This document is a Work Write-Up prepared by the City of Jackson Community Development Department for a residential property located at 711 Third St in Jackson, Michigan. The scope of work includes multiple repair and renovation tasks: installing three interconnected smoke and carbon monoxide detectors, performing carpenter repairs to basement stairs and kitchen flooring, and a comprehensive roof replacement. The roof work specifically involves stripping the existing roof, repairing roof framing, installing new oriented-strand board sheathing, adding ice shield, applying new roofing felt, and installing architectural shingles. Additionally, the project includes gutter and downspout replacement with approximately 120 linear feet of gutters and 60 linear feet of downspouts.

The project is part of a competitive sealed bid process for repairs to program-qualified homeowners, with requirements that bidders must have Sam.gov registration, proper licensing, and obtain necessary permits. The work write-up is dated 1/24/2025 and indicates the contract will be awarded to the qualified lowest bidder. While specific pricing is not detailed in the document, the comprehensive scope suggests this is a rehabilitation project likely funded through a local community development program. The document includes spaces for owner and contractor signatures, indicating it will become part of the final construction contract once approved and accepted by both parties.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Write-Up R05 Strip and replace roof.

* EXHIBIT 1 *

Dated: 1/24/2025

CUSTOMER INFORMATION

Kitrina Sims 711 Third St, Jackson, MI 49203

PREPARED BY

sharrison@cityofjackson.org

* NOTE *

THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF

1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT

2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP

Location: Unassigned

Electrical System
Quantity
Units
Total

1 - Smoke Detector (Specification ID:80.00000 Estimated Qty:0)

EA

Install of a hard wire smoke and carbon monoxide detector in basement, to include interconnected if hardwire cannot be done, then radio frequency interconnect with 10-year lithium battery. Smokes according to MRC 2015.

Install of three, one in the basement one on the first floor, and one upstairs.

Floors & Stairs
Quantity
Units
Total

2 - GENERAL FLOOR & STAIR WORK

(Specification ID:55.00000 Estimated Qty:0)

Two different Carpentar repairs.

1. Install of one basement stair tread. The top stair tread is missing. Replacement of the tread shall be size for size the same as the existing, with the rise being equal to the existing. To include the cleats to hold the step-in place. Work shall be done in a workman like manner.

2. Kitchen. Cut out floor as best as possible for a sound repair. Replace decking with same thickness floor for a smooth transition and to allow a tile replacement to work. To include any structural repair needed. Replace tile in this area only and match as closely as possible. Work shall be done in a workman like manner.

3. Install in new sink base cabinet floor. Cut to size and done in a workmanlike manner. Material used shall be a finished one side, plywood, painted or stained.

General Requirements
Quantity
Units
Total

3 - R05 - ROOF - STRIP AND INSTALL

(Specification ID:1.05000 Estimated Qty:18)

Sq

* PERMIT REQUIRED *

Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic. Ridge venting when used shall cover the full length of the roof ridge. Installation of all materials shall follow manufacturer's printed instructions and G.S. 1.

Contractor is responsible for final measurement.

Approximately 17 squares on all elevations New roofing material type shall be architectural Shingles.

Manufacturer: __________ Color Name/Number: __________ Contractor's Initials: ____________________ Owner's Initials: __________ Rehab Spec:_____________

4 - G08 - GUTTERWORK

(Specification ID:1.08000 Estimated Qty:180)

LF

Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5 inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.

Contractor responsible for final measurements.

Downspouts shall be commercial size.

Approximately 120 linear feet of gutter on all elevation(s).

Approximately 60 linear feet of downspout on all elevation(sn) .

Subtotal for General Requirements

Total

Prepared By: sharrison@cityofjackson.org on 1/24/2025

OWNER ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.

x___________________________________
Owner:Date

CONTRACTOR ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.

x___________________________________
ContractorDate
x______________________________________
Construction SpecialistDate
Prepared By: sharrison@cityofjackson.org on 1/24/2025