Revised Section B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R15PS00762_Amendment_0003.pdf | ||
| R15PS00762_Amendment_0003.pdf | ||
| R15PS00762_Amendment_0002.pdf | ||
| Sol_R15PS00762_Amd_000001.pdf | ||
| Summary_of_Work_Section_01_11_00.pdf | ||
| Sol_R15PS00762.pdf | ||
| R15PS00762.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Middle Point Road Construction Minimum Basic Access Belle Fourche Reservoir, South Dakota Solicitation No. R15PS00762
Supplies or Services and Prices
CONTINUATION OF – SECTION B – SUPPLIES OR SERVICES AND
PRICES
MIDDLE POINT ROAD CONSTRUCTION
MINIMUM BASIC ACCESS
BELLE FOURCHE RESERVOIR
BELLE FOURCHE UNIT – SOUTH DAKOTA
B.1 BID SCHEDULES
(a) Offers will be considered for award on the following schedules, but no offer will be considered for award on only a part of the schedules. Contract award will be made on Schedule A, however options from schedule B and C may be awarded at the option of the Government, based on available funding.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) The quantities in the schedules are estimated quantities for comparison of offers only and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for Contract Line Item Number (CLIN) 1.
SCHEDULE A – Middle Point Road Construction CLIN* Section Work or Materials Quantity and
Unit Unit Price
Amount
1) WBR
1452.23
2-81
Mobilization and Preparatory Work
For the lump sum of $
2) 31 23 40 Middle Point Roadway Embankment
1.6 Mile $ $
3) 31 27 32 Pit Run Material for Soft Spot Repair
6,000 Tons $ $
4) 33 42 30 Corrugated Metal Pipe (CMP) Culverts
10 Each $ $
5) 31 27 32 Limestone Gravel Surfacing on Middle Point Road
9,000 Tons $ $
6) 01 55 20 Road Signs 4 Signs $ $
Middle Point Road Construction Minimum Basic Access Belle Fourche Reservoir, South Dakota Solicitation No. R15PS00762
Supplies or Services and Prices
CLIN* Section Work or Materials Quantity and Unit
Unit Price
Amount
7) 32 92 20 Seed Middle Point Road Shoulders and Borrow Ditches.
5 Acres $ $
*CLIN – Contract Line Item Number
TOTAL FOR SCHEDULE A $_________________
OPTION SCHEDULE B – Two-Track Obliteration CLIN* Section Work or Materials Quantity and
Unit Unit Price
Amount
8) 31 14 20 Obliterate Undesignated Two-Track Roads.
2 Miles $ $
9) 32 92 20 Seed Obliterated Road Areas.
6 Acres $ $
TOTAL FOR SCHEDULE B $_________________
OPTION SCHEDULE C – Tequila Beach Parking Area Construction CLIN* Section Work or Materials Quantity and
Unit Unit Price
Amount
10) 31 23 41 Shape and Blade Tequila Beach Parking Area and Trails
1 Acre $ $
11) 31 27 32 Limestone Gravel Surfacing on Tequila Beach Parking Area
1,000 Tons $ $
TOTAL FOR SCHEDULE C $_________________
END OF SECTION