AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page of Pages
2. AMENDMENT/MODIFICATION
3. EFFECTIVE DATE
07/13/2016
4. REQUISITION/PURCHASE NO.
0040279392/17840
5. PROJECT NO.
20-C0858
6. ISSUED BY CODE: 00020
Department of the Interior Bureau of Reclamation/Mid-Pacific Region Office 2800 Cottage Way Sacramento, California 95825-1898
7. ADMINISTERED BY CODE: 00020
Department of the Interior Bureau of Reclamation/Mid-Pacific Region Office 2800 Cottage Way Sacramento, California 95825-1898
8. NAME AND ADDRESS OF CONTRACTOR
X
9A. AMENDMENT OF SOLICITATION NO.
R16PS01169
9B. DATED (SEE ITEM 11)
07/13/2016
10A. MODIFICATION OF CONTRACT NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers ( ) is extended (X) is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS
DESCRIBED IN ITEM 14
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ( ) is not, ( ) is required to sign and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The Solicitation cited in block 9A above, Folsom Dam Municipal and Industrial Temperature Control Device Safety Measures is hereby amended.
Purpose: The purpose of this amendment is to incorporate various changes to the solicitation documents.
Description: This amendment hereby incorporates the following solicitation changes: (1) Incorporate revisions to SOW (2) Incorporate Attachment F of Sections C (3) Incorporate Section J, Attachment No. 1 – Wage Determination. (4) Incorporate Section J, Attachment No. 5 – sign in sheet and agenda.
The date and time for receipt of offers remains unchanged at July 28, 2016 at 1:00 p.m.
The contractor shall acknowledge all amendments to the solicitation, as required in Part 19 of the SF-1442.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 16A. NAME AND TITLE OF CONTRACTING OFFICER
Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
ERIM CELIK
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-807030-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
MICROSOFT WORD VERSION
Folsom Dam M&I TCD Safety Measures SOW No. 20-C0858 Folsom Dam – Folsom Unit – Central Valley Project – California
Statement of Work - 1
STATEMENT OF WORK (SOW)
FOLSOM DAM MUNICIPAL AND INDUSTRIAL WATER SUPPLY
TEMPERATURE CONTROL DEVICE (TCD) SAFETY MEASURES
CENTRAL VALLEY PROJECT, CALIFORNIA
DEFINITIONS
A. COR: Contracting Officer Representative.
B. CCAO: Central California Area Office.
C. IWRC: Independent Wire Rope Core.
D. OGR: On-site Government Representative.
E. Reclamation: Bureau of Reclamation.
F. TCD: Temperature Control Device.
1.0 BACKGROUND
The Folsom Dam Temperature Control Device (TCD) is a three sided structure approximately 9.5’ wide by 9.0’ deep that covers the existing trash rack. This enclosure, referred to as the enclosure structure, is approximately 147’ high and is located upstream of the existing trash rack structure and extending from approximately elevation 300.00 feet up to 441.74 feet. Both sides of the enclosure structure are fabricated from structural steel plate reinforced with structural steel shapes. The front of the structure is open except for three gates. The three gates are each provided with their own set of guides enabling them to travel past each other. When fully extended, the gates almost cover the full height of the height of the enclosure structure. The gates are designed so that they operate in telescopic fashion. The upper gate referred to as the control gate is equipped with a lid that blocks flow over the top of the gate. By raising and lowering the window within the control gate, withdrawals from the reservoir can be from any elevation between 331.50 feet and 418.00 feet.
The control gate is raised and lowered by a wire rope hoist mounted on the hoist deck. The motorized hoist is sized so that the gates can be raised or lowered without stopping or reducing the flows through the structure. The hoist has a capacity of 90,000 pounds at a single speed of 4 feet per minute. The hoist is configured with a single hoist drum, with left and right handed grooves for two 1-5/8-inch diameter wire ropes. The ropes are positioned to drop off the drum directly above the gate connections when the gate is at its uppermost position, in order to minimize fleet angles.
