)c Installation of 36 Inch diameter pipe, Government furnished. 40 Linear
Foot $______________ $____________
833(1)c1 Installation of 36 Inch diameter pipe, Government furnished, buried cable in/or along road.
40 Linear Foot $______________ $____________
833(2) Culvert Removal 4 Each $______________ $____________
833(3) Water-bar Installation 5 Each $______________ $____________
833(6) Cross Ditch Installation 3 Each $______________ $____________
834(1) Clean and Recondition Culverts 24 inch Diameter and under 45 Each $______________ $____________
834(2) Clean and Recondition Culverts 24 inch through 48 inch Diameter 35 Each $______________ $____________
834(3) Clean and Recondition Culverts Over 48 Inch Diameter 10 Each $______________ $____________
834(4) Clean Ditches 4 Mile $______________ $____________
834(5) Clean Ditches and Drainage Structures 4 Mile $______________ $____________
834(6) Clean Drainage Structures 5 Mile $______________ $____________
838(1) 838 MAINTENANCE FOR LIMITED USE 8 Mile $______________ $____________
839(1) Spring Recurrent Maintenance of ML 4 and 5 Roads 7 Mile $______________ $____________
839(2) Spring Recurrent Maintenance of ML 3 Roads 25 Mile $______________ $____________
841(1) Establish Vegetation 0.05 Acres $______________ $____________
851(2) Danger Tree Removal 10 Each $______________ $____________
851(3) Hazard or Obstruction Removal ML 3-5 Roads 10 Miles $______________ $____________
851(4) Hazard or Obstruction Removal ML 2 Roads 10 Miles $______________ $____________
851(5) Hazard or Obstruction Removal ML 3-5 Roads 10 Each $______________ $____________
851(6) Hazard or Obstruction Removal ML 2 Roads 7 Each $______________ $____________
861(4) Recondition/clean traffic gate 1 Each $______________ $____________
ROAD MAINTENANCE- SNOQUALMIE ENUMCLAW AREA) RANGER DISTRICT
SUB-
ITEM
NO. Description
Estimated Quantity Unit Unit Price TOTAL PRICE
861(8) Structure component and fastener replacement gate 1 Lump
Sum $______________ $____________
872(1) Clean Sign Face 15 Each $______________ $____________
872(3) Recondition Sign Face Government Materials 15 Each $______________ $____________
872(4) Install or Replace Post 10 Each $______________ $____________
872(8) Install or Replace Sign Government Furnished 20 Each $______________ $____________
872(9) Remove Sign 10 Each $______________ $____________
872(10) Remount Sign 5 Each $______________ $____________
872(12) Maintain Marker 5 Each $______________ $____________
872(14) Replace Marker Government Furnished 25 Each $______________ $____________
881(1) Mobilization 1 Lump Sum $______________ $____________
881(3)a Equipment Moving – Dump Truck 25 Miles $______________ $____________
881(3)b Equipment Moving – Dump Truck and Backhoe 20 Miles $______________ $____________
881(3)c Equipment Moving - Backhoe 10 Miles $______________ $____________
881(3)d Equipment Moving – 3 Axle Low boy 25 Miles $______________ $____________
TOTAL PRICE ALL SUB-ITEMS $_____________
Note: This is an Indefinite Quantities contract. The Quantities shown are for price evaluation purposes only!
The minimum guarantee is $60,000 and the maximum contact amount shall not exceed $99,000.
Offerors must bid on all subitems.
SECTION B - SCHEDULE OF ITEMS
Note 1: Be sure to submit the capability information (past performance and experience) as required to be evaluated for contract award as identified in FAR 52.212-2 Evaluation.
Failure to submit the required information will cause the offeror to be evaluated as if it had no experience or past performance.
Note 4: Task orders will include Pay Item Numbers and Quantity of each Subitem ordered. A
Work Order will be issued designating the roads to be maintained for each Task Order and the time frame in which the work shall be accomplished. If the contractor fails to perform the ordered work within the timeframe required, the ordered work may be deleted from the contract and performed by other means.
B.1 ORDERING
Ordering 52.216-18 (Oct 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule.
