Questions - 657-19-200JB - Combined.pdf

PDF 120 KB Posted

Attached to
Z2DA--Renovate Space in Medical Rehabilitation Building for Adaptive Bowling 657-19-200JB
Solicitation number
36C25520R0135-0001
Issued by

About this file

This document contains questions and answers regarding a solicitation for the renovation of space in a medical rehabilitation building to create an adaptive bowling alley. Key details include that the project involves renovating existing space to install bowling equipment and make other facility modifications per the provided plans and specifications. Questions clarify requirements for infection control barriers, exhaust routing, negative air pressure, drilling into precast concrete, finishes for an unspecified room, and other construction aspects. The related federal contract opportunity is for solicitation number 36C25520R0135-0001 to renovate space at a Department of Veterans Affairs medical center to create an adaptive bowling alley, as identified in the opportunity description.

View the file

Other files

File Type Posted
36C25520R0135 0001.pdf PDF
657-19-200JB SingleSourceJustification Bowl Rite CO.pdf PDF
20201009 Site Walk Sign In.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for 657-19-200JB

Renovate Space in Medical Rehabilitation Building for Adaptive Bowling

1) Sheet 54-GI-101 & 54-GI-102

a) Key Note 2 on sheet 54-GI-102 states that the ICRA barrier wall is Type “A” plastic sheet barrier (see Type “A” on Sheet 54-GI-101). Type “A” is detailed on Sheet 54-GI-101 but does not indicate the location of the NPV monitor needed per ICRA Class III requirements. Please

Verify that the digital manometer is required per Class III specification.

i) NPV monitor is not required due to the building not being occupied by patients or public. Verify with COR this is still correct.

2) Sheet 54-GI-102, the ICRA-Operations Steps Document (middle top of sheet). The “Identify

Containment Measures Box” states that the Barrier Type is: Plastic Walls. However, the note below states that “boundary shared with public or patient care areas must have hard walls.”

Please clarify on the Basement Infection Control Plan (Sheet 54-GI-101, Detail drawing #1) which construction barriers will need to be “hard walls” as they are all noted to be Type “A”, Note #2, Plastic Sheet Barriers.

a) Because the building is not being occupied by patients or the public at this time, plastic sheet barriers are to be used for dust control. Verify with the COR that occupancy status has not changed.

3) Sheet 54-GI-102, Key Note #5 states “HEPA negative air unit, route exhaust outside of building in location directed by COR. Please provide exhaust routing drawing to exterior directed by COR.

This will need to be provided for bidding purposes.

a) This will need to be coordinated with the COR. Plans are not available at this time.

4) Sheet 54-GI-102, Detail drawing #1 “Basement Infection Control Plan” indicates only one (1) negative air machine (Note #5) needed to provide the necessary negative pressure ventilation of .01 WC. Please clarify if the contractor will need to provide the necessary amount of negative air machines to meet ICRA and Water Column requirements.

a) Yes, provide equipment necessary to comply with negative air requirements. Please note this location can vary.

5) We are to make (2) ¾” hot water taps on existing 4” hot water piping. What material is the existing 4” hot water lines made of?

a) Response: The 4” Heating water piping is steel.

6) The existing ceiling/deck in new bowling alley area is pre-cast concrete. Are there any special requirements for drilling into this ceiling for support hangers? If yes, please let us know what these requirements are?

a) Precast concrete contains prestressed tendons. Cutting or interrupting existing slab reinforcement is not permitted. Areas around anchorage points of the existing slab shall be examined with ground penetrating radar to directly identify existing reinforcement locations and to verify anchor installation will not interrupt slab reinforcement.

7) Sheet 53-AE-601, Room Finish Schedule does not include Room BA102A. Please provide room finishes for BA102A?

a) Existing finishes to remain. No finishes work this area except for patching damage caused by construction related activities. However, finishes would be paint and rubber base to match existing.

In review of the plans and specifications and in conjunction with sub-contractors, note the following questions.

In no specific order:

1) Confirm that project is being bid as “Tax Exempt”?

a) Yes

2) Provide exterior / site laydown area for on site storage of construction materials, trailer, dumpster, porta-jon etc. Provide a site plan showing this area.

a) This will need to be coordinated with the COR. Plans not available at this time.

3) Can site superintendent also be the SSHO and quality control on site

4) Is concrete testing required as all concrete used on the project is nonstructural.

Specifications:

1) Call for earthwork, foundation piles, foundation caissons and site work concrete. Confirm that this is NIC.

a) There is no site work on the project unless contractor damages site or building components during construction.

2) Fireproofing is called out in several locations. Provide clarification if this is required on the project. No details / information can be located.

a) Yes, fireproofing is required.

b) Fire rated partitions along the corridor and elevator lobby where doors are changed. Floor and ceiling assemblies do not require fireproofing.

