This is a Work Write-Up document from the City of Jackson, Michigan, for a residential roof and gutter replacement project located at 731 Woodlawn. The project involves stripping and replacing the roof on both the home and garage, along with installing new gutters on the home. Specific work includes removing existing shingles and felt, repairing roof framing, installing oriented-strand board sheathing, applying ice shield, adding new architectural shingles, and implementing a new gutter system. The project requires a permit and calls for approximately 18 linear feet of home roof replacement, 8 linear feet of garage roof replacement, and 210 linear feet of gutter work. The work is to be completed according to Michigan Building Code standards, with the homeowner selecting the shingle color.
The contract opportunity is being managed through the City of Jackson's e-Procurement Portal, with proposals to be received by Purchasing Coordinator Kari Kerstetter. The project is subject to various civil rights regulations and non-discrimination policies. While no pre-bid meeting is scheduled, contractors may contact the homeowner to assess the property. The document does not specify exact pricing, but indicates that contractors will be responsible for final measurements and must adhere to specific installation requirements, including using appropriate materials, maintaining proper roof pitch, and ensuring proper water diversion from the foundation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up R05 Strip and replace roof.
* EXHIBIT 1 *
Dated: 9/26/2024
CUSTOMER INFORMATION
731 Woodlawn Erika Mierzwa 731 Woodlawn, Jackson, MI 49203
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - R05 - ROOF - STRIP AND INSTALL Home (Specification ID:1.05000 Estimated Qty:18)
LF
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic.
Contractor responsible for final measurements.
There appears to be only one layer currently on the home, no sheeting will be required at this time but plan on approximately 100 sq ft of decking repair.
Note: The flat roof shall be strip also and a new modified or rubber roof shall be installed. To include removing the railing and installing a guard rail in between the doors.
Owner to choose color, the shingles shall be architectural shingles.
Owner________________
Contractor________________
Rehab__________________
2 - R05 - ROOF - STRIP AND INSTALL Garage (Specification ID:1.05000 Estimated Qty:8)
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic.
Contractor responsible for final measurements.
Color to match the home and be the same shingle in color and style. The garage roof also appears to have only one layer also. No new sheeting required at this time.
Note: the gutters on the garage will not be replaced, these will need to be saved and kept in place.
Owner____________
Contractor____________
Rehab_____________
3 - G08 - GUTTERWORK Home only (Specification ID:1.08000 Estimated Qty:210)
LF
Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size and be a seamless system. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S Contractor responsible for final measurements.
Downspouts shall be the commercial size.
To include the flat roof on the south side.
Gutter approx. liner ft. 130 Downspouts approx. Liner ft. 80
Subtotal for General Requirements
Total
Prepared By: sharrison@cityofjackson.org on 9/26/2024
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 9/26/2024 |
| 5 of 5 |
image1.png
File details come from the government source that posted it. Updated .