U.S. Department of the Interior Bureau of Reclamation

August 2017

Fire Break Clearing and Fencing Fort Cobb Reservoir Washita Basin Project, Oklahoma

This is an Invitation For Bid (IFB)

Solicitation Number: R17PS01176

It is advertised as Total Small Business Set Aside

U.S. Department of the Interior Bureau of Reclamation

August 2017

This page intentionally left blank.

Fire Break Clearing and Fencing Fort Cobb Reservoir

Washita Basin Project, Oklahoma Solicitation Number R17PS01176

FORWARD

Work is located at Fort Cobb Reservoir located approximately four miles north of Fort Cobb, Oklahoma on S.H. 146 in Caddo County.

Principle components of work include: (1) Surveying; (2) Demolition of existing fencing; (3) Mechanically clearing firebreak; (4) Hand clearing 5-foot for fencing where mechanical clearing is not authorized; (5) Constructing new 5-strand barbed wire fence and gates; (6) Constructing steel corner posts and H-braces; (7) Constructing steel post and cable fencing; (8) Placing aggregate for parking; (9) Constructing pipe rail fencing.

TYPE OF CONTRACT:

This requirement is solicited as a “Invitation For Bid (IFB) using the Federal Acquisition Regulation Sub Part 14, Sealed Bidding Procedures. Results from this solicitation will be an anticipated award of a Firm Fixed Price contract.

MAGNITUDE OF PROJECT:

$250,000 - $500,000

METHOD OF SUBMISSION OF BIDS:

See Section L of this Solicitation

BUSINESS SIZE COMPETITION REQUIREMENTS:

This acquisition is solicited total small business set aside.

NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM:

238990 – All Other Specialty Trade Contractors (Fencing)

A PRE-BID SITE VISIT: A pre-bid site visit has been scheduled for August 10, 2017 at 9:00 am local time. Interested contractors shall make arrangements for attending the site visit by contacting Mr. Cody McCracken via e-mail at cmccrackin@usbr.gov. See paragraph L.16 – SITE VISIT for information on the site visit. Note: All questions during the site visit will be submitted in writing to the Contract Officer via email. Attendees are to provide and wear safety boots, hard hats and safety vests.

NOTICE TO PROCEED: For planning purposes, the anticipated Notice to Proceed date will be on or about September 11, 2017.

Forward

BID OPENING DATE:

See Section “A”: "SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442” immediately following the “TABLE OF CONTENTS”.

POINT OF CONTACT:

The point of contract is the Contract Officer, Mr. Paris Everson. All questions and correspondence concerning this solicitation will be directed to him via email at peverson@usbr.gov. Phone calls will not be accepted to ensure all communication will be properly documented for record purposes.

RECLAMATION SAFETY AND HEALTH STANDARDS (2009 EDITION):

For information regarding Bureau of Reclamation's publication "RECLAMATION SAFETY AND HEALTH STANDARDS" (2009Edition at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause at "WBR 1452.223-81 SAFETY AND HEALTH."

SYSTEM FOR AWARD MANAGEMENT (SAM):

Effective July 29, 2012 all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database prior to an award or agreement. Note: Registering in “SAM” does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).

Additionally, the contractors “DUNS and BRADSTREET” and banking information are required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.

INVOICE PROCESSING PLATFORM (IPP):

Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of Treasury’s “Invoice Processing Platform” (IPP) System via the IPP website at https://www.ipp.gov. Contractors are required to use the IPP website to access and use IPP for submitting request for payment. Registration assistance can be obtained by contacting the “IPP Production Helpdesk” via email ippgroup@bos.fbr.org or phone 1-866-973- 3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor can submit a waiver request in writing to the Contractor Officer with its proposal. Note: Waivers will be on a case by case basis and not automatically granted as determined by the Contract Officer.

END OF FORWARD

Forward

Fort Cobb Reservoir Washita Basin Project, Oklahoma Solicitation No. 17PS001176

Table of Contents

00 01 10 - 1

TABLE OF CONTENTS

PART I

SECTION A SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442

SECTION B PRICE SCHEDULE

SECTION C DESCRIPTION / SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 12 Work Restrictions 01 31 19 Project Management and Coordination 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Demolition of Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 60 Protected Species 01 60 00 Product Requirements 01 71 20 Surveying

DIVISION 02 - DEMOLITION

02 22 00 Demolition

DIVISION 31 - EARTHWORK

31 11 00 Clearing

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 15 10 Gravel and Aggregate Surfacing 32 31 30 Fencing and Gates

