R15PS01326_Amendment_1.pdf
PDF 154 KB Posted
- Attached to
- Elvado Dam, NM Sonic Drilling Federal contract opportunity
- Solicitation number
- R15PS01326
About this file
R15PS01326 Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R15PS01326_Amendment_2.pdf | ||
| Attachment_C_DOI_Wage_Determination.docx | DOCX document | |
| B._Photographs_Foundation_(draft2_5-11-2015).pdf | ||
| HI.jpg-thumb.jpg | JPG image | |
| 3-100-667.jpg-thumb.jpg | JPG image | |
| R15PS01326 1 .pdf | ||
| 3-100-230.jpg-thumb.jpg | JPG image | |
| A._Photographs_Embankment_(draft2_5-11-2015.docx).pdf | ||
| Attachment_B_Pricing_Schedule.docx | DOCX document | |
| Plate_2.jpg-thumb.jpg | JPG image | |
| Figure_1_-_Contract_Sonic_El_Vado.docx | DOCX document | |
| PLATE_8.jpg-thumb.jpg | JPG image | |
| blk_can.jpg-thumb.jpg | JPG image |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R15PS01326
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Denver CO 80225
MS 84-27810
R81
Building 56 - Denver Federal Center Acquisition Operations Group Denver Office Bureau of Reclamation
004022228607/07/2015
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/07/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to revise section 2.5 Drill Hole Completion and 2.7.5 Well
Materials.
All potential quoters must be loaded in SAM.gov under NAICS 238990 All other specialty trade contractors size standard $15.0 MIL.
All other terms and conditions remain unchanged.
Delivery Location Code: 0008718777
See Attached Schedule
See Attached Schedule
See Attached Schedule CO 80235 US
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Rex Amicone
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
R15PS01326
FOB: Destination
00010 Traffic Control Plan
Delivery: 05/29/2016
00020 Mobilization
Delivery: 05/29/2016
00030 Drilling
Delivery: 05/29/2016
00040 Well completion
Delivery: 05/29/2016
00050 Sample retention
Delivery: 05/29/2016
00060 Core box delivery
Delivery: 05/29/2016
00070 Transducers
Delivery: 05/29/2016
00080 Travel
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 1 Page 3 of 3
Please remove current version of Section 2.5. Drill Hold Completion and replace with:
Section 2.5 Drill Hole Completion:
b. Well Installation and Completion: Wells shall be constructed with schedule 40, square-threaded, 2-inch-diamter PVC well screen (except DH-15-2 will be completed with 1.5-inch-diameter well screen and blank). A well cap or well point and a 1-foot-long PVC sump shall be added at the bottom of the well. A 10-foot-long, 010 slot size screen shall be installed above the sump at the bottom of the well. PVC blank will be installed to a few inches from the ground surface and the top will be closed with a PVC cap. The well will be backfilled with 10-20 filter pack sand around and 2 feet below and above the screen. Above the filter pack to 3 feet from the ground surface the annulus between the blank PVC and open drill hole wall will be backfilled with bentonite. In dry portions of the hole, bentonite shall be hydrated at least at every 5 vertical feet of depth by adding about 5 gallons of water per 50 pound bag of bentonite or as recommended by bentonite supplier. The top of the observation well shall be protected in an 1-foot-diameter steel DOT approved man-hole set flush with the asphalt road surface. Concrete shall be used to backfill and secure the man-hole from the bottom the asphalt surface to 3 feet of depth. Cold patch asphalt shall be used to backfill the gap between the man-hole and asphalt road. Within the man-hole, the annulus from ground surface to 1 foot of depth will be left open.
c. Drill hole DH-15-2 shall be constructed as detailed above, except 1.5-inch-diameter PVC schedule 40, square-threaded well materials shall be used.
Please remove current version of Section 2.7.5 Well Materials and replace with:
2.7.5 Well Materials:
a. PVC casing (blank), 2-inch diameter, schedule 40, flush joint, square-threaded.
b. PVC screen, 2-inch diameter, 010-inch slotted screen, schedule 40, flush joint, square thread.
c. Well point and cap(s), 2-inch diameter, schedule 40, flush joint, square-threaded, PVC.
d. Well materials for DH-15-2 will be 1.5-inch-diameter PVC, schedule 40, flush joint, square threaded.
e. 1-foot-diameter, steel, DOT approved man-hole.
f. Concrete -redi-mix concrete is acceptable.
g. Cold patch asphalt (patch potential gap between a man-hole and existing asphalt road surface).
File details come from the government source that posted it. Updated .