The hoist is attached to the control gate by wire ropes, and a turnbuckle is provided on one side for adjustment of the rope tension. The existing wire ropes are constructed of galvanized steel strands with an Independent Wire Rope Core (IWRC) and are approximately 185’ in length each. The hoist deck is located at the top of the dam just below the roadway, at approximately elevation 477.00 feet. The top of this hoist deck is covered in steel grating that is fastened down with steel bolts and clips, with sections of grating able to be removed via crane to access the inside of the control structure and top of the control gate. The control structure is hung from steel corbels attached to the mass concrete of the dam.
Amendment No. 0001 Solicitation No. R16PS01169
Statement of Work - 2
During an inspection in December 2015 the wire ropes were found severely corroded and a subsequent rope inspection via a Reclamation climb team confirmed the components that warrant replacement. The TCD was installed and commissioned in 2003. The new rope shall be an in kind replacement, as well as other associated attaching hardware. In addition, Reclamation drawing 485-D-2327 shows a safety cage and ladder system to facilitate access to inspect and maintain the TCD structure/components including the wire ropes below the hoist platform. The cage and ladder system was never installed and otherwise is missing. Access below the hoist platform is unsafe for maintenance personnel unless personnel are climb team qualified. As such, only qualified climb team members can safely access or some other elaborate system such as scaffolding and or use of a crane can facilitate inspections below the hoist platform. Given the nexus with safety of CCAO staff, a safety cage and ladder system should be installed at the earliest possible date.
2.0 OBJECTIVES
• Replace wire ropes and connecting hardware from the control gate to drum.
• Supply and install safety access cage and ladder system.
• Confirm functionality of hoist and rope system.
• No spills/debris in Folsom Lake.
3.0 SCOPE
The Contractor that is awarded the job shall:
A. Safely rig control gate to facilitate removal of existing wire ropes.
B. Remove of and dispose of the old wire ropes and all connecting hardware including but not limited to turnbuckles and spelter sockets.
C. Install an in-kind replacement galvanized steel wire ropes and associated rated connecting hardware.
D. In coordination with Reclamation personnel, perform a functional test of hoist after installation of new wire ropes and connecting hardware.
E. Supply and install safety access cage and ladder system.
F. Repair any facilities damaged due to construction activities.
The Contractor shall propose their method for Reclamation’s approval to support the control gates in order to remove the tension on the ropes to facilitate the replacement of the wire ropes.
See Sections 6.21 and 6.22 below. All corroded and damaged components of the rope system shall be replaced. All rope connecting hardware shall be rated the same and new.
4.0 TYPE OF CONTRACT
The Government will award a firm fixed priced construction contract.
5.0 PERIOD OF PERFORMANCE
All on-site work shall be complete within 90 days after award of contract. Period of performance to include preparatory work, approval of submittals and all on-site work – replacement of wire ropes and installation of safety access cage and ladder system.
Statement of Work - 3
5.1 Recognized Holidays
No work shall occur during Federal holidays.
5.2 Hours of Operations
The Contractor is responsible for conducting business, between the hours of 0700 – 1700 Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
5.3 Place of Performance
The work under this contract will be performed at Folsom Dam located at 7794 Folsom Dam Road, Folsom, CA 95630.
5.4 Security
A. Contractor Security Requirements
The contract solicitation may delineate any applicable specific Contractor security requirements. As such, Contractor personnel performing work under this contract shall meet the security requirements at the time of award, and must maintain the level of security required for the life of the contract. The Contractor shall coordinate access for personnel, materials, and equipment with the COR/OGR prior to mobilization on site.
The COR/OGR will escort Contractor personnel as necessary and will be at the work site any time the Contractor is on site. The COR/OGR will need the names, company names, position of each individual and dates and times each individual is expected on site at least five business days prior to any work conducted onsite.
B. Site Security Less any preliminary activities, the Government anticipates about 2-3 weeks on site to complete the installation work. Because of this short duration, Contractor storage areas should not be required. Any material stored onsite shall be done at the risk of the Contractor. One lane of Folsom Dam Road shall remain open at all times, unless approved by the COR/OGR for a specific activity and duration.
