Amendment No. 0001

View the file

Other files

File Type Posted
Solicitation_No._R16PS01451.pdf PDF
Sol_R16PS01451.pdf PDF
Solicitation_No._R16PS01451.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R16PS01451

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

08/25/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/29/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Bureau of Reclamation Great Plains Region Regional Office PO Box 36900 Billings MT 59107

Project Title: Medicine Creek Dam River Outlet Works Stilling Basin Repairs, Frenchman-Cambridge Unit, Pick-Sloan Missouri Basin Program, Nebraska

See attachment for changes incorporated by this amendment.

Amendment No. 0001 Solicitation No. R16PS01451

Description of Changes: This amendment incorporates the following changes to the solicitation:

1. Remove the Foreword in its entirety and substitute therefore the attached revised Foreword.

2. Remove Section F, Deliveries or Performance, in its entirety and substitute therefore the attached revised pages F - 1 and F - 2.

3. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.

4. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on April 16, 2015 at 10:00 am Central Time.

For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.

Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).

Bid Opening Date - This hour and date for receipt of sealed bids remains 2:00 PM (Mountain Time) on August 30, 2016.

Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

A list of questions from prospective contractors and their respective answers are attached to this amendment and are provided for information only.

The following contractors were in attendance at the organized site visit, which took place on August 17, 2016:

Don Slegers Lambert Engineering 612-770-2384 Mike Montano Harrison Weston 720-881-4100 i

Medicine Creek Dam River Outlet Works Stilling Basin Repairs Frenchman-Cambridge Unit

Pick-Sloan Missouri Basin Program Nebraska

FOREWORD

Medicine Creek Dam is located on Medicine Creek in southwest Nebraska, approximately 8 miles northwest of Cambridge, Nebraska in Frontier County. Work is for repairing existing reinforced concrete outlet works. Principle components of the work include the following.

1. Removing standing water and controlling gate leakage.

2. Removing existing deteriorated concrete.

3. Furnishing and placing reinforced cast-in-place concrete to repair existing river outlet works stilling basin.

TELEPHONE INQUIRIES REGARDING THIS SOLICITATION SHOULD BE MADE TO:

Contractual Matters: Darlene Dillon Contracting Specialist Billings, Montana Telephone: (406) 247-7820 ddillon@usbr.gov

FOR DATE AND PLACE BIDS ARE DUE, SEE “SOLICITATION, OFFER, AND AWARD,"

STANDARD FORM 1442, IMMEDIATELY FOLLOWING THE TABLE OF CONTENTS.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS," WHICH IS APPLICABLE TO

WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR 1452.223-81 SAFETY AND

HEALTH."

YOUR ATTENTION IS DIRECTED TO PART VI, SECTION L, INSTRUCTIONS,

CONDITIONS AND NOTICES TO BIDDERS, WHICH IN PART PROVIDES THAT “ORAL

EXPLANATIONS OR INSTRUCTIONS GIVEN BEFORE THE AWARD OF CONTRACT

WILL NOT BE BINDING."

SITE VISIT: AN ORGANIZED SITE VISIT HAS BEEN SCHEDULED FOR AUGUST 17, 2016

AT 8:00 AM CDT. INTERESTED CONTRACTORS SHALL MAKE ARRANGEMENTS IN

ATTENDING THE SITE VISIT BY CONTACTING MR. JOHN FOREMAN AT 970-962-4527

OR VIA E-MAIL AT JFOREMAN@USBR.GOV. SEE PARAGRAPH L.17 FOR

DIRECTIONS. ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD

HATS AND SAFETY VESTS. PROSPECTIVE CONTRACTORS ARE STRONGLY

ENCOURAGED TO ATTEND THE PRE-BID SITE VISIT TO GAIN A BETTER

UNDERSTANDING OF THE WORK REQUIREMENTS AND SITE CONDITIONS.

SAM: EFFECTIVE JULY 29, 2012, ANY CONTRACTOR INTERESTED IN DOING

BUSINESS WITH THE GOVERNMENT MUST REGISTER IN THE SYSTEM FOR AWARD

mailto:ddillon@usbr.gov mailto:JFOREMAN@USBR.GOV ii

MANAGEMENT (SAM) DATABASE PRIOR TO AWARD OF A CONTRACT OR

AGREEMENT. SAM IS A FEDERAL GOVERNMENT OWNED AND OPERATED FREE

WEBSITE THAT CONSOLIDATES THE CENTRAL CONTRACTOR REGISTRATION

(CCR), THE ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATION

(ORCA), AND THE EXCLUDED PARTIES LIST SYSTEM (EPLS).