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 01 71 United States Boundary Information

DIVISION 52 - DRAWINGS

52 00 00 Drawings

00 01 10 - 2

SECTION D – Not used

SECTION E -- INSPECTION AND ACCEPTANCE

E.1 52.236-05 Material and Workmanship E.2 52.246-12 Inspection of Construction

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 Commencement, Prosecution, and Completion Of Work F.2 52.211-18 Variation in Estimated Quantity F.3 52.242-14 Suspension of Work

SECTION G -- CONTRACT ADMINISTRATION DATA

G.1 1452.201-70 Authorities and Delegations G.2 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)

SECTION H -- SPECIAL PURCHASE ORDER REQUIREMENTS

H.1 GP-7 Site Security

PART II

SECTION I – CONTRACT CLAUSES

I.1 52.252-02 Clauses Incorporated by Reference I.2 52.230-19 Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements (Deviation) I.3 52.204-18 Commercial and Government Entity Code Maintenance I.4 52.214-29 Order of Precedence -- Sealed Bidding I.5 52.222-55 Minimum Wages under Executive Order 13658 I.6 52.223-09 Estimate of Percentage of Recovered Material Content for EPA Designated Items I.7 52.225-09 Buy American–Construction Materials I.8 52.228-01 Bid Guarantee

1.9 52.228-02 Additional Bond Security I.10 52.228-15 Performance and Payment Bonds – Construction I.11 52.232-05 Payments under Fixed-Price Construction Contracts I.12 52.232-27 Prompt Payment for Construction Contracts I.13 52.236-02 Differing Site Conditions I.14 52.236-13 Accident Prevention I.15 52.236-15 Schedules for Construction Contracts I.16 52.236-21 Specifications and Drawings for Construction I.17 52.243-04 Changes I.18 52.252-06 Authorized Deviations in Clauses I.19 1452.203-70 Restriction on Endorsements--Department of the

Interior I.20 1452.204-70 Release of Claims--Department of the Interior I.21 1452.228-70 Liability Insurance -- Department of the Interior I.22 WBR 1452.222-81 Employment Verification I.23 WBR 1452.223-80 Asbestos Free Warranty

00 01 10 - 3

I.24 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I.25 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace –

Bureau of Reclamation I.26 WBR 1452.228-84 Certification of Representatives for Corporate Sureties –

Bureau of Reclamation I.27 WBR 1452.231-81 Equipment Ownership and Operating Expense –

Bureau of Reclamation I.28 WBR 1452.232-81 Payment for Mobilization and Preparatory Work I.29 WBR 1452.233-81 Claims Accounting -- Bureau of Reclamation I.30 WBR 1452.236-08 Other Contracts I.31 WBR 1452.236-84 Preservation of Cultural Resources--Bureau of Reclamation I.32 WBR 1452.237-80 Security Requirements – Bureau of Reclamation – Alternate III I.33 WBR 1452.243-80 Modification Proposals - Alternate III – Bureau of Reclamation

ALT III

PART III

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENT NUMBER 0001 Department of Labor General Decision ATTACHMENT NUMBER 0002 Standard Form 24 – Bid Bond ATTACHMENT NUMBER 0003 Department of Interior FAR 52.219-14, Limitations of Subcontracting Percentage Worksheet

PART IV

SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

K.1 52.204-08 Annual Representations and Certifications K.2 52.209-07 Information Regarding Responsibility Matters

SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

L.1 52.204-07 System for Award Management (SAM) L.2 52.204-16 Commercial and Government Entity Code Reporting L.3 52.204-22 Alternative Line Item Proposal L.4 52.211-01 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR

Part 101-29 L.5 52.211-02 Availability of Specifications Standards and Date Item Descriptions

Listed in the Acquisition Streamlining and Standardizing Information (Assist)

L.6 52.214-03 Amendments to Invitations for Bids L.7 52.214-04 False Statements in Bids L.8 52.214-05 Submission of Bids L.9 52.214-06 Explanation to Prospective Bidders L.10 52.214-07 Late Submissions, Modifications, and

Withdrawals of Bids L.11 52.214-18 Preparation of Bids – Construction

00 01 10 - 4

L.12 52.214-34 Submission of Offers in the English Language L.13 52.214-35 Submission of Offers in U.S. Currency L.14 52.216-01 Type of Contract L.15 52.222-05 Construction Wage Rate Requirements –

Secondary Site of the Work L.16 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction L.17 52.222.58 Subcontractor Responsibility Matters Regarding Compliance with Labor

