This is a pre-bid meeting clarification document for the Steamboat Lake State Park Bridge Island Shade Shelters project administered by Colorado Parks and Wildlife. The project involves the construction of multiple shade shelter structures at Bridge Island within the state park. A pre-bid meeting was conducted on August 25, 2015, to address contractor questions regarding the project specifications and design documents. The clarifications provided cover critical technical specifications including steel gauge requirements, concrete finishing standards, structural component quantities, and material sourcing guidelines.

Key clarifications from the pre-bid meeting address several discrepancies in the contract documents and establish project requirements. Steel gauge specifications are to comply with 24 GA rather than 26 GA as indicated in conflicting plan details. All concrete will be non-tinted, contrary to the detail sheet notation. Manufacturers for structural components must be approved equals to the specified AMERIB brand and must demonstrate a minimum of five years manufacturing experience with the ability to provide detailed shop drawings for approval. The project requires five piers per structure consisting of three piers on the back and two on the front, not six anchor plates as initially shown. Concrete testing requirements follow Section 3290 standards, requiring sampling and testing for each 10 cubic yards of fresh concrete or fractional amounts, with a minimum of one test set per day of concreting. Pier drilling spoils may be disposed on-site at a designated location. The engineer's estimate for the project is $198,540.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Steamboat Lake State Park – Bridge Island Shade Shelters

QUESTIONS ASKED IN THE PRE-BID MEETING 8-25-2015, AND CLARIFICATION.

1. Note 2. On the details “26 GA.” conflicts with the with front elevation

“24 GA.”

RESPONSE

USE 24 GA.

2. Detail Sheet shows “Tinted Concrete”

RESPONSE

Tinted concrete shown on the Details sheet refers to a slab placement, this project does not have any slab placements.

All concrete will be non-tinted.

3. “AMERIB” as manufactured by American Steel Buildings, 12218 Robin Blvd., Houston, TX. called out in the specifications is out of business.

RESPONSE

Use an approved equal manufacturer. Manufacturer shall have a minimum of five years manufacturing experience, and have the ability to provide detailed shop drawings for approval..

4. Detail Sheet shows 1 of 6, 2 of 6, and 3 of 6, but only 3 sheets in plan set.

RESPONSE

Change Detail Sheet to 1 of 3, 2 of 3, and 3 of 3.

3 sheets in plan set.

5. Detail Sheet Calls for 6 anchor plates to be installed..

RESPONSE

The shade shelters being constructed require 3 piers on the “back” and two piers on the front for a total of five piers per structure.

6. How many concrete test are required.

RESPONSE

Per Section 3290, Extent of Tests: Take samples and make tests for each 10 cubic yards of fresh concrete or fractional amount placed in the project, but not less than one set of each day's concreting.

Steamboat Lake State Park – Bridge Island Shade Shelters

7. Can the spoils from the pier drilling be disposed of on – site?

RESPONSE

Yes, a disposal site is available on-site.

8. The engineer’s estimate for the project is $198,540.00