Such orders may be issued from date of contract award, through June 1, 2009.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
Order Limitations 52.216-19 (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00 [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $99,000 [insert dollar figure or quantity];
(2) Any order for a combination of items in excess of maximum contract amount shown on the schedule of items for each of the contract awards
(3) A series of orders from the same ordering office within 3 calendar days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the government may acquire the supplies or services from another source.
Indefinite Quantity 52.216-22 (Oct 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after June 30, 2009.
B.2 PERSONNEL AUTHORIZED TO PLACE ORDERS AGAINST THIS CONTRACT
The following Forest Service personnel are authorized to place, compete, award, and administer task orders under this contract:
A. Orders may be placed by any warranted contracting officer within their authority and located in the Western Washington Area Acquisition group (Mt. Baker-Snoqualmie, Olympic and Gifford Pinchot National Forests).
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF CONTRACT
A. The intent of this performance based service contract is to provide for road maintenance of National Forest System Roads on the Mt. Baker-Snoqualmie National Forest (Snoqualmie Ranger Districts – Enumclaw Area).
B. District maps may be obtained at the district offices. Snoqualmie Ranger District 902 S.E.
North Bend Way, North Bend, Wa. For a complete list of roads contact Ron Hausinger at rhausinger@fs.fed.us
C. The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.
D. Locations that may be used for staging of equipment and materials are available in all three contract areas. The government will not be held liable for contractor’s equipment and material stored in these locations.
C.2 FURNISHING OF MATERIAL
A. Unless otherwise stated in the Special Project Specifications, the contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications.
B. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
C. The Contractor shall start work when directed within three calendar days from the date of work order.
D. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.
E. The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures.
C.3 COORDINATION OF CONTRACT DOCUMENTS
The specifications, drawings, and all other provisions are essential parts of the contract. They are intended to be mutually complementary. In the case of discrepancy, the following is the order of precedance (supplementing FAR 52.214-29 in Section L of this contract) : a. Drawings;
b. Standard Specifications for Maintenance of Roads.
C.4 TECHNICAL SPECIFICATIONS FOR MAINTENANCE OF ROAD
The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.
C.5 APPLICABLE PUBLICATIONS AND FORMS
Publications and forms that apply to this contract. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker- Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the contractor shall submit to the contracting officer a price proposal within 30 calendar days following receipt of the change by the Contractor.
Publication Publication Number or WWW Address Revision
Date
Manual of Uniform Traffic Control Devices
MUTCD 2003
Sign and Poster Guidelines for the Forest Service
EM-7100-15
Mt. Baker-Snoqualmie National Forest Road Rules Document
Copy of Commercial Road Rules Listing is available upon request.
Mt. Baker-Snoqualmie N.F. Programmatic Biological Assessment for South Zone Road Maintenance (2006-2009), A copy of the Biological Assessment is available upon request.
Memorandum of Agreement between the USDA Forest Service, Region 6 and the Washington State Department of Ecology
Copy of MOA is available upon request.
Roads Maintenance Level Guide for Forest Service Roads.
San Dimas Guide for Road Maintenance Levels
MEMORANDUM OF UNDERSTANDING
Between Washington State Department of Fish and Wildlife And USDA Forest Service, Pacific Northwest Region
Copy of MOU is available upon request.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-4 Inspection of Services--Fixed-Price (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.242-15 Stop Work Order (AUG 1989)
F.2 AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)
The effective period of this contract is from DATE OF AWARD through JUNE 30, 2009.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at (location to be determined following contract award)
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 PROSECUTION OF WORK -- WORK HOUR LIMITS -- WORK ITEM LIMITS
The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.
When excavation work prevents traffic flow, the Contractor is authorized to delay traffic not to exceed 30 minutes.
Any activities requiring closure to the public shall be scheduled with the CO at least 14 days in advance.
The contractor shall shut down all equipment when there is 1 inch precipitation in a 24 hour period and/or ½ inch precipitation in 1 hour.
H.2 USE OF PREMISES
General - The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of Government business.
Camps - Before any camp or storage site is opened or operated on National Forest land or lands administered by the Government, written permission shall be obtained through the Government.