Laws (Executive Order 13673) L.18 52.225-10 Notice of Buy American Requirement--Construction Materials L.19 52.236-27 ALT I Site Visit (Construction) – Alternate I L.20 52.252-05 Authorized Deviations in Provisions L.21 1452.233-02 Service of Protest -- Department of the Interior L.22 WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule

Line Item

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 52.214-19 Contract Award -- Sealed Bidding – Construction M.2 WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations--Bureau of Reclamation

END OF SECTION

Fort Cobb Reservoir Washita Basin Project, Oklahoma R17PS01176

PART I

SECTION A: SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442

SECTION B: PRICE SCHEDULE

SECTION C: DESCRIPTION / SPECIFICATIONS

SECTION D: NOT USED

SECTION E: INSPECTION AND ACCEPTANCE

SECTION F: DELIVERIES AND PERFORMANCE

SECTION G: CONTRACT ADMINISTRATION DATA

SECTION H: SPECIAL CONTRACT REQUIRMENTS

This page intentionally left blank

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040329418

Bureau of Reclamation

Great Plains Region

GP-5000

2021 4th Ave. North

R60

Billings MT 59101

Bureau of Reclamation - Great Plains Region

GP-5000

2021 4th Avenue North Billings, Montana 59101

Paris Everson 406-247-7817 x

08/01/2017

R17PS01176

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Fire Break Clearing and Fencing, Fort Cobb Reservoir, Washita Basin Project, Oklahoma

The estimate price range for this project is $250,000 to $500,000

Project is set aside for Small Business and the Small Business Size Standard is $15 Million

North American Industrial Classification Code is 238990 (Fencing)

Tax Payer Identification: ____________

Data Universal Numbering System: __________

Commercial and Government Entity Code: __________

Invitation for Bid Open time and date in are in Block 13 with in the is form.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 200 calendar days and complete it within ________________ ________________ calendar days after receiving

08/31/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Great Plains Region

GP-5000

2021 4th Ave. North

R60

Billings MT 59101

Paris Everson

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R17PS01176

00010 Firebreak clearing and fencing

(Price Schedule CLINS 1-15)

(See the following continuation pages)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1 AU $_________________

Section B Supplies or Services and Prices

This page intentionally left blank

Washita Basin Project, Oklahoma

Price Schedule B-1

CONTINUATION OF SECTION B - SUPPLIES OR SERVICES AND PRICES / COSTS

Fire Break Clearing and Fencing Fort Cobb Reservoir

Washita Basin Project, Oklahoma

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN - Contract Line Item Number.

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit Unit Price

Amount

1 WBR

1452.232-

Mobilization and Preparatory work

For the lump sum of $

2 01 71 20 Surveying For the lump sum of $

3 01 56 20 Demolition of Existing Fencing

25,820 LF $ $

4 02 22 00 Demolition For the lump sum of $

5 31 11 00 Mechanical Clearing (Adjacent to Private Property)

33,100 LF $ $

Solicitation Number 17PS001176

Washita Basin Project, Oklahoma

Price Schedule B-2

6 31 11 00 Mechanical Clearing (Abutting Existing Roads)

12,400 LF $ $

7 31 11 00 Hand Clearing 200 LF $ $

8 32 31 30 5-Strand Barbed Wire 45,500 LF $ $

9 32 31 30 2-Rail H-Brace 105 EA $ $

10 32 31 30 3-Rail H-Brace 2 EA $ $

11 32 31 30 3-Rail Corner Post 24 EA $ $

12 32 31 30 Tubular Metal Gates 2 EA $ $

13 32 31 30 Steel Pipe Rail Fencing 340 LF $ $

14 32 31 30 Steel Post and Cable Fencing 1,110 LF $ $

15 32 15 10 Aggregate Base and Gravel Surfacing (c.c.b.c.)

100 Tons $ $

TOTAL FOR SCHEDULE $

END OF SUPPLIES OR SERVICES AND PRICES / COSTS

Washita Basin Project, Oklahoma

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work required under this contract is located on the West side of Fort Cobb Reservoir.

The reservoir is located North of Fort Cobb, Oklahoma on S.H. 146 in Caddo County, Oklahoma.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Property boundary surveying.

B. Demolition of existing fencing.

C. Mechanically clear firebreak.

D. Hand clear areas designated on drawings for construction of fence where mechanical clearing methods are not accessible or allowed.