THE VENDOR’S DUNS AND BRADSTREET NUMBER AND BANKING INFORMATION

ARE REQUIRED FOR REGISTRATION. CONTRACTORS MAY OBTAIN INFORMATION

ON REGISTRATION AND ANNUAL CONFIRMATION REQUIREMENTS VIA THE SAM

WEBSITE ACCESSES THROUGH HTTPS://WWW.SAM.GOV/PORTAL/PUBLIC/SAM/ OR

BY THE FEDERAL SERVICE DESK AT 1-866-606-8220.

PAYMENT REQUESTS FOR THE ANTICIPATED CONTRACT MUST BE SUBMITTED

ELECTRONICALLY THROUGH THE U.S. DEPARTMENT OF THE TREASURY’S

INTERNET PAYMENT PLATFORM (IPP) SYSTEM. THE IPP WEBSITE IS

HTTPS://WWW.IPP.GOV. THE CONTRACTOR MUST USE THE IPP WEBSITE TO

REGISTER ACCESS AND USE IPP FOR SUBMITTING REQUESTS FOR PAYMENT.

CONTRACTOR ASSISTANCE WITH ENROLLMENT CAN BE OBTAINED BY

CONTACTING THE IPP PRODUCTION HELPDESK VIA E-MAIL

IPPGROUP@BOS.FRB.ORG OR PHONE (866) 973-3131. IF THE CONTRACTOR IS

UNABLE TO COMPLY WITH THE REQUIREMENT TO USE IPP FOR SUBMITTING

INVOICES FOR PAYMENT, THE CONTRACTOR MUST SUBMIT A WAIVER REQUEST

IN WRITING TO THE CONTRACTING OFFICER WITH ITS PROPOSAL OR BID.

https://www.sam.gov/PORTAL/PUBLIC/SAM/ https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

Medicine Creek Dam River Outlet Works Stilling Basin Repairs Solicitation No. R16PS01451/0001

F - 1 (Revised)

SECTION F -- DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK

APR 1984

The Contractor shall be required to: (a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) Prosecute the work diligently, and (c) Complete the entire work ready for use not later than 175 calendar days, and to complete all Concrete Work by March 15, 2017, after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.2 52.211-18 VARIATION IN ESTIMATED QUANTITY APR 1984

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

F.3 52.242-14 SUSPENSION OF WORK APR 1984

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.

However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed -

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

Medicine Creek Dam River Outlet Works Stilling Basin Repairs Solicitation No. R16PS01451/0001

F - 2 (Revised)

Contractor Questions - 1

Prospective Contractor Questions Medicine Creek Dam River Outlet Works Stilling Basin Repairs

Solicitation No. R16PS01451

1. We want to be clear about the expectations and extent of the unwatering work in relation to the controlling gate leakage, section 02 24 20 3.03. Will the contractor be required to do any repair work on leaking valves? Will the contractor need to operate any gate valves? Please explain what might be required for this section of work.

The contractor will not be required to do any repairs on leaking valves. A lock-out/tag-out clearance will be implemented by Reclamation on the closed river outlet works guard gate and regulating gate;

therefore, the gates cannot be operated while work is being performed in the stilling basin. The contractor can use the existing 4-inch drain valve in the pipe invert to drain guard gate leakage into the sump. The drain is located between the two gates just upstream of the regulating gate. The contractor may elect to access the pipe interior via the manhole and install a sandbag water barrier between the drain and the regulating gate to prevent water getting past the drain and leaking from the regulating gate into the work area. Access into the pipe is considered confined space entry. The sump pump is on a float switch and discharges directly into the stilling basin. The contractor can install piping at the sump outlet to pipe gate leakage around the work site discharging downstream of the work site.

2. What is the maximum allowed time for concrete ready mix products once it has been batched?

Reference Section 03 30 00, part 2.08.F: Place concrete within 90 minutes from introduction of cement to water or aggregates.

3. Can concrete be placed by pump or shotcrete?

Reference Section 03 30 00, part 3.02. Concrete may be placed or pumped. Shotcrete methods are not permitted.