The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
6.0 DELIVERABLES
The Contractor shall provide all labor, materials, equipment and permits necessary to complete the requirements outlined in this SOW and in Reclamation approved submittals. The Contractor shall remove and properly dispose of all debris such as wood to facilitate the work. The items/deliverables
Statement of Work - 4 that follow are effectively submittal/technical requirements to be provided/complied by the Contractor, and will require approval by the COR prior to any work starting on site. Provide as-built drawings, and material data on new designs/installations and include wire rope data in a tabbed O&M manual. See Section F for O&M manual and all other submittal requirements.
6.1 Project Schedule
The Contractor shall provide a schedule showing the major elements of work and work breakdown structure that include submittals, preliminary site investigation, fabrication and lead time on materials, and the anticipated onsite work. Clearly show your approach regarding completion of all work and delineate the work associated with the wire ropes from the installation of the safety cage and ladder system, or overlap as applicable. Utilize MS Project, Primavera, or other industry standard program in developing schedule, but provide schedule in PDF format. Provide an updated schedule within 5 business days as requested by the COR/OGR.
6.2 Site Specific Safety Program and JHA
The Contractor shall submit a written safety program covering all aspects of the onsite activities associated with the proposed work/contract and signed by a Certified Safety Professional. Indicate/show plan to support gate to facilitate removal of the wire ropes. As applicable, indicate use of portable cranes necessary to perform the work. Provide a detailed scaffolding plan as applicable in performing any work on the face of Folsom Dam.
See Section 3 and Appendix B of Reclamation Safety and Health Standards (RSHS), 2014, (http:://www.usbr.gov/ssle/safety/RSHS/rshs.html) for detailed requirements. In addition, the Contractor shall submit Job Hazard Analyses (JHAs), and the Contractor shall conduct Joint JHA field meetings with Reclamation prior to the start of any onsite activities. See Sections 3 and 4 of the RSHS for specific requirements. No work shall proceed without an approved safety program and appropriate JHAs.
6.21 Design, Fabrication and Installation of Maintenance Pad Eyes The existing pad eye design in which the wire rope hardware attach to are shown on reference drawings 485-D-2334 and 2335. These reference drawings can be utilized as a guide to design and fabricate pad eyes adjacent to the existing to facilitate replacement of the wire ropes and hardware in the future. Drawing 485-D-2333 indicates that the total estimated weight of the gates (dead load) is about 40,800 pounds. The design shall facilitate the ability utilize typical rigging hardware to support the gate. The design shall be signed off by a Mechanical PE Registered in the State of California and include calculations and all details for materials, welding, Non-Destructive Testing (NDT) and installation requirements. All welding shall be accomplished by qualified welders per AWS standards. Provide NDT reports of pad eyes and a separate report as a result of welding the pad eye to the control gate.
6.22 Plan to Support Gates and Replacement of Wire Ropes
Provide detailed plan on supporting the existing load and replacement of the wire ropes.
Indicate equipment, manpower, size and set up of crane, duration, etc.
6.3 Product and Technical Data on New Wire Rope
The hoisting rope shall be of proper design and construction for crane service. The rated capacity load plus the load block weight divided by the number of parts of rope shall not exceed 20 percent of the published breaking strength of the rope. Provide length of rope
Statement of Work - 5 sufficient to permit the required lift, plus two dead wraps at the drum, plus length for anchoring to drum. Match existing rope diameter, strands, number of wires per strand, and lay. The rope shall have an independent wire rope core and shall be pre-lubricated using the manufacturer’s recommended lubricant and lubrication process for wire ropes on outdoor B30.7 Base Mounted Drum Hoists. Provide the following per Attachment C and field verify as necessary:
a. Two 1-5/8” diameter, 6x36WS, Round, Galvanized, EIPS, Right Regular Lay, Preformed, IWRC Steel Ropes. Include rope certificate(s) with submittal.
b. Rope system rated connecting hardware (galvanized) includes but is not limited to spelter sockets and turnbuckles.
6.3.A Wire Rope Installation
The Contractor shall:
A. Support the control gate to facilitate slacking of the wire ropes per Section
6.22. Remove the existing ropes, and prior to installation of new ropes, clean drums, and any parts/surfaces that come in contact with rope shall be free of grease, dirt, and debris.
B. Inspect drum hoist in accordance with ASME B30.7. Reeve and terminate rope(s) in a manner identical to existing installations.