E. Construct new 5-strand barbed wire fence including T-posts, corner posts, H-braces, and gates.

F. Construct steel pipe rail and steel post and cable fencing at designated locations.

G. Remove trash and debris as indicated on drawings.

H. Locations of features on the drawings are approximate. Exact locations of items to be constructed or installed shall be approved by COR once surveying and clearing work has been completed.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

Washita Basin Project, Oklahoma

Summary of Work 01 11 00 - 2

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

4.03 CONSTRUCTION COMPLETION

A. Construction period is 200 calendar days from the receipt of the Notice to Proceed, for all work. No work is to be performed on weekends or Federal holidays.

Washita Basin Project, Oklahoma .

Work Restrictions 01 14 12 - 1

SECTION 01 14 12

WORK RESTRICTIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 WORK RESTRICTIONS

A. Migratory Birds:

1. Nesting season: March 1 - August 31.

2. Work in accordance with Section 31 11 00 - Clearing.

B. Work hours:

1. Monday through Friday, 7 am to 7 pm.

2. Additional hours per COR approval. Request in writing and be approved 7 days in advance.

3. Additional days per COR approval. Request in writing and be approved 21 days in advance.

C. Allow public access to Fort Cobb State Park and Fort Cobb Wildlife Management Area (WMA) throughout construction.

1. Includes use of public roads and campground areas.

2. Maintain public use of all roadways and access to and from campgrounds during construction.

D. All work performed under this contract is accessible via public roads or Federal lands.

E. Contractor shall allow Reclamation 90 days to review the completed boundary survey prior to clearing areas requiring survey. Contractor shall not begin clearing, demolition or fencing areas requiring survey prior to receiving written approval of the survey by Reclamation.

PART 2 PRODUCTS

Not Used

Washita Basin Project, Oklahoma .

Work Restrictions 01 14 12 - 2

PART 3 EXECUTION

Not Used

Washita Basin Project, Oklahoma

Project Management and Coordination 01 31 19 - 1

SECTION 01 31 19

PROJECT MANAGEMENT AND COORDINATION

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in the prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards, including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rshs.

html

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 31 19-1, Work Plan Summary.

1. Summary of upcoming work and traffic plans for next 60 days.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 PROJECT COORDINATION

A. The following meetings are considered significant, but do not relieve Contractor from the responsibility of other meetings required outside this section.

B. Schedule Update Joint Review Meeting:

1. Meet weekly with COR to review work, progress made, difficulties in performing work, and resolution necessary to meet specifications requirements.

2. Meetings include review of construction program work and updating of progress reports.

Washita Basin Project, Oklahoma

Project Management and Coordination 01 31 19 - 2

C. Work Plan Summary:

1. Prepare written monthly summary of work plans. Provide summary to COR at least 7 days before the start of the month

D. After survey and clearing has been completed, Contractor shall stake locations for new fencing, H-Braces, Corner Braces, Gates, and Post and Cable Fencing in accordance with Section 32 31 30 – Barbed Wire Fencing, Steel Post and Cable Fencing, and Gates. Once staking is complete, Contractor shall contact COR a minimum of seven days prior to starting fence construction to schedule an on-site meeting to review all fence locations.

Contractor shall not construct new fencing prior to receiving written approval from COR.

3.02 STAGING AREAS

A. Contractor may store materials and equipment within cleared firebreaks. Other unsecured staging areas may be available upon request to COR.

B. United States shall not be liable for damage to or theft of contractor materials or equipment.

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-14 United States National CAD Standards, Version 6

1.03 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title, and RSN.

3. Measurement units: US Customary Units

C. Drawings:

1. Minimum identification in title block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

c. Date.

2. Reserve 3- by 3-inch space next to title block for review stamps.

01 33 00 - 2

3. Print Size: D size (22 inches by 34 inches).

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.

a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.

5. Government Format drawings:

a. Prepare drawings designated as “Government Format” in the specifications as follows:

1) Title block and sheet format:

a) As shown on Drawing 40-D-7102.

b) Government will provide specific title block information to be used.

2) Drawing format:

a) AUTOCAD, Version 2007 or later.

b) In accordance with NIBS NCS.

3) Size: D-size (22-inch by 34-inch) as defined by ASME Y14.1.

4) Government will provide an electronic AutoCAD template.

