R05_Strip_and_replace_roof._122_Rockwell.docx
DOCX document 34 KB Posted
- Solicitation number
- 2025-COMMUNITY DEVELOPMENT-020
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
This is a Work Write-Up document prepared by the City of Jackson, Michigan for a residential roof and gutter replacement project located at 122 Rockwell Street. The project involves stripping and replacing the roof on both the home and garage, which includes removing existing shingles and felt, repairing roof framing, installing oriented-strand board sheathing, applying ice shield, installing new architectural shingles (color to be selected by the owner), metal drip edges, valley treatments, and reflashing of chimneys and vents. Additionally, the scope includes installing approximately 160 linear feet of seamless gutters and downspouts on the home, with specifications for materials, pitch, and attachment methods. The project is part of a 2025 sealed proposal process managed through the City of Jackson's e-Procurement Portal, with contractors able to contact the homeowner to schedule property access and assess the project scope.
The work write-up indicates this is a rehabilitation project, likely funded through a municipal or community development program, with specific technical requirements adhering to the Michigan Building Code. While specific pricing is not detailed in the document, the project emphasizes precise technical specifications and compliance with local building standards. Contractors must demonstrate equal employment opportunity and comply with various civil rights regulations, including the Civil Rights Act and Michigan Civil Rights Act. The document provides a comprehensive technical specification for the roofing and gutter replacement, with space for owner and contractor signatures, suggesting this is a standardized municipal rehabilitation or home repair assistance program document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up R05 Strip and replace roof.
* EXHIBIT 1 *
Dated: 9/25/2024
CUSTOMER INFORMATION
HALL ROBERT
122 Rockwell St, , PREPARED BY sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - R05 - ROOF - STRIP AND INSTALL Home (Specification ID:1.05000 Estimated Qty:15)
Sq
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic.
Contractor responsible for final measurements.
Shingles shall be a architectural shingle, owner to pick color.
Owner:________________
Contractor:____________
Rehab:________________
2 - R05 - ROOF - STRIP AND INSTALL Garage (Specification ID:1.05000 Estimated Qty:8)
Sq
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic.
Contractor responsible for final measurements.
Shingles shall be a architectural shingle, owner to pick color.
Owner:________________
Contractor:____________
Rehab:________________
3 - G08 - GUTTERWORK Home only (Specification ID:1.08000 Estimated Qty:160)
LF
Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size and be a seamless system. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.
Contractor responsible for final measurements.
Downspouts shall be commercial size.
Approximately 100 linear feet of gutter on all elevation(s).
Approximately 60 linear feet of downspout on all_ elevation(sn).
Subtotal for General Requirements
Total
Prepared By: sharrison@cityofjackson.org on 9/25/2024
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 9/25/2024 |
| 5 of 5 |
image1.png