R16PS01133 Solicitation

View the file

Other files

File Type Posted
Sol_R16PS01133_Amd_000001_with_attachment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation for Bid (IFB) Solicitation No. R16PS01133

Fire Break Clearing and Fencing Fort Cobb Reservoir Washita Basin Project, Oklahoma

Forward

Fire Break Clearing and Fencing Fort Cobb Reservoir

Washita Basin Project, Oklahoma

FORWARD

Work is located at Fort Cobb Reservoir located approximately four miles north of Fort Cobb, Oklahoma on S.H. 146 in Caddo County.

Principle components of work include: (1) Surveying; (2) Demolition of existing fencing; (3) Mechanically clearing 20-foot wide firebreak; (4) Hand clearing 5-foot for fencing where mechanical clearing is not authorized; (5) Constructing new 5-strand barbed wire fence and gates; (6) Constructing steel corner posts and H-braces; (7) Constructing steel post and cable fencing.

Inquiries regarding this solicitation should be emailed to:

Contractual Matters: Paris Everson

Contracting Officer Billings, Montana peverson@usbr.gov

Technical Matters: Matt Warren, P.E.

Oklahoma City, Oklahoma mwarren@usbr.gov

For the date and place bids are due, see “Solicitation, Offer, and Award,” Standard Form 1442, immediately following the Table of Contents.

For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards,” (2009 Edition) which is applicable to work under this contract, see clause at “WBR 1452.223-81 Safety and Health.”

Your attention is directed to Part VI Section L, Instructions, Conditions and Notices to Bidders, Section L-8: 52.214-06 Explanation to Prospective Bidders: which in part provides that “Oral explanations or instructions given before the award of contract will not be binding.”

Pre-Bid Site Visit: A pre-bid site visit has been scheduled for June 23, 2016 at 10:00 am local time. Interested contractors shall make arrangements for attending the site visit by contacting Mr.

Matt Warren via e-mail at mwarren@usbr.gov. See paragraph L.16 – SITE VISIT for information on the site visit.

Forward

SAM: Effective July 29, 2012, any contractor interested in doing business with the government must register in the System for Award Management (SAM) database prior to award of a contract or agreement. SAM is a federal government owned and operated free website that consolidates the Central Contractor Registration (CCR), the Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).

The vendor’s Duns and Bradstreet number and banking information are required for registration.

Contractors may obtain information on registration and annual confirmation requirements via the SAM website accesses through https://www.sam.gov/portal/public/sam/ or by the Federal Service Desk at 1-866-606-8220.

Payment requests for the anticipated contract must be submitted electronically through the U.S.

Department of the Treasury’s Invoicing Processing Platform (IPP) system. The IPP website is https://www.ipp.gov. The contractor must use the IPP website to register access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone (866) 973- 3131. If the contractor is unable to comply with the requirements to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the contracting officer with its proposal or bid.

END OF FORWARD

Document No.

R16PS01133

Document Title

Fire Break Clearing and Fencing, Fort Cobb Reservoir, Ok

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work required under this contract is located on the East and West side of Fort Cobb Reservoir. The reservoir is located North of Fort Cobb, Oklahoma on S.H. 146 in Caddo County, Oklahoma.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Property boundary surveying.

B. Demolition of existing fencing.

C. Mechanically clear 20-foot firebreak.

D. Hand clear areas designated on drawings for construction of fence where mechanical clearing methods are not accessible or allowed.

E. Construct new 5-strand barbed wire fence including T-posts, corner posts, H-braces, and gates.

F. Construct steel post and cable fencing at designated locations

G. Locations of features on the drawings are approximate. Exact locations of items to be constructed or installed shall be approved by COR once surveying and clearing work has been completed.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

Document No.

R16PS01133

Document Title

Fire Break Clearing and Fencing, Fort Cobb Reservoir, Ok

Summary of Work

01 11 00 - 2

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

4.03 CONSTRUCTION COMPLETION

A. Construction period is 160 calendar days from the receipt of the Notice to Proceed, for all work. No work is to be performed on weekends or Federal holidays.

END OF SECTION

Item 1

Item 2

Reclamation Safety and Health Standards (RSHS)

General Decision Number: OK160036 01/08/2016 OK36

Superseded General Decision Number: OK20150036

State: Oklahoma

Construction Type: Heavy

Counties: Beckham, Caddo, Cotton, Custer, Greer, Harmon, Jackson, Jefferson, Kiowa, Roger Mills, Stephens, Tillman and Washita Counties in Oklahoma.

HEAVY CONSTRUCTION PROJECTS (including sewer/water line construction; heavy construction projects on treatment plants) (excludes heavy dredging and water well drilling)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

* ELEC1002-005 06/28/2015

Rates Fringes

ELECTRICIAN......................$ 33.89 29%+5.00

ENGI0627-016 06/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR:

Group 1.....................$ 28.05 11.83 Group 2.....................$ 26.35 11.83 Group 3.....................$ 25.80 11.83 Group 4.....................$ 25.05 11.83 Group 5.....................$ 24.55 11.83 Group 6.....................$ 24.10 11.83 Group 8.....................$ 22.10 11.83 Group 9.....................$ 21.60 11.83 Group10.....................$ 21.10 11.83

POWER EQUIPMENT OPERATOR

GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.

6/3/2016http://www.wdol.gov/wdol/scafiles/davisbacon/OK36.dvb?v=0

ATTACHMENT NUMBER 0001

GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.

GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).

GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane; MECHANIC;

TRACKHOE; GRADER/BLADE; Power Driven Hole Digger with less than 30' mast

GROUP 5: BULLDOZER; BOBCAT/SKID STEER/SKID LOADER

GROUP 6: Rotary Drilling Machine when operated from console

GROUP 8: FORK-LIFT; TRACTOR

GROUP 9: PUMPS

GROUP 10:OILER

IRON0048-006 06/01/2013

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 23.10 12.88

TEAM0516-006 02/01/2015

Rates Fringes

TRUCK DRIVER

(3) Flatbed Truck...........$ 23.41 9.72

SUOK2012-014 05/18/2012

Rates Fringes

CARPENTER (Form Work Only).......$ 14.00 0.00

LABORER: Common or General......$ 10.00 0.00

LABORER: Pipelayer..............$ 11.00 0.30

OPERATOR: Backhoe...............$ 18.00 0.97

OPERATOR: Scraper...............$ 14.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

6/3/2016http://www.wdol.gov/wdol/scafiles/davisbacon/OK36.dvb?v=0

IRONWORKER, STRUCTURAL...........$ 23.10 12.88 (Fence Erecting)

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

ATTACHMENT NUMBER 0002

PAGE 1 0F 2

ATTACHMENT NUMBER 0002

ATTACHMENT NUMBER 0003

[offeror to insert changes, identifying change by clause number, title, date]

File details come from the government source that posted it. Updated .