6. Final drawings:

a. Drawing format: AUTOCAD, Version 2007 or later.

b. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

c. Electronic files: On CD or DVD discs.

d. Original plots: D size (22 inches by 34 inches).

e. Government will provide an electronic AutoCAD template.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

Washita Basin Project, Oklahoma Solicitation No. 17PS001176

Submittals 01 33 00 - 3

E. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

F. Samples and Color Selection Submittals:

1. Label with complete manufacturer's product and color identification.

2. Include type and quantity of materials specified in the referenced section in each “set” of samples.

3. Samples: Representative of product to be installed. Xerographic sheets for color selection are not acceptable.

4. Color chips: Sample paint chips. Ink color reproductions are not acceptable.

5. Label each sample, sample kit, set of color chips, or color chart with contract number and title.

6. The Government will select architectural color and pattern after product approval.

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Submit number of sets specified in “No. of sets to be sent to:” columns in Table 01 33 00A - List of Submittals.

D. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for each attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

01 33 00 - 4

E. Resubmittal of submittals not approved:

1. Mark changes such that they are readily identifiable and show revision date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 14 days after receiving the comments, unless otherwise directed.

4. Requirements for initial submittals apply to resubmittals.

F. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.

B. Time in Excess of Specified:

1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.

a. The time extension will be to the extent that excess review time caused delay to the contract completion date.

b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.

2. No time extension will be allowed if the Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to the extent that:

a. Approval was required under the contract, and

b. Requests for approval were properly and timely submitted and were approved.

4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause. Adjustment will be subject to terms of the clause at FAR 52.242-17, Government Delay of Work.

01 33 00 - 5

C. Submittal response:

1. Response letter will indicate whether submittal is approved, approved subject to identified changes, or not approved.

a. Revise and resubmit submittals not approved.

b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.

1.07 TRANSMITTAL

A. Addresses for codes receiving paper copy submittals listed in Table 01 33 00A - List of Submittals:

1. CO: Bureau of Reclamation, Attention GP-5000, PO Box 36900, Billings MT 59107-6900. Physical address: 2021 4th Avenue North, Billings MT 59101.

2. COR: Bureau of Reclamation, Attention OK-McCrackin. Physical address:

5924 NW 2nd Street Suite 200, Oklahoma City, OK 73127-6514.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Washita Basin Project, Oklahoma Solicitation No. 17PS001176

Submittals 01 33 00 - 6

Table 01 33 00A. - List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer Representative.

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

1 Performance and Payment Bonds - Construction 52.228-15

Performance and Payment Bonds

Within 10 calendar days after award

CO 1 paper 0

2 Additional Bond Security 52.228-2

Additional Bond Security

Within 10 calendar days of contract modification or value exceeds amount award

CO 1 paper 0

3 Insurance-Work on a Government Installation 1452.228-70

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

Before commencing onsite work

CO 1 paper

1 paper

4 Liability Insurance 1452.228-70

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

CO 1 paper 0

5 Equal Opportunity 52.222-26

Information required by Executive Order

112246 (SF-100)

Within 30 days following award

CO 1 paper 0

6 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10

Certification that executive compensation and subcontract awards were reported

Within 10 days of each report being submitted

CO 1 paper 0

7 Release of Claims 1452.204-70

Release of Claims (DI-137) against the Government

After completion of the work and prior to final payment

CO 1 paper 0

8 Labor Standards Data 52.222-11

1) List of subcontractors

2) Statement and acknowledgement Form (SF-1413) for each subcontract

Within 14 days after award of contract

COR 1 paper

1 paper

9 Payrolls and Basic Records 52.222-08

Copies of all payrolls

Weekly for each week of contract performance

COR 1 paper 2 paper

01 33 00 - 7

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

10 Site Security

GP-7

List of contractor and subcontractor employees

At least 10 days prior to arriving at worksite

COR 0 2 paper

11 Site Security

GP-7

List of vehicles and equipment to be brought onsite

At least 10 days prior to arriving at worksite

COR 0 2 paper

12 Schedules for Construction Contracts (52.236-15)

Practicable schedule:

Blackline prints

Submitted 14 days before commencing onsite work.