Camp is interpreted to include the campsite or trailer parking area of any employee or subcontractor working on the project. Such permission, if granted, will be without charge to the Contractor.
H.3 USE OF ROADS BY CONTRACTOR
The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.
Before shutting down any operations, leave all travel ways in a condition suitable for traffic.
Unless otherwise provided, traffic delays may not exceed 30 minutes.
If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.
Authorization to use such additional roads may include maintenance requirements and use limitations.
The roads authorized for use will be subject to the following provisions:
(a) The current National Forest Road Use Rules Document is applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of this contract. Copies are available upon request.
(b) Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions to those shown in the current Road Use Rules Document and will be posted on the road.
H.4 TRAFFIC CONTROL, FLAGGERS, BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. Keep traffic devices current with maintenance operation and remove upon completion.
All operations and signing shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
Advisory speed plates may be used to control traffic through the work area.
Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.
H.5 MOTORIZED EQUIPMENT
Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer or as elsewhere provided herein.
H.6 EQUIPMENT REQUIREMENTS
The Contractor shall furnish equipment meeting OSHA (Occupational Safety and Health Act) requirements. When the Contractor is paid for furnishing and operating equipment on an hourly or daily basis, it shall be operated at its design speed, or the maximum speed feasible under prevailing conditions.
Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 ½ tons gross weight.
Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
H.7 SPECIAL REQUIREMENTS FOR WATER DRAFTING EQUIPMENT
Water drafting equipment may be used only at water sources designated on the Vicinity Map, task order, or provided by the Contracting Officer. Such equipment shall include a screen around the intake (foot valve) with openings no larger than 1/8 - inch. An air gap or positive antisiphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials. Materials must be readily available and appropriate measures taken to prevent petroleum products from entering the water source.
H.8 HAZARDOUS MATERIAL SPILL CLEAN-UP KIT
A hazardous material spill clean-up kit shall be maintained and readily available for potential use on the project at each work site. Spill clean-up kits shall contain the following items as a minimum:
• 1 case absorbent pads suitable for absorbing hydraulic fluid, engine oil, and fuel
• 1 gallon "Plug-a-Dike" or equivalent material
• A nineteen liter (five-gallon) mixing container
• 20 meters of 150 mm absorbent, floating booms for absorbing hydraulic fluid, engine oil, and fuel from a water surface
H.9 LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS
(a) The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:
1. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government. Unless otherwise provided in the Special Project Specifications, the Contractor shall confine contract operations to within the areas designated in contract documents.
Unless otherwise provided in this contract, the Contractor shall gather rock which falls outside the roadway due to contract operations and dispose of it as directed by the Government.
2. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen’s, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.
(b) The Contractor shall confine operations to within the work area limits, immediate work area, or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
The Contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this project.
(c) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.
1. Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
2. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
(d) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. The Contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.
1. If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the Contracting Officer and other appropriate agencies.
2. At all on-site work areas (including Contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the Contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the Contracting Officer or representative. When deemed appropriate, additional planned preventive measures shall be established for review by the Contracting Officer or representative.
3. The Contractor, acting independently, shall immediately take action to notify the appropriate agencies including the Contracting Officer, and to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the Contractor's employees, directly or indirectly. The Contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms, or other containment devices. In the event the
Government determines that additional resources beyond those of the Contractor's are required, the Contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean-up of petroleum products or other hazardous substance releases caused by Contractor's employees or resulting from or related to construction operations.
4. The Contractor shall notify the Contracting Officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.
H.10 PROTECTION OF BOTANICAL RESOURCES
Previously unknown or unlisted populations of Protected, Endangered, Threatened, or Sensitive (PETS) plant species, or potential habitat for PETS species, may be located within contract project boundaries. The modification of contract specifications may be required to protect previously unknown PETS plant populations.
(a) Government's Responsibility - The Government will identify, as they become known, locations of PETS species that the Contractor could encounter in the progress of work under this contract.
(b) Contractor's Responsibility - The Contractor shall protect these areas that contain PETS species, as directed in writing by the Government.
H.11 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT (DEC 1997)
To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary, this may require a pressure hose, to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.
The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.