3) Waterproofing 07 13 52:

a) Provide materials Basis of Design

i) GCP Bituthene 3000 or equal.

4) Interior Wood Door 08 14 00

a) Confirm existing frame for door BA 102A to be reused. Does this door have 1-1/2 pair butts?

Provide clarification that existing HM frame can be used to accept specified “Dutch” door assembly?

i) This frame currently has a standard swing door in it. The frame will need to be modified to accept a dutch door configuration.

5) Subsurface Preparation 09 05 16

a) Is this section required based on existing construction?

i) Yes. This section is required for any new finishes on either new or existing sub floor conditions.

b) Will calcium chloride testing be required?

i) Yes, per 3.2.G a anhydrous calcium chloride test is required

6) Schedule for Finishes 09 06 00

a) Clarify grout for PT-B-1 Base (NOT FOUND)

i) GR-A-1

b) Clarify LVT flooring transition strip specifications / material color?

i) Johnsonite Wheeled Traffic Transition 3/8” to 1/8”, color 29 Moon Rock

7) Gypsum Board 09 29 00

a) Is high impact drywall to be utilized around any part of the bowling alley?

i) No.

8) Fire Extinguisher Cabinet 10 44 13

a) Plans call for relocated units. Is this correct?

i) Partially. Based on existing plans of the facility, there is one FEC in the corridor that is to be relocated. Inside space BA102, FEC’s are to be new units with new extinguishers.

Architect understands there is an error on the elevations with Keynote 2 sheet 54-AE-401.

b) Are we to provide fire extinguishers? Specification?

i) Yes. Use a 3A:40B:C similar to Uline S-22291 or equal.

9) Bowling Equipment 11 90 00

a) Will GC be responsible for paying for the existing equipment dis-assembly, storage and relocation or just the installation?

i) Just the installation.

b) Confirm that Brunswick / Tom Westenberger will be responsible for ALL bowling equipment materials and assembly?

i) Actually, Bowl-Rite, Inc./Tom Westenberger is responsible for the installation of all bowling equipment. Brunswick Bowling Corp. is the equipment manufacturer/supplier and is not responsible in any way for the installation other than providing installation related guidelines that pertain directly to the equipment being installed.

c) GC is responsible for all labor related to this sub-contractor? Please verify

i) Yes, GC is responsible to carry the sub-contract for the bowling equipment installation.

d) Can Brunswick Comprehensive Planning Guide with all applicable sections highlighted be provided? What portion of this guide will the GC be responsible for above that of

Brunswick?

i) GC to be responsible for the pre-electrical requirements which are outlined in proposal from Bowl-Rite, Inc./Tom Westenberger which will be sent out by request to GC’s on

Tuesday 10/20/2020. A copy of the Brunswick planning guide will be included with each proposal.

10) Sprinkler 21 13 13

a) Can existing wet sprinkler system base building layout be provided?

i) Response: Yes. See attached FX100.

b) Provide existing piping hgts be provided?

i) Response: Existing Fire Sprinkler piping is 11’-7” above the existing concrete floor (Verify in the field).

11) Electronic Security 28 31 00

a) What is existing building F/A system brand and mfgr?

i) Per section 28 31 00: the fire alarm is Siemens.

Plans:

1) Sheet 54-SG-101

a) Clarify concrete slab finish for concrete to occur under bowling alley build up area?

i) Trowel finish for slabs under bowling alley build up area. BM

b) Detail 4:

i) Are new slabs as shown to be drilled and pinned into existing concrete slab? If required provide rebar size, spacing and embedment.

(1) Attachment of new turned down slab in detail 4 to existing slab not required. BM

ii) What is dimension of width of higher floor slab at bottom of haunch

(1) Width at bottom of haunch to be 12” minimum. BM

2) Sheet 54-AD-101

a) Raised platform-stairs South call for relocation of stair unit to Maint BA 102B.

i) Provide location of BA 102B?

(1) Can be found in multiple locations. See detail #1 sheet 54-AE-101

ii) Can platform-stair unit be moved as 1 component to this location?

(1) No.

iii) Provide existing method of attachment of this platform to existing construction

(1) It currently sits on steel angle legs w/ welded flat plates which rest on the existing slab. Edge of platform secured to existing wall w/ steel angles bolted to wall.

iv) Note 2 calls for relocation and partial use. Is remainder of platform to be disposed of or turned over to the VA?

(1) Remainder is to be disposed of.

v) Note 6 calls for removal of existing door for new “Dutch” door. Clarify that existing frame has sufficient hinging for new “Dutch” door (2 pair of existing hinges)?

(1) No. Existing frame will be modified to accept a dutch door.

vi) Note 8 calls for “Salvage door & frame” for reuse. Is his door become door BA102C or is door BA102C a new assembly?