COR 1paper 1paper

01 31 19-1 Project Management and Coordination

Work Plan Summary 7 days prior to the start of each month

COR 0 1 paper

01 35 10-1 Safety Data Sheets

Complete LHM and

SDS

At least 14 days before jobsite delivery of hazardous material

COR 0 1 paper

01 35 10-2 Safety Data Sheets

Updated LHM and

SDS

At least 14 days before jobsite delivery of hazardous material not previously listed

COR 1 paper 1 paper

01 35 20-1 Safety and Health

Safety Program Submitted and accepted before commencing onsite work. See Section 3 of RSHS

COR 0 1 paper

01 35 20-2 Safety and Health

Monthly Accident Summary Report

Monthly COR 0 1 paper

01 35 30-1 Contractor’s Onsite Safety and Health Personnel

Resume At least 14 days prior to employment

COR 0 1 paper

01 35 30-2 Contractor’s Onsite Safety and Health Personnel

Safety Inspection Reports

At least once each week COR 0 1 paper

01 55-20-1 Traffic Control Traffic Control Plan

At least 14 days before affecting public traffic

COR 0 1 paper

01 56 10-1 Protection of Existing Installations

Plan for Protecting Existing Installations

At least 14 days Before starting onsite work

COR 0 1 paper

01 57 20-1 Environmental Controls

Fire Prevention Plan At least 14 days before start of onsite construction work

COR 0 1 paper

01 57 30-1 Water Pollution Control

Water Quality Managment Plan

At least 14 days before start of onsite construction work

COR 0 1 paper

Washita Basin Project, Oklahoma Solicitation No. 17PS001176

Submittals 01 33 00 - 8

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

01 57 30-2 Water Pollution Control

Stormwater Pollution Prevention Plan

At least 14 days before start of onsite construction work

COR 0 1 paper

01 57 30-3 Water Pollution Control

Spill Prevention Control and Countermeasure (SPCC) Plan

At least 14 days before delivery or storage of oil

COR 0 1 paper

01 71 20-1 Surveying Surveying Plan At least 14 days before beginning survey work

COR 0 1 paper

01 71 20-2 Surveying Resume At least 14 days before beginning survey work;

At least 14 days before personnel change

COR 0 1 paper

31 11 00-1 Clearing Qualifications Within 21 days after receipt of Notice to Proceed

COR 0 1 paper

32 15 10-1 Gravel and Aggregate Surfacing

Gradation Certification

At least 14 days before commencing onsite construction work

COR 0 1 paper

32 15 10-2 Gravel and Aggregate Surfacing

Delivery Tickets Within 14 days after placing gravel

COR 0 1 paper

32 31 30-2 Wire Fence T Post Product Literature

At least 14 days before commencing onsite construction work

COR 0 1 paper

32 31 30-3 Wire Fence 2 3/8 inch J55/N80 Pipe Product Literature

At least 14 days before commencing onsite construction work

COR 0 1 paper

32 31 30-4 Wire Fence 4 inch J55/N80 Pipe Product Literature

At least 14 days before commencing onsite construction work

COR 0 1 paper

32 31 30-5 Wire Fence Manufacturer’s Specification for Gate

At least 14 days before commencing onsite construction work

COR 0 1 paper

Washita Basin Project, Oklahoma

Safety Data Sheets 01 35 10 - 1

SECTION 01 35 10

SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials

B. MSDS: Material Safety Data Sheet.

1.03 APPLICATION

A. For the purposes of this contract, the definition of “materials delivered under this contract” in the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes materials delivered to the Government, materials incorporated into the work, and materials used by the Contractor during contract performance at the jobsite.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 10-1, Complete LHM and MSDS.

C. RSN 01 35 10-2, Updated LHM and MSDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1.

1.05 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on the original or previously updated LHM and MSDS before receipt of updated LHM and MSDS by the Contracting Officer.

PART 2 PRODUCTS

Washita Basin Project, Oklahoma

Safety Data Sheets 01 35 10 - 2

PART 3 EXECUTION

Not Used

Washita Basin Project, Oklahoma

Safety and Health 01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards.

Available on the Internet at:

http://www.usbr.gov/ssle/safety/RSHS/rshs.

html

2. FIST 1-1-12 Hazardous Energy Control Program.

Available on the Internet at:

www.usbr.gov/power/data/fist_pub.html

B. Occupational Safety and Health Administration (OSHA)

1. 29 CFR Part 1910 Occupational Safety and Health Standards

2. 29 CFR Part 1926 Safety and Health Regulations for Construction. Available on the Internet at www.osha.gov

C. American Conference of Governmental Industrial Hygienists (ACGIH)

1. Threshold Limit Values (TLVs). Available at www.acgih.org

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 20-1, Safety program:

1. Submit a comprehensive, job-specific safety and health program in accordance with Section 01 33 00 - Submittals and in accordance with the requirements of Section 3.3 of the Reclamation Safety and Health Standards (RSHS) and these specifications.

