A._Photographs_Embankment_(draft2_5-11-2015.docx).pdf

PDF 2 MB Posted

Attached to
Elvado Dam, NM Sonic Drilling Federal contract opportunity
Solicitation number
R15PS01326
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment D- Picture 3

View the file

Other files for this federal contract opportunity

Other files attached to Elvado Dam, NM Sonic Drilling, newest first.
File Type Posted
R15PS01326_Amendment_2.pdf PDF
R15PS01326_Amendment_1.pdf PDF
R15PS01326 1 .pdf PDF
3-100-230.jpg-thumb.jpg JPG image
Attachment_B_Pricing_Schedule.docx DOCX document
Plate_2.jpg-thumb.jpg JPG image
Figure_1_-_Contract_Sonic_El_Vado.docx DOCX document
PLATE_8.jpg-thumb.jpg JPG image
blk_can.jpg-thumb.jpg JPG image
Attachment_C_DOI_Wage_Determination.docx DOCX document
B._Photographs_Foundation_(draft2_5-11-2015).pdf PDF
HI.jpg-thumb.jpg JPG image
3-100-667.jpg-thumb.jpg JPG image
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Photo 1: View looking northeast at the El Vado Dam. Photo by: J. Vauk, April 23, 2015.

Photo 2: View looking southwest toward the right abutment. Construction crews are placing embankment materials. Photo provided by the Middle Rio Grande Conservancy District, 1934.

Photo 3: View looking southeast at embankment material being placed on the right side of the dam. Steel plates welded together to form the upstream face of El Vado Dam are about 8 feet in height and 24 feet in width. Photo provided by the Middle Rio Grande Conservancy District, 1934.

Photo 4: View looking northeast at construction workers shoveling material behind the steel plate. Photo provided by the Middle Rio Grande Conservancy District, May 24, 1934.

Photo 5: View looking southeast at the location of a test hole and ring density test, TP-14-1, which was conducted near station 2+64. Photo by: R. Rinehart, April 8, 2014.

Photo 6: View looking down into test hole TP-14-1. The hole cut into the steel is approximately 3 by 3 feet. A 1-foot-diameter ring density test was conducted within TP-14-1.

Photo by R. Rinehart, April 8, 2014.

Photo 7: View looking down into test hole TP-14-3, conducted at about station 3+64.

The hole cut into the steel is approximately 3 by 3 feet.

Boulder-size sandstone fragments were encountered within the embankment behind the steel plate. Photo by R.

Rinehart, April 9, 2014.

Photo 8: View looking down into test hole TP-14-4, conducted at about station 6+89.

The hole cut into the steel is approximately 3 by 3 feet. Photo by R. Rinehart, April 9, 2014.