Special care shall be taken to assure removal of noxious weeds and their seed, specifically any species on the Washington State Noxious Weed Control Board website:
http://www.nwcb.wa.gov/weed_list/weed_list.htm
1. If any previously undiscovered Threatened Endangered or Sensitive vascular plants, bryophytes, lichens, or fungi are discovered, before or during project implementation, halt work until a USFS botanist is consulted and necessary mitigation measures are enacted. The list of rare plants of concern can be found on the following website:
http://www.fs.fed.us/r6/sfpnw/issssp/agency-policy/.
2. Treat known infestations before ground disturbance begins.
3. For actions conducted or authorized by written permit by the Forest Service that will operate outside the limits of the road prism, require the cleaning of all heavy equipment prior to entering NFS Lands. See engineering contract specs H.12.
4. Suppliers must provide annual documentation to the USFS indicating that the following products have been examined by a qualified inspector and deemed free of State listed noxious weeds:
• Straw or other Mulch
• Gravel, Rock, or other fill
• Seeds (according to AOSA standards)
5. If weeds are present in the project area, all equipment and gear must be cleaned before leaving the project area to avoid spreading the infestation further.
6. If weeds are present in the project area, work from relatively weed-free areas into the infested area rather than vica-versa.
Revegetate all areas of bare soil exposed by project activities if there is a risk of noxious weed invasion. Native plant materials are the first choice in revegetation where timely natural regeneration of the native plant community is not likely to occur. Follow revegetation criteria and specifications for this project (see Spec. 841.06 Seed Mix)
H.12 CONTROL POINTS
The Contractor is responsible for the preservation of existing bench marks and other control points. The cost of replacing them may be charged against the Contractor and may be deducted from the payment for the work. If the Contractor finds missing controls they shall notify the Government who will replace them within two (2) days.
H.13 SUBMITTALS
The following submittals are required for this project:
Title Referenced by Contract clause or Specification No.
Time of Government Approval After Submittal
Quality Assurance Plan Section F and specifications 7 days Traffic Control Plan Use of Roads by Contractor clause 7 days
Safety Plan, including Blasting Plan where applicable
Accident Prevention clause
(FAR 52.236-13)
N/A
Engineered Spill Prevention Plan
Landscape Preservation and Hazardous Materials clause
2 days
Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 N/A
Designation of Superintendence By The N/A
Representative
R6-FS-6300-6
Contractor (FAR 52.236-6)
Drug Free Workplace Policy Drug-Free Workplace
(FAR 52.223-6)
N/A
Progress Schedule Section F N/A
H.14 SALVAGE RIGHTS
Culvert replacement under specification SPS833F1 allows for removed culverts to become property of the contractor. Sign maintenance under specification SPS872F1 allows for sign post, signs replaced and applicable hardware to become property of the contractor. No other Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
H.15 MATERIAL SOURCES
Rock and mineral soil excavated within the normal excavation shall be conserved and used as needed.
Borrow sources are identified on the plans or elsewhere herein if made available by the Government. If alternate borrow sources are needed, they must be approved in advance by the COR. Such borrow sources shall be restored to a natural appearance. Materials acquired from commercial sources shall conform to government specifications and be from acceptable certified weed free commercial sources.
H.16 FURNISHING OF MATERIALS
Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall verify the kind and amount of work that may be necessary in furnishing the material.
H.17 STORAGE OF MATERIALS AND EQUIPMENT
Materials shall be stored to assure the preservation of their quality and fitness for work.
Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
H.18 LEGAL RELATIONS AND RESPONSIBILITIES
Government's Responsibility for Utilities
1. The Government will identify the roads in the Road Listing of, known locations of underground installations other than culverts and drains the Contractor could encounter in the progress of work under the contract; electric, telephone cables, water supply pipes, and induction loops within the road right of way.
Contractor's Responsibility for Utilities
1. The Contractor will notify Washington UULC 1-800-424-5555 and the utility companies and request utilities be marked on the ground prior to excavation.
2. The Contractor will notify all utility companies or other parties affected and make arrangements for all necessary adjustments of the public or private utility fixtures, pipelines, and other appurtenances affected by work under the contract.