2. The Safety Program will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B of the RSHS, a

Solicitation Number 17PS001176 http://www.osha.gov/ http://www.acgih.org/

Washita Basin Project, Oklahoma

Safety and Health 01 35 20 - 2 comprehensive narrative for each applicable item in the outline and program elements contained in these specifications.

3. Generic company safety programs are not acceptable. The Safety Program must be site specific for this contract.

4. The Contractor’s Safety Program must be submitted and accepted by Reclamation prior to commencing onsite work, including mobilization.

5. The Safety Program Statement of Responsibility must state that “the contractor is responsible for ensuring that all work will be in compliance with Reclamation Safety and Health Standards and these specifications.”

C. RSN 01 35 20-2, Monthly accident summary report:

1. Form 7-2218 or other acceptable form in accordance with paragraph 3.8 of RSHS.

2. Submit on the first day of every month.

1.04 SAFETY AND HEALTH

A. Comply with RSHS, local safety programs, and any other referenced safety and health standards. Perform work in accordance with the specific safety program elements and referenced standards.

B. Provide and maintain a work environment and procedures that will:

1. Safeguard the public, Government personnel, and Contractor employees from Contractor operations and activities that are unsanitary, hazardous, or dangerous to health and safety.

C. For each operation requiring the use of heavy equipment, in addition to the use of backup alarms and high visibility vests, include in the Job Hazard Analysis specific steps to ensure the protection of onsite personnel (internal traffic control) from the hazards of being struck by or caught between moving equipment while working around such equipment. Possible methods of controlling said hazards may include radio communications, backup cameras and/or proximity devices, designated observers, etc.

Provide all appropriate safety barricades, signs, and warnings.

D. Comply specifically with all requirements contained in RSHS Section 3 - Contractor Requirements.

E. Investigate and report all accidents, incidents and near misses in accordance with RSHS Section 3.7.

F. When the Contractor fails or refuses to promptly correct a compliance directive, the Contracting Officer may issue an order to stop all or any part of the work.

1. When satisfactory corrective action is taken, an order to resume work will be issued.

Washita Basin Project, Oklahoma

Safety and Health 01 35 20 - 3

2. The Contractor shall not be entitled to extension of time or to claim for damage or to additional compensation by reason of ether the directive or the stop order.

3. Failure of the Contracting Officer to order discontinuance of any or all of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.

G. Disputes regarding safety and health issues will be settled in accordance with RSHS Section 3.

H. The Contractor shall be responsible for providing medical and emergency assistance in a timely manner that is consistent with recognized emergency protocols.

1. In instances where local emergency responders are not readily available, the responsibility to provide emergency services shall default back to the Contractor.

I. The Contractor shall be responsible for insuring that Subcontractors comply with the requirements set forth in this specification, written programs, the regulatory standards and the industry standards incorporated by reference in the RSHS and OSHA standards.

J. Where there is conflict between the standards, the more stringent or restrictive shall be utilized.

K. The Contractor shall fully participate in the Contractor Safety Program Review meeting, according to RSHS Section 3.4.1. The Contractor Safety Program Review meeting will take place before the start of construction.

1. Include subcontractor management representatives.

2. The Safety Personnel shall be present, in order to discuss in detail the Safety Program and Plans.

3. The COR, the Contractor's principal onsite representative, and designated members of respective staffs must participate in the Price Scheduled monthly safety meeting (JPSM) according to RSHS Section 3.4.2.

L. The minimum work crew at any time on the construction site shall consist of no less than two (2) people.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Washita Basin Project, Oklahoma

Contractor’s Onsite Safety Personnel 01 35 30 - 1

SECTION 01 35 30

CONTRACTOR’S ONSITE SAFETY PERSONNEL

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 30-1, Resume:

1. Contractor’s Onsite Safety Representative

C. RSN 01 35 30-2, Safety Inspection Reports:

1. List noted deficiencies, their abatement dates, and follow-up action for jobsite activities.

2. Base inspection report on findings of jobsite walk-through with Government personnel.

1.03 QUALIFICATIONS

A. Contractor’s Onsite Safety Representative:

1. Competent supervisory employee with appropriate level of safety related training and experience.

1.04 APPLICATION

A. Designate an employee as the Contractor’s Onsite Safety Representative prior to start of construction.

B. Contractor’s Onsite Safety Representative authorities, duties, and responsibilities:

1. Review and approve the Contractor’s Safety Program prior to submittal.

2. Responsible for effectively implementing the Contractor’s Safety Program

3. Full authorization to correct unsafe acts on the spot.

4. Prepare safety inspection reports.

5. Onsite during construction activities.

Washita Basin Project, Oklahoma

Contractor’s Onsite Safety Personnel 01 35 30 - 2

1.05 QUALITY ASSURANCE

A. Contractor’s Onsite Safety Representative:

1. The effectiveness of the Contractor’s Onsite Safety Representative in prosecuting the safety program will be subject to continued review and approval by the CO.