(1) Yes, this door becomes BA102C.

3) Sheet 54-AD-110

a) Note 2 – provide existing sprinkler line heights above existing FF

i) Existing sprinkler lines are 138 ½” above existing FF of shell space.

4) Sheet 54-AE-101

a) Note 1: Calls for equipment by GC. If required to be installed by GC, provide specification and show quantities of all items

i) VA to provide all bowling equipment through Brunswick. GC to install bowling equipment coordinating with Brunswick rep. Equipment schedule seen on sheet 54-I-

601.

b) Note 3: Provide new method of anchorage of existing relocated stair assembly

i) Reuse existing steel angle legs and/or lag bolted steel angles to support relocated stair assembly.

c) Note 9: Is waterproofing membrane to be extended up existing wall to elevation of 1” below new finished bowling alley lane construction?

i) Yes.

d) Note 10: Provide specification of materials to match

i) Paint and rubber wall base per specifications 09 06 00, 09 65 13, and 09 91 00.

e) Are doors BA102B and BA102C fitting within existing masonry openings or do existing openings require alterations. Provide clarification

i) Existing openings will require alteration. Door will shift requiring the opening to be expanded on one side and infilled with new construction on the other.

5) Sheet 54-AC-101

a) Notes 1&2.

i) Provide details for items to be installed by e GC but require overhead structural support.

(1) Those monitors mount to the Brunswick provided truss. Contact Brunswick for all structural and mounting information.

6) Sheet 54-AE-601

a) Door type J / Dutch door: is door to have finished matching counter at split?

i) Yes.

b) Details 3 & 4: Provide total width of new/existing wall construction for new HM frame width.

This would be custom and be cost impactful. Can alternate detail be provided to allow for a std HM frame to be used with gypsum board jamb/header returns?

i) Yes, in lieu of using a wrapping frame, use standard frame with gypsum board finish to wrap the jambs. Use frame width similar to door BA102D. Frame and installation to be rated where required.

c) Section 6: Provide size of existing railing pipe size to be matched. Can existing stair / platform shop drawings be provided?

i) 1 ½” diameter handrails. Existing shop drawings would have to come from the VA.

d) Detail 7:

i) Provide clarification on vertical pipe railing diameter size

(1) Vertical pipe railing to be 1 ½” diameter.

ii) What is method of vertical railing post attachment into new raised floor? Are posts set in cups and grouted or flat plate bases bolted into slab?

(1) Flat plate bases are acceptable for this application.

7) Sheet 54 FP001

a) Provide existing sprinkler flow test information.

i) See existing FX series drawings for more information.

8) Sheet 54 FD101

a) Provide all existing piping hgts. above existing FF elevation.

i) See existing FX100 drawing. Existing Fire Sprinkler piping is 11’-7” above the existing concrete floor.

9) Sheet 54 PP101

a) Identify what lines to be relocated are supply and which are waste.

i) South of Column line D the Solid lines are waste and dashed lines are vent. The dash-dot lines are ½” water from the trap primer.

b) Provide locations of all related shutoffs.

i) Shut off water from trap primer at the trap primer. Shutoff for water to the sink in BA102A is in the Corridor CB-6.

10) Sheet 54 MH101

a) Note 5: define existing wall construction to be opened for new transfer grille.

i) 8” CMU and 4” steel stud at @ 24” O.C. with one-layer 5/8” gyp. board.

11) Sheet 54 E-401 / 54 E-501

a) New panel 54-N2 calls to reference detail 3 / E 54 E-501

i) The Detail number that should have been referenced would be 4.

b) Detail 4/54 E-501, provide the following clarification / information

i) What is the hgt. from floor / floor for the construction of the metal structural support?

(1) The height of the support for the panel should be such that no circuit breaker handle is higher than 72 inches and also provide support for the conduits to the ceiling. The conduits need to be supported per the NEC. Field conditions will dictate its height.

ii) Will the strut support fit in relations to the existing equipment as shown on 2/54 E-401?

(1) The support for the new panel 54-N2 a) should not allow the front of the panel to intrude into the 36” clear space in front of 54-L1 meaning that they can be at right angles to each other b) the back support needs to stop at the transformer TR-54-M1.

(a) Detail #4 on drawing 54-E-501 is a suggestion to the contractor as to how to support the panel. Another support may be to use a sheet of stiff sheet metal rather than metal strut. Field conditions will dictate its form and design.

12) Sheet 54 T-101

a) Note 3: provide detail for wireway and mounting hgt / clearances

i) Please refer to Specification 01 00 00 GENERAL REQUIREMENTS, section 1.3 Statement of

Bid Items. Please refer to Brunswick Bowling Alley Manufacturer’s Planning Guide for this detail.