C. Allow proper set-in of the rope and associated equipment.
D. Ensure new ropes come pre-lubed with a penetrating oil. Utilize environmentally friendly lubricants: “Wirelife Low Tox Penetrating Lubricant (2011)” or equivalent as approved can be used to ensure penetration to the inner part of the rope. The pre-lubed ropes shall be “sealed” the entire length with “Earthwise EAL Wire Rope Grease (3353)” or equivalent as approved.
E. Properly dispose of old wire rope and any excess materials.
6.4 Product, Technical Data and Shop Drawings for Safety Access and Ladder System The Contractor shall supply and install a safety access cage and ladder system per reference drawings in Attachment B. The safety access cage and ladder system to be provided starts at above the hoist deck (El. 477 feet) and continues downward to El. 461 feet to El. 444 feet and to the concrete landing at El. 428 feet. These reference drawings are a guide, but can be utilized to develop shop drawings for approval. The Contractor shall verify field conditions as necessary in developing shop drawings. Work includes but is not limited to installation of ladders, platforms, platform guardrails, platform grating, and guardrails on the concrete bulkhead gate platform for a complete system in providing safe access to areas below the TCD hoist platform. The Contractor shall remove and properly dispose of all debris such as wood to facilitate the work. See Attachment A and F for submittal requirements.
Note: Drawings included in Attachment B were designed to obsolete design codes. New design codes are to be used as indicated in Section 8.0 of this SOW. All installed items associated with safety access ladder and platform systems shall meet all applicable design codes for structural applications in California.
Statement of Work - 6
6.5 Water Pollution Control and Spill Prevention
See Attachment D for requirements.
6.6 Repair of Site to Pre-Construction Conditions
After completion of work, restore and repair all areas where construction activities negatively impacted the facilities. Contractor to perform a site assessment prior to mobilization to verify initial conditions. All restoration and repair activities at are the cost of the Contractor. Contractor to submit repair methods to the Government prior to implementation.
7.0 GOVERNMENT FURNISHED PROPERTY
See applicable information under 5.4 Security above. The Contractor shall be given an adequate work area, and parking shall be allowed on site as coordinated through the COR/OGR and upon approval of all submittals. Therefore, the TCD control gate and system will be turned over to the Contractor for repairs as outlined in this SOW and as coordinated and approved by the Government.
7.1 Services
At mobilization, the Government will operate the TCD through its full range of operation with all parties present. The contractor shall note and record the high and low digital and mechanical elevation readouts and match these readings as a result replacing the wire ropes. Any other pertinent existing conditions/parameters shall be noted by the Government and the Contractor at that time to ensure the TCD is returned to a same and fully operational state when the TCD is handed back to the Government. Existing Government cranes will not be available for use by the Contractor or Government personnel.
Therefore, the Contractor shall provide any cranes required and provide qualified crane operators and riggers, with certifications provided to the COR at least five days before any planned operations. Reclamation personnel may observe rigging and similar operations to ensure safety, and protection of equipment. Although, it is the intent of Reclamation to hand off the TCD to the contractor until substantial completion, Reclamation reserves the right to operate the TCD on behalf of the Contractor because of potential safety concerns, or operations that Reclamation may be much more familiar with thereby limiting any potential issues. The Contractor shall be expected to provide all qualified personnel, ladders, equipment, materials, etc. to facilitate completion of the work.
7.2 Facilities
The Government will provide an accommodating work area as indicated in Section 7.0 above.
7.3 Utilities
There will be no restroom facilities available at Folsom Dam. Assume that no potable water is available. 120VAC power may be available, but may not be at a location convenient to the Contractor. Extension cords and alike shall be provided by the Contractor.
Statement of Work - 7
7.4 Project Restrictions/Limitations
The work herein requires the Folsom Dam water elevation to be below 428 feet as shown on drawing 485-D-2327. Typically, the reservoir draws down below this elevation in late summer and this continues through the fall. Therefore, it is anticipated that the work could occur from August through December. Unusual early rains or lack thereof could affect the aforementioned work window.
