Complete Solicitation document

View the file

Other files

File Type Posted
SF 30 Amendment 1.pdf PDF
A12 WD 05-2569.pdf PDF
A10 WD 05-2565.pdf PDF
A08 WD 05-2561.pdf PDF
A04 Fire Protection and Suppression.pdf PDF
A07 WD 05-2559.pdf PDF
A09 WD 05-2563.pdf PDF
A05 WD 05-2439.pdf PDF
R6-18-09-213050 Package to Return.pdf PDF
A11 WD 05-2567.pdf PDF
A03 Driller's Daily Diary and Log.pdf PDF
A06 WD 05-2441.pdf PDF
A02 Project Example.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ R6-18-09-213050

SOLICITATION/CONTRACT/ORDER AL ITEMS 1. REQUISITION NUMBER PAGE 1 OF

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 213050

2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE

DATE

R6-18-09-213050

DATE

10-20-08

a. NAME b. TELEPHONE NUMBER(No collect

8. OFFER DESIRED DUE DATE/

7. FOR SOLICITATION Contracting Officer calls) 541-225-6300 LOCAL TIME

INFORMATION CALL: 11-03-2008 4:30 PM PT

9. ISSUED BY CODE 10. THIS ACQUISITON IS

WILLAMETTE NATIONAL FOREST UNRESTRICTED OR SET ASIDE: % FOR

ATTN: CONTRACTING SMALL BUSINESS EMERGING SMALL

BUSINESS

211 E 7

TH

AVE. ROOM 321

EUGENE OR 97401

HUBZONE SMALL

NAICS: 213115 BUSINESS

SERVICE-DISABLED VETERAN- 8(A)

SIZE STANDARD: $6.0 mil OWNED SMALL BUSINESS

13b. RATING 11. DELIVERY FOR FOB

DESTINATION UNLESS BLOCK

IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER DPAS

(15 CFR 700) 14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

16. ADMINISTERED BY CODE

Same as block 9

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE N0.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

OFFER IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

GEOTECHNICAL DRILLING SERVICE

U.S. Forest Service

Bureau of Land Management Oregon and Washington

Facsimile quotes may be submitted to 541-225-6220

(Use Reverse and/or Attach Additional Sheets as Necessary)

See Schedule of Items

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE

ATTACHED. ADDENDA

ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.2124. FAR 52.212-5 IS

ATTACHED. ADDENDA

ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON

ANY

DATED .. YOUR OFFER ON SOLICITATION

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.3/2005)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

CONTINUATION OF SF1449

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

EST.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Base Year: )

1.1 Soil Drilling (Auger) 5000 FT $_______ $________

1.2 Rock Drilling (Core) 1500 FT $_______ $________

1.3 Casing 300 FT $_______ $________

1.4 SPT'S (Tests) 2500 EA $_______ $________

1.5 1 in. PVC Observation Well Installed 1000 FT $_______ $________

1.6 1.9 in. O.D. Inclinometer Casing Installed 200 FT $_______ $________

1.7 2.75 in. O.D. Inclinometer Casing Installed 200 FT $_______ $________

1.8 Mobilization ** 12,000 MI $_______ $________

1.9 Interim Mobilization (On Site) 100 EA $_______ $________

1.10 Standby 40 HR $_______ $________

1.11 Cardboard Core Boxes 600 EA $ ______ $________

1.12 Shelby Tubes 20 EA $ _______ $________

1.13 Constant or Falling Head Test 40 HR $ ______ $________

1.14 Packer Test 40 HR $_______ $________

1.15 Metal Protective Vault 12 EA $_______ $________

1.16 Monitoring Well Installation 50 FT $ _______ $________

1.17 Monitoring Well Abandonment 50 FT $ _______ $________

BASE YEAR TOTAL AMOUNT

** Specify location Mobilizing from:

DUNS NUMBER

TIN NUMBER

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

EST.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Option Year 1: )

OPTION YEAR 1 TOTAL AMOUNT

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

EST.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Option Year 2: )

OPTION YEAR 2 TOTAL AMOUNT

Geotechnical Drilling Services

For technical questions, contact Mark Leverton at (541) 782-5343.

Quoter must respond to the other factors as described under FAR 52.212-2 Evaluation – Commercial Items (Jan 1999). Award will be made on the best value for the Government.

