R-163003_Q and A_IQTC DATA DIT Anna Req0132839~2.docx

DOCX document 2 MB Posted

Attached to
IQTC Ethernet - DATA DIT Anna REQ0132839
Solicitation number
23-448DOIT-TELEC-B-35385
Issued by
Tazewell County, Illinois

About this file

This document is a question and answer (Q&A) related to a telecommunications and data infrastructure contract opportunity between the Illinois Department of Innovation and Technology (DoIT) and vendors. The contract is for the installation of new fiber optic cabling and equipment in the administration building of a campus in Anna, Illinois. Vendors are responsible for installing and maintaining the fiber optic cabling between buildings using the existing steam tunnels, as no trenching or boring on the grounds is allowed. A site walkthrough is highly advised, and the DoIT contact, Matt Pennell, can be reached to schedule surveys. The bid opening date has been extended to April 14, 2023.

The document does not provide details on pricing terms, set-asides, incumbents, funding requirements, or other salient financial information. It focuses solely on the technical aspects of the project, such as the fiber route, points of entry, and installation requirements.

View the file

Other files

File Type Posted
COVID-19 Protection Clause_9~44.docx DOCX document
R-163003_REQ0132389 SSF DHS Anna - 1 GB.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IQTC DATA DIT Anna Req0132839

23-448DOIT-TELEC-B-35385

March 21, 2023

Expending Bid Opening date to April 14, 2023 due to the request for additional information.

Question: Can you or someone in your engineering group provide us with a map of the fiber route and the distance from Minimal Point of Entry (MPOE) to the final demark in the Admin Building?

Answer: I have attached a picture of the campus in Anna. All new fiber/conduit will have to start at the southeast building/entrance. No trenching or boring is allowed on the grounds. All new conduit must be hung or mounted in the steam tunnels that are underground that go from building to building. New vendor equipment should be installed in the Administration building (outlined in red). Vendors are responsible for installing and maintaining the fiber in between buildings in the steam tunnels. It is highly advisable for vendors to meet onsite for a site walkthrough. We can get the stationary engineer’s contact information upon request. I can be the site contact for scheduling site surveys and you can use email, Matt.Pennell@illinois.gov and work cell: 618-300-8395.