8.0 APPLICABLE PUBLICATIONS/STANDARDS/CODES
• Aluminum Association (AA) o AA ADM-105-2005 - Aluminum Design Manual
• American Institute of Steel Construction (AISC) o AISC 360-10 – Specifications for Steel Structural Buildings
• American Concrete Institute (ACI) o ACI 355.4-11, Qualification of Post-Installed Adhesive Anchors in Concrete and Commentary o ACI 318-11, Building Code Requirements for Structural Concrete and
Commentary
• American National Standards Institute (ANSI) o ANSI A 14.3-2002 - Fixed Ladders - Safety Requirements
• American Society of Mechanical Engineers (ASME) o ASME B30.7 – Base Mounted Drum Hoists o ASME B18.2.1-1996(2005) - Square and Hex Bolts and Screws, Inch Series
• American Society of Civil Engineers (ASCE) o ASCE 7-10, Minimum Design Loads for Buildings and Other Structures
• American Welding Society, Inc. (AWS)
• ASTM International (ASTM) o For all material proposed to be used. List all ASTM designations on shop drawing approval submittal and as-built drawings. Submit manufacturer specification sheets for each item proposed indicating it meets ASTM designation, as applicable.
• Bureau of Reclamation (USBR) o USBR M-47 Guide to Concrete Repair, 2015.
• Code of Federal Regulations (CFR) o 40 CFR, Part 112 Oil Pollution Prevention o 29 CFR 1910 – Occupational Safety and Health Standards
• Federal Specifications (FS) o FS RR-W-410F - Wire Rope and Strand o FS RR-S-550D(1) - Sockets, Wire Rope
• International Coder Council (ICC) o IBC-15, 2015 International Building Code
• National Association of Architectural Metal Mfrs. (NAAMM)
• Public Law o Sections 311, 402, and 404 Clean Water Act (Public Law 92-500, as amended)
Statement of Work - 8
9.0 TASKS
The various tasks and technical requirements are outlined above and include, but are not limited to the Scope and Deliverables sections of this SOW. The Contractor shall provide all labor, materials, equipment and permits necessary to complete the requirements outlined herein and in Reclamation approved submittals. The Contractor shall be responsible to field verify measurements and any data, reports or reference drawings provided by Reclamation in completing all submittals requirements and achieving the objectives of this project. The Contractor shall be responsible for any damage to Reclamation facilities/equipment, and will pay for damages at their expense.
The Contractor shall comply with all applicable Federal, State and Local laws and regulations. The ladder and platform designs shall meet the aforementioned applicable publications/standards/codes per structural applications designed and sealed by a California Professional Engineer.
10.0 CONTRACTOR PERFORMANCE ASSESSMENT
The COR will be the primary individual to monitor and/or assess the Contractor’s work, and will report any deficiencies to the CO as appropriate. The COR is responsible to ensure that all technical requirements of the contract and this SOW are met. As such, the COR may be asked to provide input to the CO regarding the Contractor’s performance during the course of the contract, and during the close-out phase in which the Contractor may receive a final evaluation of their work.
11.0 ATTACHMENTS
A. Safety Access Cage and Ladder System Metalwork Specifications.
B. Reference Drawings:
485-D-2318 – TCD Structural Steel Hoist Platform Details 485-D-2319 – Guardrail Miscellaneous Metalwork 485-D-2320 – Grating Miscellaneous Metalwork 485-D-2321 – TCD Structural Steel Guides 485-D-2323 – Ladders and Cages 485-D-2324 – Miscellaneous Platform Metalwork 485-D-2327 - TCD General Installation/Overview 485-D-2328 - Enclosure Structure – Installation and Details 485-D-2333 - Gates – Installation, Assembly and Operation 485-D-2334 – Lower Gate – Control Gate Details 485-D-2335 – Control Gate Details 485-D-2340 – Control Gate Hoist General Arrangement 40-D-7102 – Drawings Border, Sample Title Block, and Signature Lines
C. Existing Wire Rope Certificate, Spelter Socket and Turnbuckle Data.
Statement of Work - 9
D. Water Pollution Control and Spill Prevention Specifications.
E. Photos.
F. Submittal Requirements
END OF SECTION
Submittals
Attachment F
ATTACHMENT F
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-2005(2010) Decimal Inch Drawing Sheet Size and Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-2011 United States National CAD Standards, Version 5
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:
1. A – Action:
a. Government will respond as to adequacy of submittal.
b. Action submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.