Quotations shall be submitted for the total item. Quotations for less than the total item will not be considered.

The estimated time work will start is November 17, 2008. The Government anticipates awarding four Task Orders at the time of award. The start work date and performance time will be identified on each task order. Contract time may run continously with no time discounted for weather or fire restrictions.

This is a REQUIREMENTS contract. Quantities shown on the Schedule for Base Year and Option Years 1 and 2 are estimated quantities.

Ordering officials for this contract are Contracting Officers on the Willamette National Forest (Eugene, OR), Siuslaw National Forest (Corvallis, OR), Umpqua National Forest (Roseburg, OR), or the Rogue-Siskiyou National Forest (Medford, OR) and the Contracting Officers Representative (COR).

The authority of the COR is $2,500.00 for any single order. (FAR 52.216-19)

Telephonic orders are authorized, to be followed by a written order as described in FAR 52.216-18 Ordering.

REFER TO CLAUSES 52.216-18 ORDERING AND 52.216-19 ORDER LIMITATIONS

Attachment 2 includes a Sample Task Order, which is provided as an illustration. Task Orders may also be issued in other formats, e.g., purchase orders.

The total value of the entire contract will not exceed: $700,000.

This is an Option Year contract. The Government may exercise its rights and renew the contract for two additional one-year periods: as described on FAR 52.217-9.

Base Year: From date of award through October 31, 2009 Option Year 1: November 1, 2009 through October 31, 2010 Option Year 2: November 1, 2010 through October 31, 2011

No award will be made to a Contractor not registered in the Central Contractor Registration (CCR) database.

Contractors should provide Representation and Certifications electronically at the ORCA website, http://orca.bpn.gov.

Contractors must file a VETS-100 Report at the VETS-100 website, www.vets100.com.

Continuation of SF1449 Block 27: The full text of a clause or provision may be accessed electronically at www.arnet.gov/far/

CONTRACT CLAUSES

ADDENDUM TO FAR 52.212-4

52.236-7 Permits and Responsibilities (NOV 1991) 52.242-14 Suspension of Work (APR 1984)

1) POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at the Headquarters of the Willamette National Forest, 211 E 7th Ave, Eugene, OR or at the District office.

(End of clause)

2) DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer designates the Contracting Officer's Representative (COR).

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits.

Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

3) Key Personnel

Key personnel are those personnel (Drill Operators, Drill Helpers, etc.) considered essential for successful completion of this contract. All key personnel shall be identified in the Contractor’s Technical Proposal showing their licensing, skill level and years of experience.

The Contractor agrees that assigned key personnel shall not be removed, substituted, or reassigned to another task order without the written concurrence of the Contracting Officer. The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed personnel change and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. If the Contracting Officer determines that suitable replacement of key personnel is not feasible or that the reduction of effort would be so substantial as to impair the successful performance of the work, the Contractor may be subject to default action under the affected task order(s) or the contract. Ultimate approval/disapproval to replace key personnel is the responsibility of the Contracting Officer.

(End of Clause)

4) SUPERINTENDENCE BY THE CONTRACTOR (FAR 52.236-6) (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

5) CONTRACTOR'S REPRESENTATIVE

The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and

(2) able to read and understand the contract.

6) NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The notification shall include as a minimum:

1. The name, address, and telephone number of the subcontractor.

2. The date upon which the subcontract was entered into and its duration.

3. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

7) COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than times listed on each Task Order. The time stated for completion shall include final cleanup of the premises.

8) SCHEDULES FOR SERVICE CONTRACTS

The Contractor shall within 5 days from receipt of a request from the Contracting Officer, submit a time chart of schedule of proposed progress to insure completion of the work within the time set forth in the Task Order. If the Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve his progress; in addition the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the Task Order.

9) PROSECUTION OF WORK

(a) Work shall be scheduled to provide completion of individual segments on a daily basis unless otherwise herein provided. Refer to Task Orders for seasonal restrictions.

(b) A Work Schedule shall be prepared by the Contractor based on priorities provided in the contract unless superseded by the Contracting Officer in advance of work.

(c) The Contracting Officer may require the Contractor to finish the portion in progress before additional work is started on any additional portion.

(d) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.

(e) The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner.

10) CONTRACTOR QUALITY CONTROL PLAN

A. Quality Control Plan

The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal.

The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:

- How quality will be monitored to ensure performance standards are met.

