About this file
Amendment 1--Replaces Schedule of Items (pages 2-4).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A12 WD 05-2569.pdf | ||
| A10 WD 05-2565.pdf | ||
| A08 WD 05-2561.pdf | ||
| A04 Fire Protection and Suppression.pdf | ||
| R6-18-09-213050 Complete Solicitation.pdf | ||
| A07 WD 05-2559.pdf | ||
| A09 WD 05-2563.pdf | ||
| A05 WD 05-2439.pdf | ||
| R6-18-09-213050 Package to Return.pdf | ||
| A11 WD 05-2567.pdf | ||
| A03 Driller's Daily Diary and Log.pdf | ||
| A06 WD 05-2441.pdf | ||
| A02 Project Example.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ R6-18-09-213050
AMENDMENT 1
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
1 10/23/2008 213050
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
WILLAMETTE NATIONAL FOREST
ATTN: CONTRACTING
211 E 7
TH
AVE, ROOM 321
EUGENE OR 97401
541-225-6300
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
R6-18-09-213050
9B. DATED (SEE ITEM 11)
10/20/2008
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
The purpose of this amendment is to replace the Schedule of Items. The new Schedule of Items is attached to this amendment (pages 2-4) replaces the Schedule of Items (pages 2-4) in the Solicitation posted 20 Oct 2008.
THIS AMENDMENT CONSTITUTUES FULL ACCORD AND SATISFACTION FOR THE ITEMS DESCRIBED HEREIN.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Laurie Abernathy, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NA NA
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
EST.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
GEOTECHNICAL DRILLING SERVICE
(Base Year: )
1.1 Soil Drilling (Auger) 5000 FT $_______ $________
1.2 Rock Drilling (Core) 1500 FT $_______ $________
1.3 Casing 300 FT $_______ $________
1.4 SPT'S (Tests) 2500 EA $_______ $________
1.5 1 in. PVC Observation Well Installed 1000 FT $_______ $________
1.6 1.9 in. O.D. Inclinometer Casing Installed 200 FT $_______ $________
1.7 2.75 in. O.D. Inclinometer Casing Installed 200 FT $_______ $________
1.8 Mobilization ** 12,000 MI $_______ $________
1.9 Interim Mobilization (On Site) 100 EA $_______ $________
1.10 Standby 40 HR $_______ $________
1.11 Cardboard Core Boxes 600 EA $ ______ $________
1.12 Shelby Tubes 20 EA $ _______ $________
1.13 Constant or Falling Head Test 40 HR $ ______ $________
1.14 Packer Test 40 HR $_______ $________
1.15 Metal Protective Vault 12 EA $_______ $________
1.16 Monitoring Well Installation 50 FT $ _______ $________
1.16(a) Oregon Start Card Fee 1 EA $ _______ $ _______
1.16(b) Washington Notice of Intent Fee 1 EA $ _______ $ _______
1.17 Monitoring Well Abandonment 50 FT $ _______ $________
BASE YEAR TOTAL AMOUNT
** Specify location Mobilizing from:
DUNS NUMBER
TIN NUMBER
ITEM
NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
EST.
QUAN
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
GEOTECHNICAL DRILLING SERVICE
(Option Year 1: )
OPTION YEAR 1 TOTAL AMOUNT
ITEM
NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
EST.
QUAN
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
GEOTECHNICAL DRILLING SERVICE
(Option Year 2: )
OPTION YEAR 2 TOTAL AMOUNT