2. I – Informational:
a. The Government will acknowledge receipt of Informational submittals.
b. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by the Government is not required.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement units: US Customary Units
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Reserve 3- by 3-inch space next to title block for review stamps.
3. Print Size: D size (22 inches by 34 inches).
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.
5. Government Format drawings:
a. Prepare drawings designated as “Government Format” in the specifications as follows:
1) Title block and sheet format:
a) As shown on Drawing 40-D-7102.
b) Government will provide specific title block information to be used.
2) Drawing format:
a) AUTOCAD, Version 2007 or later.
b) In accordance with NIBS NCS.
3) Size: D-size (22-inch by 34-inch) as defined by ASME Y14.1.
4) Government will provide an electronic AutoCAD template.
6. Final drawings:
a. Drawing format: AUTOCAD, Version 2007 or later.
b. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
c. Electronic files: On CD or DVD discs.
d. Original plots: D size (22 inches by 34 inches).
e. Government will provide an electronic AutoCAD template.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit number of sets specified in “No. of sets to be sent to:” columns in Table 01 33 00A - List of Submittals.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 7 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
F. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 14 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.
a. The time extension will be to the extent that excess review time caused delay to the contract completion date.
b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.
2. No time extension will be allowed if the Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to the extent that:
a. Approval was required under the contract, and
b. Requests for approval were properly and timely submitted and were approved.
1.07 TRANSMITTAL
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Construction Engineer (CE), Bureau of Reclamation, MP Construction Office, P.O. Box 988, Willows CA 95988-0988. (For express mail service, use 1140 West Wood Street, Willows CA 95988-2615)
2. Area Manager, Bureau of Reclamation, Attn: CC-612, 7794 Folsom Dam Road, Folsom, CA 95630
3. Onsite Government Representative, Attn: MPCO-314, 7794 Folsom Dam Road, Folsom, CA 95630
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A – List of Submittals.
C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code, but show “No. of sets to be sent to” in Table 01 33 00A – List of Submittals.
D. Send electronic copy of the submittal to designated personnel.
E. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.
F. Submittals required by the specifications, but not listed in Table 01 33 00A - List of Submittals:
1. Submit in accordance with this section.
2. Submit to Construction Engineer, unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
RSN
Clause or
Section Title
Submittals required (All Submittals are Action submittals)
Due date or delivery time
Respon-sible code
No. of sets to be sent to: **
CE OGR AM
PWS-1 6.1 Project Schedule Within 14 days after Notice to Proceed and as updates warrant
CE 2 2 1
PWS-2 6.2 Site Specific Safety Program and List of JHAs
Must be approved prior to mobilization
CE 2 2 1
PWS-3 6.21 Design, Fabrication, and Installation of Maintenance Pad Eyes
Must be approved prior to mobilization
CE 2 2 1
PWS-4 6.22 Plan to Support Gates and Replacement of Wire Ropes
Must be approved prior to mobilization
CE 2 2 1
PWS-5 6.3 Product and Technical Data on New Wire rope and connecting hardware
Must be approved prior to mobilization
CE 2 2 1
PWS-6 6.3A Wire Rope Lubricants
Must be approved prior to mobilization
CE 2 2 1
PWS-7 6.5 Spill Prevention, Control and Countermeasure Plan
(SPCC)
Must be approved prior to mobilization
CE 2 2 1
PWS-8 6.0 As-Built Drawings, O&M Data and Manuals
Within 30 days of substantial completion
CE 2 2 6
PWS-9 A-1 Ladder and Platform Safety Approval Drawings and Data
Must be approved prior to mobilization
CE 2 2 1
PWS-10 A-2 Ladder and Platform Safety Manufacturer’s Installation Instructions
Must be approved prior to mobilization
CE 2 2 1
PWS-11 6.6 Repair of Site to preconstruction Conditions (If Needed)
Within 14 days of damage
CE 2 2 1
END OF SECTION
Specifications No. 20-C0858
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Attachment Number
List of Documents, Exhibits, and other Attachments
General Decision Number: CA160009 CA9 dated 07/08/2016
Subcontracting Percentages Worksheet
Offeror Responsibility Information
Section G - RAC 15-13 Invoicing Documents
Sign in Sheet and Agenda
Folsom Dam Municipal and Industrial Temperature Control Device Safety Measures 20-C0858
Section J – Attachment 1
General Decision Number: CA160009 07/08/2016 CA9
Superseded General Decision Number: CA20150009
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California.