- How the work will be supervised.

- How results of the monitoring will result in quality performance and customer satisfaction

- Identify the personnel responsible for performing quality control.

B. Contractor Quality Control Inspection

The Contractor shall assure themselves that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions -- Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. Upon completion of a work, the Contractor shall contact the Contracting Officer. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.

11) GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

(a) The Government will perform sampling and testing of work in progress. Inspections will be made periodically as work progresses or as work is completed to determine acceptability of method and manner of performance, the end product of the maintenance operations, and to make measurements for payment. All materials and equipment specified in this contract to be used in the work will be inspected and approved by the COR before drilling commences.

(b) Standards for acceptable performance are stated in the specifications, Section 5 of the contract.

12) SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242- 14, Suspension of Work, and shall not qualify for an equitable adjustment.

13) USE OF PREMISES

A. The Contractor shall comply with the regulations governing the operation of premises that are occupied and shall perform the contract in such a manner as not to interrupt or interfere with the conduct of Government business.

B. Before any camp (quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings) is opened or operated on National Forest land or lands administered by the Forest Service or Bureau of Land Management, the Contractor shall obtain permission (in writing) from the Contracting Officer Representative. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a camping permit will be issued.

C. It is further stipulated that in addition to clean up of any campsites, the Contractor shall remove its equipment from public land before final acceptance and payment of the project.

14) ARCHAEOLOGICAL OR HISTORIC SITES (AGAR 452.236-73)(FEB 1988)

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

15) LANDSCAPE PRESERVATION

The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements:

a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or natural features unless specifically authorized by the Government.

Unless otherwise provided, the Contractor shall confine contract operations to within the areas designated in contract documents. Unless otherwise provided in this contract, the Contractor shall gather rock, which falls outside the roadway due to contract operations and dispose of it as directed, by the Government.

b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumen, dust palliatives, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government. If a petroleum spill should take place in the water, the Contractor shall immediately notify the COR and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124.

16) SITE PROTECTION

a. Drill Fluids - Contractor shall prevent drill fluids and cuttings from entering any water way at any time during drilling operations. Any additive to the drill water shall be biodegradable. The Contractor shall provide certification for such biodegradability and shall have Material Safety Data Sheets (MSDS) for all drilling fluids available on the job site.

b. Fuels, Lubricants, and Hydraulic Fluids - Contractor shall take all reasonable precautions to prevent fuel, lubricant, and/or hydraulic fluid leaks from all equipment on site. Contractor shall be prepared to immediately clean up spill or leaks of any such materials and to prevent those materials from entering any streams or water courses. The Contractor shall insure that absorbent wipes are available and spill containment boom is deployed when working adjacent to streams. An oil dispersion medium shall be on-site for use in the event of a spill.

c. Hazardous Materials - The Contractor shall notify the COR of any hazardous materials to be used on the job and will have Material Safety Data Sheets (MSDS) for those materials available on the job.

If the Contractor maintains storage facilities for oil or oil products in the Project Area, the Contractor shall take appropriate preventive measures to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the regulations set by the state and local Fire Marshall.

If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. The Contractor under the direction of the COR, or in absence the COR, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products or other hazardous substance spills on/or in the vicinity of the project which are caused by the Contractor's employees, directly or indirectly, as a result of operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and cleanup of petroleum products spills caused by Contractor's employees or resulting from construction operations.

Pollutants such as motor fuels, coolants, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged on or into land or into rivers, streams, and impoundments, or into naturals or man made channels leading thereto. The Contractor shall properly dispose of vehicle oil filters, drained of free-flowing oil, and oily rags as a hazardous waste.

d. The use of glass bottles and jugs in the Contractor's operations is prohibited.

e. Noxious Weeds – Contractor shall take reasonable precautions to prevent the spread of noxious weeds. These precautions can include, but are not limited to ensuring that all off-road equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds upon entering Federal lands. The Contractor will be made aware of local policies by the COR, which may require special precautions and practices specific to the area.

17) THREATENED, ENDANGERED, AND SENSITIVE SPECIES

Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to the Suspension of Work clause, FAR 52.242-14.

18) PROPERTY AND PERSONAL DAMAGE

(a) The Contractor shall use every precaution necessary to prevent damage to public and private property. Land monuments and property markers shall not be disturbed until the Contracting Officer, or his/her representative, has witnessed or otherwise referenced their location and directed their removal.

