Questions_and_Answers_for_RFQ-2025-IDR6-003.pdf

PDF 27 KB Posted

Attached to
RFQ-2025-IDR6-003, Seeds
Solicitation number
0000036492
Issued by
California

About this file

This document is a Questions and Answers (Q&A) addendum for Request for Quotation (RFQ) 2025-IDR6-003 with Event ID 0000036492, pertaining to a seed delivery contract. The Q&A provides clarification on two key logistical aspects of the procurement: delivery scheduling and offloading capabilities. Specifically, the document indicates that the total 32,000 lbs. of seeds may be delivered across multiple days, offering flexibility in the delivery timeline.

Regarding offloading, the soliciting agency has confirmed they have a forklift available onsite to assist with unloading the seed shipment. No specific pricing details, set-asides, funding sources, or contract term lengths are outlined in this Q&A document, which appears to be focused solely on addressing potential vendor questions about delivery and logistics for the seed procurement.

View the file

Other files

File Type Posted
(DFW_1082)_Bidder_Declaration.pdf PDF
(CalRecyle74)_Posconsumer_Recycled-Content.pdf PDF
DVBE_Declaration_Form.pdf PDF
RFQ-2025-IDR6-003_(IWA_seed).docx DOCX document
(STD_204)_Payee_Data_Record_.pdf PDF
(DFW_1080)_Darfur.pdf PDF
(STD_817)_DVBE_Subcontrator_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for RFQ-2025-IDR6-003 (Event ID 0000036492)

Question 1: Will the entire 32,000 lbs. be delivered all at once, or split across multiple days?

Answer 1: The seeds may be delivered separately across multiple days.

Question 2: Do you require assistance will oƯloading, and do you have equipment like a liftgate or forklift available onsite?

Answer 2: We have a forklift onsite that may be used for oƯloading.

File details come from the government source that posted it. Updated .