BUILDING CONSTRUCTION PROJECTS (excluding Amador County only);
DREDGING CONSTRUCTION PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); AND HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 01/29/2016 3 02/19/2016 4 02/26/2016 5 03/04/2016 6 07/08/2016
ASBE0016-001 01/01/2014
AREA 1: MARIN, NAPA, SAN BENITO, SAN FRANCISCO, SOLANO, &
SONOMA COUNTIES
AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 57.15 18.72 Area 2......................$ 44.05 18.62
ASBE0016-007 01/01/2015
AREA 1 : ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO
& YUBA COUNTIES
AREA 2: MARIN & NAPA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
AREA 1......................$ 28.30 7.75
AREA 2......................$ 32.38 7.75
BOIL0549-002 01/01/2013
Rates Fringes
BOILERMAKER
(1) Marin & Solano Counties.$ 42.06 33.43
(2) Remaining Counties......$ 38.37 31.32
BRCA0003-001 08/01/2013
Rates Fringes
MARBLE FINISHER..................$ 28.05 14.01
BRCA0003-004 05/01/2015
AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA,
SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES
AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA AND TRINITY
COUNTIES
BRICKLAYER
AREA 1......................$ 37.31 19.73
AREA 2......................$ 39.99 24.75
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
* BRCA0003-008 07/01/2015
Rates Fringes
TERRAZZO FINISHER................$ 33.78 15.73
TERRAZZO WORKER/SETTER...........$ 41.01 25.53
BRCA0003-010 04/01/2015
Rates Fringes
TILE FINISHER
Area 1......................$ 23.32 10.43 Area 2......................$ 23.31 12.90 Area 3......................$ 23.49 12.77 Area 4......................$ 22.99 12.25 Tile Layer Area 1......................$ 39.42 12.42 Area 2......................$ 37.31 14.19 Area 3......................$ 41.87 14.24 Area 4......................$ 38.74 14.19
AREA 1: Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Sutter, Tehema, Yolo, Yuba AREA 2: Alpine, Amador AREA 3: Marin, Napa, Solano, Siskiyou AREA 4: Sonoma
BRCA0003-014 08/01/2013
Rates Fringes
MARBLE MASON.....................$ 39.30 22.48
CARP0034-001 07/01/2014
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician...........$ 39.60 30.73 Diver standby...............$ 44.56 30.73 Diver Tender................$ 43.56 30.73 Diver wet...................$ 89.12 30.73 Manifold Operator (mixed gas)........................$ 48.56 30.73 Manifold Operator (Standby).$ 43.56 30.73
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2014
Rates Fringes
Piledriver.......................$ 40.60 30.73
CARP0035-001 08/01/2015
AREA 1: MARIN, NAPA, SOLANO & SONOMA
AREA 3: SACRAMENTO, WESTERN EL DORADO (Territory west of an including highway 49 and the territory inside the city limits of Placerville), WESTERN PLACER (Territory west of and including highway 49), & YOLO
AREA 4: ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN,
LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA,
SISKIYOU, SUTTER, TEHAMA, TRINITY, & YUBA
Drywall Installers/Lathers:
Area 1......................$ 42.40 26.42 Area 3......................$ 37.02 26.42 Area 4......................$ 35.67 26.42 Drywall Stocker/Scrapper Area 1......................$ 21.20 14.60 Area 3......................$ 18.51 14.60 Area 4......................$ 17.84 14.60
CARP0035-009 07/01/2015
Marin County
Rates Fringes
CARPENTER
Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP0035-010 07/01/2014
AREA 1: Marin, Napa, Solano & Sonoma Counties
AREA 2: Monterey, San Benito and Santa Cruz
AREA 3: Alpine, Butte, Colusa, El Dorado, Glenn, Lassen, Modoc, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Sutter, Tehama, Trinity, Yolo & Yuba counties
Modular Furniture Installer Area 1 Installer I................$ 23.36 18.31 Installer II...............$ 19.93 18.31 Lead Installer.............$ 26.81 18.81 Master Installer...........$ 31.03 18.81 Area 2 Installer I................$ 20.71 18.31 Installer II...............$ 17.76 18.31 Lead Installer.............$ 23.68 18.81 Master Installer...........$ 27.31 18.81