(b) The Contractor shall be responsible for all damage to property and to persons, including third parties, that occur as a result of his/her agent's or employee's fault or negligence. The term "third parties" is construed to include employees of the government.

19) PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or with the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

20) TRASH AND REFUSE MATERIAL

Contractor shall remove all of his/her own trash and refuse from the contract area. Material to be removed includes, but is not limited to: used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper garbage, etc. All placement of sanitary facilities will require prior approval of the Contracting Officer.

21) STORAGE OF MATERIALS AND EQUIPMENT

Materials shall be stored to assure the preservation of their quality and fitness for work.

Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

22) POTENTIAL SAFETY HAZARDS

(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ ] Confined space entry.

[X] Temporary excavation/deep trenching/slope stability.

[X] Tree falling.

[X] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[X] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[X] Heavy equipment operation.

[X] Tree climbing and/or tower climbing.

[X] Fire hazards.

[X] Hazardous materials handling.

[X] Electrical hazard.

[X] Hydraulic and/or pneumatic and/or other high pressure hazards.

[X] Mechanical hazards such as pulleys, springs, etc.

[X] Other: Uneven ground conditions.

(End of clause)

23) 452.216-73 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)

During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of N/A, but not in excess of $700,000.00

(End of clause)

24) ORDERING PROCEDURES

The Government will place a call to the Contractor giving notice of intent to issue the Task Order.

Within 48 hours of this call, a meeting or conference call should be held to discuss particulars of the required work.

Purpose of the meeting is to reach agreement on the number of days of work and type of personnel involved. Pricing will be based on rates shown in the Schedule.

Regular Work: The agreement on the Task Order requirements will be confirmed in writing and furnished to the Contractor. Contractor shall be able to start work within 10 calendar days of the meeting.

Urgent Work: When agreement is reached at the meeting, the Contracting Officer may issue verbal Notice to Proceed with the Task Order followed up in writing. The Contractor shall be able to start work within 5 calendar days of the meeting. Any increased cost due to the accelerated Task Order will be discussed and agreed to at the meeting in accordance with the Changes clause.

25) 52.216-18 ORDERING (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from:

Base Year: Date of contract award through September 15, 2009 Option Year 1: Through September 15, 2010 Option Year 2: Through September 15, 2011

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, or by facsimile, or by electronic commerce methods only if authorized in the Schedule.

26) 52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order in excess of $75,000.00 ;

(2) A series of orders from the same ordering office within 365 days that together call for quantities exceeding $200,000.00.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraph (b) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to perform the item called for and the reasons. Upon receiving this notice, the Government may acquire the services from another source.

27) 52.216-21 REQUIREMENTS (Oct 1995)

(a) This is a requirements contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after December 31, 2011, unless otherwise mutually agreed upon.

28) 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within the time specified in the Schedule; provided, that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed three years.

29) ECONOMIC PRICE ADJUSTMENT – FUEL COSTS

This clause is included to protect the Contractor and the Government against significant fluctuations in Sub-item 1.8, Mobilization, which are specific to actual fuel costs. All other adjustments of price for options years shall be included in the quote for each Sub Item.

The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased fuel costs

The Contractor shall notify the Contracting Officer within 30 days after notice of the government’s modification (SF 30) to exercise an option year, or within any additional period that the Contracting Officer may approve in writing, if the cost for fuel has increased by a minimum $0.20 per gallon. The Contractor shall promptly notify the Contracting Officer of any decrease under this clause, but nothing in the clause shall preclude the Government from asserting a claim within the period permitted by law.

The notice shall include the Contractor’s proposal for the increase or decrease, the effective date of the change, fuel receipts pertaining to the change and an itemized accounting of fuel usage as it applies to sub-item 1.8, Mobilization.

The Contracting Officer or an authorized representative shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor until the expiration of 3 years after final payment under the contract.

(End of Clause)

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -

- Commercial Items (Jun 2008)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(2) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108- 78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer shall check as appropriate.]

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sep 2006), with Alternate I (Oct 1995)(41 U.S.C. 253g and 10 U.S.C. 2402).

___ (2) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999)(15 U.S.C. 657a).

___ (3) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jul 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

___ (4) [Reserved]

X (5)(i) 52.219-6, Notice of Total Small Business Aside (June 2003) (15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-6.