In the event of interruption to utility services because of accidental breakage the Contractor shall promptly notify the utility authority and shall cooperate with that authority in the restoration of service. If damage occurs to the utilities the Contractor will be liable for damage to underground utilities.
H.19 ARCHAEOLOGICAL OR HISTORICAL SITES (AGAR 452.236-73) (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (SEP 2006) 52.215-8 Order of Precedence--Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) 52.222-3 Convict Labor (JUN 2003) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) 52.222-41 Service Contract Act of 1965, as Amended (JUL 2005) 52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-6 Drug-Free Workplace (MAY 2001) 52.232-1 Payments (APR 84) 52.232-8 Discounts for Prompt Payment (FEB 2002) 52.232-11 Extras (APR 1984) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986) 52.232-25 Prompt Payment (OCT 2003) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration
(OCT 2003)
52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR
1984) 52.243-1 Changes--Fixed-Price (AUG 1987)--Alternate I (APR 1984) 52.244-6 Subcontracts for Commercial Items (MAR 2007) 52.245-1 Property Records (APR 1984) 52.245-4 Government-Furnished Property (Short Form) (JUN 2003) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short
From) (APR 1984) 52.249-8 Default (Fixed-Price Supply and Service) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.237-70 Loss, Damage, Destruction or Repair (FEB 1988)
452.237-75 Restrictions Against Disclosure (FEB 1988)
I.2 52.204-7 CENTRAL CONTRACTOR REGISTRATION (JUL 2006)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern.
(D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same parent concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705- 5711 or via the Internet at http://www.dnb.com; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961- 5757.
I.3 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It Is Not A Wage Determination.
Employee Class Monetary Wage--Fringe Benefits
WG-4 $17.92 plus fringes WG-2 $15.43 plus fringes
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
District(s) Location Map
Road Listing samples
Specification List
Specifications/Drawings
Fire Protection and Suppression Requirements
Wage Rates
Road Listing
The following is a list of primary roads that will be maintained with this contract. Not included in this list are the roads that have a Objective Maintenance level lower than 3. For a complete list of roads contact Ron Hausinger at rhausinger@fs.fed.us. Maintenance on roads not shown will primarily be opening and drainage, as funding allows. The objective of this contract is to provide appropriate maintenance of the Forest roads, with the following priority for maintenance 1st: user safety, 2nd: resource protection and 3rd: user comfort.
SNOQUALMIE RANGER DISTRICT – ENUMCLAW AREA ROADS
ID NAME BEGIN_TERMINI END_TERMINI BMP EMP OPER
ML
OBJ
ML
SURFAC
E TYPE LANES
7000000 GREENWATER HWY 410 END IN SEC 34 0.00 4.57 5 5 AC 2
7000000 GREENWATER HWY 410 END IN SEC 34 4.57 9.51 5 5 AC 2
7000000 GREENWATER HWY 410 END IN SEC 34 9.51 10.32 5 5 AC 2
7155010
MOSS LAKE
NATURE TRAIL RD 7155000 RD 7155000 0.00 0.09 5 5 AC 1
7400000
WEST
FORK/MARTIN
GAP HWY 410
SEC 14 MARTIN
GAP 0.60 2.90 5 5 AC 2
7400000
WEST
FORK/MARTIN
GAP HWY 410
SEC 14 MARTIN
GAP 2.90 4.06 5 5 AC 2
7400000
WEST
FORK/MARTIN
GAP HWY 410
SEC 14 MARTIN
GAP 4.06 6.86 5 5 AC 2
7033000
GREENWATER
LAKES TRAIL RD 7000000 0.00 0.20 4 4 AC 1
7148000
DALLES
CAMPGROUND HWY 410 SEC 08 0.00 0.80 4 4 BST 1
7180000
SILVER SPRINGS
CAMPGROUND HYW 410 HWY 410 0.00 1.21 4 4 BST 1
7400000
WEST
FORK/MARTIN
GAP HWY 410
SEC 14 MARTIN
GAP 6.86 7.61 4 4 AC 1
7000000 GREENWATER HWY 410 END IN SEC 34 10.32 11.86 3 5 AGG 1
7000000…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .