This document is a Questions and Answers (Q&A) addendum for the Florida Department of Management Services (DMS) Telecommunications Infrastructure Project Services 3 Request for Proposals (RFP) No. DMS-24/25-264. The Q&A addresses 19 specific inquiries from potential bidders about the RFP, covering topics such as bidding requirements, labor rates, E-Rate invoicing, staffing documentation, technical specifications for equipment like battery backups and racks, and project scope. Key clarifications include confirmation that respondents may bid on only Division Two - E-Rate Category Two, all required documentation must still be submitted, labor rates must remain consistent within each region, and DMS will only be invoiced for non-discounted and ineligible items while service providers will handle E-Rate discount reimbursements directly with USAC.
The document indicates the project will cover all 67 counties across 10 regions, with specific technical and staffing requirements for telecommunications infrastructure services. Design and installation of structured cabling systems will be the contractor's responsibility, with potential drawing submittal requirements that may be waived if drawings are already provided. The project will use a Mini-Bid process for specific work within facilities, with details to be determined on an individual case basis. While precise quantities and site visit details are not predetermined, the RFP seeks to establish multiple statewide contracts with responsive and responsible respondents, with the Department reserving the right to award to one or multiple respondents across regions or make no award at all.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Telecommunications Infrastructure Project Services 3 Request for Proposals (RFP)
No. DMS-24/25-264
Questions and Answers
Questions and Answers
The Department has received the following questions and the Department’s answers are provided in the table listed below:
No. Question Answer
1. Will DMS confirm that a Respondent may bid on only Division Two – E-Rate Category Two?
Yes, Respondents may submit a proposal for only Division Two – E- Rate Category Two.
Refer to the RFP, Section 2.8, Basis of Award.
2. RFP, Page 9, Section 2.6.2
If a Respondent is only bidding on Division Two – E- Rate Category Two – are the requirements of this section still required - would the Respondent still need to provide a State of Florida electrical or low voltage license and a BICSI RCDD Certification?
Yes. All required documents in RFP, Section 2.6.2 are required.
3. Attachment C – Labor Prices
Can a Respondent bid multiple labor rates per region for different levels of expertise i.e. installer, engineering, project manager?
No.
The labor rates must remain the same per Region but may differ from Region to Region.
Refer to instructions in Attachment C, Pricing Workbook.
4. Attachment A – Section 4.7
Will the successful Respondent be billing the E-Rate customer or DMS?
DMS will be invoiced only for the non-discounted, and ineligible items of the invoice. The service provider will submit FCC Form 474 directly to USAC to request reimbursement for the discounted eligible services covered under the E-Rate discount.
Refer to Attachment A, Statement of Work (SOW), Section 4.7, E-Rate Invoicing.
5. In Attachment J, RFP Mandatory Responsive Requirements, it states:
“The Respondent must provide documentation of a valid and current Building Industry Consulting Service International (BICSI) Registered Communications Distribution Designer (RCDD) certification held by an individual currently employed by the Respondent.”
Yes.
In accordance with Attachment A, Statement of Work, either company staff, technicians, or the subcontractor may be utilized for the job.
Can the RCDD certification be held by a subcontractor or it must be held by a member of the prime firm?
Work, Section 4.5(f), Staffing Requirements and Responsibilities.
6. In Attachment D, Technical Proposal Instruction and Evaluation Criteria, it states:
“3. Proposed Staffing – The Respondent shall provide a narrative identifying key personnel assigned to this Contract”
Are you looking for resumes to be included or solely just narratives?
Yes, DivTel would prefer to see your company staff’s resumes and certifications.
Refer to Attachment D, Technical Proposal Instructions and Evaluation Criteria, Section 3. Proposed Staffing.
7. Can you please provide the technical specifications for the battery backup, along with the dimensions required for the requested racks?
Based on an Individual Case Basis.
Refer to Attachment A, Statement of Work, Section 5.5(c)(e), E-Rate Category Two Equipment and Services, Related Components, Uninterruptible Power Supply (UPS)/Battery Backup for details on Battery Backup. Refer to Attachment A, Statement of Work, Section 11.44, The Contractor will meet the following requirements for Racks and Cabinets.
8. Also, can you please confirm the quantities for each of these categories?
Based on an Individual Case Basis.
Work, Section 5.6, Mini-Bid Process.
Refer to Attachment A, Statement of Work, Section 6, Non-E Rate Quote Requests.
9. What are the technical specifications for the battery backup?
Work, Section 5.5(c)(e), E-Rate Category Two Equipment and Services, Related Components, Uninterruptible Power Supply (UPS)/Battery Backup for details on Battery Backup.
10. What are the dimensions required for the requested racks?
Standard server dimension and based on an Individual Case Basis.
Work, Section 11.44, The Contractor will meet the following requirements for Racks and Cabinets.
11. Do you have a required runtime for the UPS? Based on an Individual Case Basis.
Category Two Equipment and Services, Related Components, Uninterruptible Power Supply (UPS)/Battery Backup for details on Uninterruptible Power Supply (UPS).
12. Can you please confirm the quantities for each of these categories?
Refer to Attachment A, Statement of Work, Section 6, Non-E Rate Quote Requests.
13. Can you please provide the UPS specs required by your team for this 470 bid?
Category Two Equipment and Services, Related Components, Uninterruptible Power Supply (UPS)/Battery Backup for details on Uninterruptible Power Supply (UPS).
14. I did not see the plans. Are you going to supply them? Customers will use the Mini-Bid process to request in CSAB specific work within their facilities based on their own unique technological needs.
Refer to Attachment A, Statement of Work, Section 6, Non-E Rate Quote Requests.
15. Will the design be supplied by you, or is it part of the contractor’s scope?
The Contractor shall provide the design and installation of structured cabling systems. The drawing submittal requirement may be waived if drawings have been provided by DMS, the Project Contact, or Customer as part of the design.
Work, Section 3.2, Description of Scope. Refer to Attachment A, Statement of Work, Section 7.1(G), Project Commencement Submittals, Section G – Drawings.
16. Are the quantities for all sites included?
No.
Refer to Attachment M, Region Map
17. Will each site require a visit?
Work, Section 4.5(b), Staffing Requirements and Responsibilities.
18. How many sites are there? The Department does not have this information.
19. Does the project cover all 10 counties?
All 67 Counties will be covered across the 10 Regions.
Refer to Attachment M, Region Map.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK