Questions and Answers dated 11_01_26.docx

DOCX document 20 KB Posted

Attached to
Geotechnical Drilling, Umpqua River Bridge
Solicitation number
S-73000-00018235
Issued by
Douglas County, Oregon

About this file

This Questions and Answers document, dated November 1, 2026, addresses inquiries from prospective bidders regarding geotechnical drilling services for the Umpqua River Bridge project under Oregon Department of Transportation solicitation S-73000-00018235. The project requires eight geotechnical holes drilled from a barge at US 101 near Reedsport, Oregon, with drilling to extend approximately 65 to 90 feet below the water surface using mud rotary and/or casing advancer methods followed by HQ3T wireline coring. Quotes are due November 5, 2026, mobilization may begin on or after October 28, 2026, drilling must be completed within 15 consecutive business days, and final completion is due November 25, 2026. The contract term extends through January 30, 2027, with no work commencing until written Notice to Proceed is issued by the Owner's Contract Administrator.

Key clarifications provided in the Questions and Answers include ODOT's confirmation that no silt curtain requirement exists for the drilling operation, that borehole abandonment per Oregon Water Resources Department standards is the contractor's responsibility as part of the Scope of Work, and that minimal contingency scheduling has been built in for unforeseen circumstances such as higher tides. Notably, ODOT does not require an on-site safety diving crew for this project. The solicitation carries an Emerging Small Business set-aside requiring certification by Oregon's Certification Office for Business Inclusion and Diversity and performance of at least 51 percent of labor with the contractor's own workforce. Liquidated damages of $1,500 per business day apply for missed completion, and contractors must submit eight OWRD Geotechnical Hole Reports within 15 days of drilling completion.

View the file

Other files

File Type Posted
EXHIBIT 5_1 GENERAL AUTHORIZATION.pdf PDF
ATT A Form A.2 Bid Pricing Form.xlsx XLSX spreadsheet
00018235 ATT B.pdf PDF
00018235 Request for Competitive Quotes (RFCQ).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-73000-00018235 Geotechnical Drilling, Umpqua River Bridge November 1. 2026 Questions and Answers:

1. Does the DWR permit require a silt curtain around the drilling operation?

Answer: ODOT is not aware of any silt curtain requirement.

2. For hole abandonment, is ODOT requesting an OWRD "Special Standard" for sealing material and methods, or is this part of the drilling contractor's SOW?

Answer: ODOT does not request any special standard. Bore hole abandonment per OWRD is part of the SOW.

3. The schedule listed in OregonBuys is very tight though. Can you clarify the schedule and the contingency schedule(s) for winter flood events and other unforeseen circumstances?

Answer: The in-water work window on this stretch of river is short. ODOT has included a couple of days of float in the event of unforeseen circumstances, higher tides and such. We do not have contingency scheduled for any major unforeseen and out of our control type of event. If that were to occur we would work with the contractor to address it at that time.

4. Typically we are required to have a safety diving crew on site while drilling. Do you anticipate this being a safety requirement?

Answer: A safety dive crew on site, is not a requirement for this project.

End of Questions and Answers.