___ (iii) Alternate II (Mar 2004) of 52.219-6.

___ (6) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003)(15 U.S.C. 644).

___ (ii) Alternate I (Oct 1995) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

X (7) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).

___ (8) (i) 52.219-9, Small Business Subcontracting Plan (Apr 2008)(15 U.S.C. 637 (d)(4).)

___ (ii) Alternate I (Oct 2001) of 52.219-9.

___ (iii) Alternate II (Oct 2001) of 52.219-9.

X (9) 52.219-14, Limitations on Subcontracting (Dec 1996)(15 U.S.C. 637(a)(14)).

___ (10) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999)(15 U.S.C.

637(d)(4)(F)(i)).

___ (11) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Sep 2005)(10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

___ (ii) Alternate I (June 2003) of 52.219-23.

___ (12) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Apr 2008)(Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (13) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000)(Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (14) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set- Aside (May 2004) (15 U.S.C. 657 f).

X (15) 52.219-28, Post Award Small Business Program Rerepresentation (June 2007) (15 U.S.C. 632(a)(2)).

X (16) 52.222-3, Convict Labor (June 2003)(E.O. 11755).

___ (17) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2008) (E.O. 13126).

X (18) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

X (19) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

X (20) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

X (21) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998)(29 U.S.C.

793).

X (22) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

___ (23) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).

X (24) (i) 52.222-50, Combating Trafficking in Persons (Aug 2007) (Applies to all contracts).

___ (ii) Alternate I (Aug 2007) of 52.222-50.

___ (25) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (May 2008)(42 U.S.C. 6962(c)(3)(A)(ii)).

___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)).

___ (26) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C.

8259b).

___ (27) (i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).

___ (ii) Alternate I (Dec 2007) of 52.223-16.

X (28) 52.225-1, Buy American Act--Supplies (June 2003)(41 U.S.C. 10a-10d).

X (29) (i) 52.225-3, Buy American Act –Free Trade Agreements – Israeli Trade Act (Aug 2007) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, Pub. L. 108-77, 108- 78, 108-286, and 109-169).

__ (ii) Alternate I (Jan 2004) of 52.225-3.

___ (iii) Alternate II (Jan 2004) of 52.225-3.

___ (30) 52.225-5, Trade Agreements (Nov 2007) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (31) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

___ (32) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C.

5150).

___ (33) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

___ (34) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

___ (35) 52.232.30, Installment Payments for Commercial Items (Oct 1995)(41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

X (36) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct. 2003)(31 U.S.C. 3332).

___ (37) 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration (May 1999)(31 U.S.C. 3332).

___ (38) 52.232-36, Payment by Third Party (May 1999)(31 U.S.C. 3332).

___ (39) 52.239-1, Privacy or Security Safeguards (Aug 1996)(5 U.S.C. 552a).

___ (40) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006)(46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).

___ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

X (1) 52.222-41, Service Contract Act of 1965 (Nov 2007)(41 U.S.C. 351, et seq.).

X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989)(29 U.S.C.

206 and 41 U.S.C. 351, et seq.).

X (3) 52.222-43, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Multiple Year and Option Contracts) (Nov 2006)(29 U.S.C.206 and 41 U.S.C. 351, et seq.).

___ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act -- Price Adjustment (Feb 2002)(29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

___ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

___ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

___ (7) 52.237-11, Accepting and Dispensing of $1 Coin (Aug 2007)(31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vii) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--

(i) 52.219-8, Utilization of Small Business Concerns (May 2004)(15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(ii) 52.222-26, Equal Opportunity (Mar 2007)(E.O. 11246).

(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)(38 U.S.C. 4212).

(iv) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998)(29 U.S.C.

793).

(v) 52.222-39, Notification of Employee rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).

(vi) 52.222-41, Service Contract Act of 1965, (Nov 2007), flow down required for all subcontracts subject to the Service Contract Act of 1965 (41 U.S.C. 351, et seq.)

(vii) 52.222-50, Combating Trafficking in Persons (Aug 2007) (22 U.S.C. 7104(g)). Flow down required in accordance with paragraph (f) of FAR clause 52.222-50.

(viii) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)

(ix) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (Nov 2007) (41 U.S.C. 351, et seq.)

(x) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of Clause)

52.204-7 Central Contractor Registration (Apr 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern.

(D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database.