00_01_10_-_Table_of_Contents_revised.pdf

PDF 18 KB Posted

Attached to
NK- SHOP BUILDINGS @ ENDERS & RED WILLOW
Solicitation number
R16PS00972
Issued by

About this file

Updated Table of Contents

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Shop Buildings Enders Dam and Red Willow Dam Solicitation No. R16PS00972

Table of Contents

00 01 10 - 1

TABLE OF CONTENTS

PART 1 – THE SCHEDULE

SECTION A – Solicitation, Offer and Award, Standard Form 1442

SECTION B – Schedule

SECTION C -- Description / Specifications

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 33 00 Submittals 01 35 20 Safety and Health 01 35 30 Contractors Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 56 15 Protection of Existing Utilities 01 60 00 Product Requirements 01 71 20 Surveying 01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS – NOT USED

DIVISION 03 - CONCRETE

03 30 00 Cast-In-Place Concrete

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS – NOT USED

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 05 Bathroom and Office Construction

DIVISION 07 through 12 – NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 30 Foundation and Metal Building System

DIVISION 14 - CONVEYING EQUIPMENT – NOT USED

00 01 10 - 2

DIVISION 15 – PLUMBING

15 15 00 Plumbing

DIVISION 16 through 25 – NOT USED

DIVISION 26 - ELECTRICAL

26 05 02 Electrical, Lighting, and Heating

DIVISION 27 through 51 – NOT USED

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D – Not used

SECTION E -- INSPECTION AND ACCEPTANCE

E.1 52.236-05 Material and Workmanship E.2 52.246-12 Inspection of Construction E.3 52.246-21 Warranty of Construction

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 Commencement, Prosecution, and Completion Of Work F.2 52.242-14 Suspension of Work

SECTION G -- CONTRACT ADMINISTRATION DATA

G.1 1452.201-70 Authorities and Delegations G.2 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)

SECTION H -- SPECIAL PURCHASE ORDER REQUIREMENTS

H.1 GP-7 Site Security

PART II – THE CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 52.252-02 Clauses Incorporated by Reference (See Table) I.2 52.230-99 Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements (Deviation) I.3 52.204-18 Commercial and Government Entity Code Maintenance I.4 52.215-08 Order of Precedence - Uniform Contract Format I.5 52.255-55 Minimum Wages Under Executive Order 13658 I.6 52.225-09 Buy American–Construction Materials I.7 52.228-01 Bid Guarantee I.8 52.228-02 Additional Bond Security I.9 52.228-15 Performance and Payment Bonds – Construction

00 01 10 - 3

I.10 52.232-05 Payments under Fixed-Price Construction Contracts I.11 52.232-27 Prompt Payment for Construction Contracts I.12 52.236-02 Differing Site Conditions I.13 52.236-13 Alt I Accident Prevention I.14 52.236-14 Availability and use of Utility Services I.15 52.236-21 Alt II Specifications and Drawings for Construction I.16 52.243-04 Changes I.17 1452.203-70 Restriction on Endorsements--Department of the

Interior I.18 1452.204-70 Release of Claims--Department of the Interior I.19 1452.215-70 Examination of Records by the Department of the Interior I.20 1452.228-70 Liability Insurance -- Department of the Interior I.21 1452.223-80 Asbestos-Free Warranty I.22 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I.23 WBR 1452.223-82 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace –

Bureau of Reclamation I.24 WBR 1452.228-84 Certification of Representatives for Corporate Sureties –

Bureau of Reclamation I.25 WBR 1452.231-81 Equipment Ownership and Operating Expense –

Bureau of Reclamation I.26 WBR 1452.232-81 Payment for Mobilization and Preparatory Work I.27 WBR 1452.233-81 Claims Accounting -- Bureau of Reclamation I.28 WBR 1452.236-08 Other Contracts I.29 WBR 1452.236-84 Preservation of Cultural Resources - Bureau of Reclamation I.30 WBR 1452.237-80 Security Requirements Bureau of Reclamation Alternate III

ALT III

I.31 WBR 1452.243-80 Modification Proposals - Bureau of Reclamation

ALT IV

PART III – DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENT NUMBER 0001 Department of Labor General Decision ATTACHMENT NUMBER 0002 Standard Form 24 – Bid Bond ATTACHMENT NUMBER 0003 Company Experience Reference List ATTACHMENT NUMBER 0004 Past Performance Questionnaire ATTACHMENT NUMBER 0005 Department of Interior Limitations on Subcontracting

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

K.1 52.203-98 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements—Representation

00 01 10 - 4

K.2 52.204-08 Annual Representations and Certifications K.3 52.209-07 Information Regarding Responsibility Matters

SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

L.1 52.204-07 System for Award Management (SAM) L.2 52.204-16 Commercial and Government Entity Code Reporting L.3 52.211-01 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR

Part 101-29 L.4 52.211-02 Availability of Specifications, Standards, and Data Item

Descriptions List in the Acquisition Streamlining and Standardization Information System (ASSIST)

L.5 52.214-34 Submission of Offers in the English Language L.6 52.214-35 Submission of Offers in U.S. Currency L.7 52.215-01 Instructions to Offerors – Competitive Acquisition L.8 52.216-01 Type of Contract L.9 52.222-05 Construction Wage Rate Requirements –

Secondary Site of the Work L.10 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction L.11 52.225-10 Notice of Buy American Requirement--Construction Materials L.12 52.236-27 ALT I Site Visit (Construction) – Alternate I L.13 52.236-28 Preparation of Proposals – Construction L.14 52.252-05 Authorized Deviations in Provisions L.15 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior L.16 1452.233-02 Service of Protest -- Department of the Interior L.17 WBR 1452.211-80 Notice of Intent to Acquire Metric Products and Services –

Bureau of Reclamation L.18 WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of Reclamation L.19 WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation L.20 WBR 1452.215-82 Technical Proposal Instructions – Bureau of Reclamation L.21 WBR 1452.215-83 Pricing Proposal Instructions – Bureau of Reclamation L.22 WBR 1452.236-86 Instruction for Mobilization and Preparatory Work Schedule

Line Item – Multiple Schedules – Bureau of Reclamation L.23 ET 02-20 Authorized Workers Notice to Potential Bureau of Reclamation Contractors

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 WBR 1452.215-88 Evaluation Factors for Award – Lowest Price Technically Acceptable Source Selection Process – Bureau of Reclamation M.2 WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations - Bureau

00 01 10 - 5

END OF CONTENTS

00 01 10 - 6

This page intentionally left blank.

File details come from the government source that posted it. Updated .