R05_Strip_and_replace_roof_148_Bates.docx

DOCX document 34 KB Posted

Attached to
148 BATES ST - ROOF & GUTTERS
Solicitation number
2025-COMMUNITY DEVELOPMENT-005
Issued by
Kalamazoo County, Huntington Woods City, Michigan

About this file

This is a Work Write-Up document prepared by the City of Jackson, Michigan for a residential roof and gutter replacement project located at 148 Bates Street in Jackson, Michigan. The project involves stripping and replacing the existing roof with new architectural shingles, installing 7/16" oriented-strand board sheathing, implementing ice shield and felt underlayment, adding metal drip and rake edges, reflashing chimney and vents, and installing new gutters and downspouts. The work includes approximately 100 linear feet of gutters and 60 linear feet of downspouts, with the project specifications dated 9/25/2024. Contractors are required to submit sealed proposals through the City of Jackson e-Procurement Portal, with no pre-bid meeting scheduled, but contractors may contact the homeowner to inspect the property.

The project appears to be part of a residential rehabilitation program, with specific technical requirements for roofing materials, installation methods, and gutter systems. Contractors must comply with various civil rights regulations and equal employment opportunity standards established by the City of Jackson. While specific budget or funding details are not explicitly stated, the document suggests this is likely a municipal-sponsored home repair initiative targeting residential property improvements. The work write-up includes precise technical specifications for roof and gutter replacement, emphasizing code compliance, material quality, and proper installation techniques.

View the file

Other files

File Type Posted
148_BATES_ST_-_ROOF_&_GUTTERS_(HOME).docx DOCX document
148_Bates_Contract_Checklist.pdf PDF
148_BATES_ST_-_ROOF_&_GUTTERS_(HOME).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Write-Up R05 Strip and replace roof.

* EXHIBIT 1 *

Dated: 9/25/2024

CUSTOMER INFORMATION

Robert Firth 148 Bates , Jackson, MI 49202

PREPARED BY

sharrison@cityofjackson.org

* NOTE *

THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF

1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT

2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP

Location: Unassigned

General Requirements
Quantity
Units
Total

1 - R05 - ROOF - STRIP AND INSTALL Home (Specification ID:1.05000 Estimated Qty:18)

* PERMIT REQUIRED *

Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic.

Contractor responsible for final measurements.

Garage currently is a metal roof; the owner will paint to match color of the home. Color as selected by owner and shall be a architectural shingle.

Owner_______________

Contractor_________

Rehab_______________

2 - G08 - GUTTERWORK Home only (Specification ID:1.08000 Estimated Qty:160)

LF

Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.

Approximately 100 linear feet of gutter on all elevation(s).

Approximately 60 linear feet of downspout on all elevation(sn).

Subtotal for General Requirements

Total

Prepared By: sharrison@cityofjackson.org on 9/25/2024

OWNER ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.

x___________________________________
Owner:Date

CONTRACTOR ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.

x___________________________________
ContractorDate
x______________________________________
Construction SpecialistDate
Prepared By: sharrison@cityofjackson.org on 9/25/2024