R1-2_and_PNM_PP.pdf

PDF 3 MB Posted

Attached to
UTILITY POTHOLING R1, 2, 3, & PNM STATION
Solicitation number
140R4023Q0095
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of the Interior Bureau of Reclamation. The solicitation seeks utility potholing services along Reaches 1, 2, 3 of an existing pipeline as well as at a PNM reservoir station. The utility potholing work is required to identify and locate any underground utility conflicts that may intersect with the planned pipeline realignment. The document identifies the specific reaches and locations where utility potholing is required and notes several areas of known utility conflicts along Reach 2. Solicitation number 140R4023Q0095 has been issued for these utility identification services.

View the file

Other files

File Type Posted
Sol_140R4023Q0095_Amd_0003.pdf PDF
WD_NM20230040_Heavy_Construction_Projects__San_Juan_County__NM_0002.pdf PDF
Sol_140R4023Q0095_Amd_0002.pdf PDF
Sol_140R4023Q0095_Amd_0001.pdf PDF
R3_Alignment_with_Pothole_Areas.pdf PDF
PWS_-_Reach_1-3_and_PNM_RPS_28JUL23.docx DOCX document
Bid_Form.xlsx XLSX spreadsheet
Sol_140R4023Q0095.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reach 1-2 & PNM River Pumping Plant Locations Identifies Reaches and shows locations of utility conflicts to be located.

:. Reach 2 Alignment

Utility Conflict Areas hquintana Callout Reach 1 Existing Pipeline hquintana Callout Reach 2 Proposed Pipeline hquintana Typewritten Text

PNM

hquintana Text Box N36 hquintana Text Box

NM 64

hquintana Text Box

NM 64

hquintana Text Box

CR 6700

hquintana Text Box

CR 6800

hquintana Text Box PNM Reservoir hquintana Callout End Reach 2 Begin Reach 3

File details come from the government source that posted it. Updated .