2. Should the Contractor’s safety effort be considered inadequate, the CO has the option to require the Contractor to employ a qualified Safety Professional.

B. Safety Program:

1. The effectiveness of the Contractor’s Safety Program will be subject to continued review and approval by the CO.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Washita Basin Project, Oklahoma

Reference Standards 01 42 10 - 1

SECTION 01 42 10

REFERENCE STANDARDS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Referenced editions of standard specifications, codes, and manuals form a part of this specification to the extent referenced.

B. These specifications take precedence when conflicting requirements occur between specifications and referenced standard.

1.03 JOBSITE REFERENCE STANDARDS

A. Maintain at fabrication site, a copy of referenced standard specifications, codes, and manuals required for work in progress at fabrication site. Make available for use by the Government.

B. Maintain onsite, a copy of referenced standard specifications, codes, and manuals required for onsite work in progress. Make available for use by the Government.

1.04 AVAILABILITY

A. Code of Federal Regulation (CFR):

1. Available online, authorized by the National Archives and Records Administration (NARA) and the Government Printing Office (GPO), at www.gpoaccess.gov/cfr/index.html.

B. Federal Specifications, Standards, and Commercial Item Descriptions; and Military Specifications:

1. Copies of Federal Specifications, Standards, and Commercial Item Descriptions may be obtained from GSA Federal Supply Service, see the provision at FAR 52.211-1, Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29.

2. Copies of Military Specifications may be obtained from Department of Defense, see the provision at FAR 52.211-2, Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST).

Washita Basin Project, Oklahoma

Reference Standards 01 42 10 - 2

C. Bureau of Reclamation Documents:

1. Reclamation Safety and Health Standards (RSHS), 2009 edition, may be downloaded at http://www.usbr.gov/ssle/safety/RSHS/rshs.html.

a. Hard copies of RSHS, stock number 024-003-00204-6, may be purchased from The Superintendent of Documents at the U.S. Government Printing Office (GPO), phone number (202) 512-1800.

1) GPO online bookstore: http://bookstore.gpo.gov/actions/GetPublication.do?stoc knumber=024-003-00204-6.

2. Bureau of Reclamation Standard Specifications are designated with an M-number. Copies of individual standards may be obtained from Bureau of Reclamation, Attn 86-68170, PO Box 25007, Denver CO 80225-0007. Specify which standard(s) is needed when requesting a copy.

3. Bureau of Reclamation manuals and other publications including significant scientific, technical, and engineering works are available from the National Technical Information Service (NTIS). Information regarding availability and pricing may be obtained by contacting NTIS at the following address:

United States Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, Virginia 22161 Telephone: (703)487-4650 or 1-800-553-6847

D. Industrial and Governmental Documents:

1. When a reference has a joint designation (e.g. ANSI/IEEE) these specifications generally cite the proponent organization (e.g. IEEE).

2. Addresses for obtaining industrial and governmental (other than Federal and Bureau of Reclamation specifications and standards) specifications, standards, and codes are listed in Table 01 42 10A - Addresses for Specifications, Standards, and Codes.

Solicitation Number 17PS001176 http://www.usbr.gov/ssle/safety/RSHS/rshs.htm http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6 http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6

Washita Basin Project, Oklahoma

Reference Standards 01 42 10 - 3

Table 01 42 10A - Addresses for Specifications, Standards, and Codes

Acronym Name and Address Telephone

AASHTO American Association of State Highway and Transportation Officials 444 North Capitol St., NW, Suite 249 Washington, DC 20001 www.aashto.org

(202) 624-5800

(800) 231-3475

AGC Associated General Contractors of America 333 John Carlyle Street, Suite 200 Alexandria VA 22314 www.agc.org

(703) 548-3118

AISC American Institute of Steel Construction One East Wacker Dr., Suite 3100 Chicago, IL 60601-2001 www.aisc.org

(312) 670-2400

ANSI American National Standards Institute 1819 L. Street, N.W.

Washington, DC 20036 www.ansi.org

(202) 293-8020

APA/EWA APA-The Engineered Wood Association P.O.