Area 3 Installer I................$ 19.76 18.31 Installer II...............$ 16.99 18.31 Lead Installer.............$ 22.56 18.81 Master Installer...........$ 29.58 18.81
CARP0046-001 07/01/2015
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 36.67 25.98 Journeyman Carpenter........$ 36.52 25.98 Millwright..................$ 39.02 27.38
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-002 07/01/2015
Alpine, Colusa, El Dorado (East), Nevada, Placer (East), Sierra, Sutter and Yuba Counties
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 35.32 25.98 Journeyman Carpenter........$ 35.17 25.98 Millwright..................$ 37.67 27.38
CARP0152-003 07/01/2014
Amador County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 33.27 27.53 Journeyman Carpenter........$ 33.12 27.53 Millwright..................$ 35.62 29.12
CARP0180-001 07/01/2015
Solano County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP0751-001 07/01/2015
Napa and Sonoma Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 42.55 25.98 Journeyman Carpenter........$ 42.40 25.98 Millwright..................$ 42.50 27.38
CARP1599-001 07/01/2015
Butte, Glenn, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties
Carpenters Bridge Builder/Highway Carpenter...................$ 42.40 25.98 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw
Filer.......................$ 35.32 25.98 Journeyman Carpenter........$ 35.17 25.98 Millwright..................$ 37.67 27.38
* ELEC0180-001 06/01/2016
NAPA AND SOLANO COUNTIES
Rates Fringes
CABLE SPLICER....................$ 50.97 3%+20.13
ELECTRICIAN......................$ 46.31 22.52
ELEC0180-003 12/01/2015
NAPA AND SOLANO COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 33.32 16.29 Technician..................$ 34.32 17.33
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS
SYSTEMS that transmit or receive information and/or control systems that are intrinsic to the above.
EXCLUDES-
Excludes all other data systems or multiple systems which include control function or power supply; excludes installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excludes energy management systems.
ELEC0340-002 12/01/2015
ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN,
NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES
Communications System Sound & Communications Installer...................$ 27.85 14.80 Sound & Communications Technician..................$ 32.03 14.92
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music Intercom and telephone interconnect systems, Telephone systems, Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide.
B. FIRE ALARM SYSTEMS
Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems, Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems VSAT Data Systems Data Communication Systems RF and Remote Control Systems Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0340-003 02/01/2016
ALPINE (West of Sierra Mt. Watershed), AMADOR, BUTTE, COLUSA, EL DORADO (West of Sierra Mt. Watershed), GLENN, LASSEN, NEVADA (West of Sierra Mt. Watershed), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (West of Sierra Mt. Watershed), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES
ELECTRICIAN
Remaining area..............$ 39.06 24.51 Sierra Army Depot, Herlong..$ 48.83 18.54 Tunnel work.................$ 41.01 18.54
CABLE SPLICER: Receives 110% of the Electrician basic hourly rate.
* ELEC0401-005 07/01/2016
ALPINE (east of the main watershed divide), EL DORADO (east of the main watershed divide), NEVADA (east of the main watershed), PLACER (east of the main watershed divide) and SIERRA (east of the main watershed divide) COUNTIES:
ELECTRICIAN......................$ 29.00 16.33
* ELEC0551-004 06/01/2016
MARIN AND SONOMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.40 19.78
ELEC0551-005 12/01/2015
MARIN & SONOMA COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 34.32 17.33 Technician..................$ 39.08 17.21
SCOPE OF WORK INCLUDES-
SOUND & VOICE TRANSMISSION (Music, Intercom, Nurse Call, Telephone); FIRE ALARM SYSTEMS [excluding fire alarm work when installed in raceways (including wire…