Question Answers 11-21-2023 -Asked Questions.docx
DOCX document 18 KB Posted
- Attached to
- Fire Protection System/Equipment Testing Federal contract opportunity
- Solicitation number
- 36C24724Q0148
About this file
This document contains answers to questions regarding solicitation number 36C24724Q0148 for fire protection system and equipment testing services at Department of Veterans Affairs facilities in Columbia, South Carolina. The scope of work includes annual inspections of wet and dry sprinkler systems, fire pumps, standpipes, pre-action systems, flow switches, pressure switches, backflow preventers, hydrants, kitchen hoods, FM-200 systems, and dry chemical systems. It specifies that the previous contract did not include sprinkler/hood systems alone and that there is no incumbent contractor. Minor deficiencies were noted during the last inspection. The purpose of the document is to answer technical questions about inspection and testing requirements to support bidding on the new solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS Fire Protection System Testing.docx | DOCX document | |
| S02-36C24724Q0148 New RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24724Q0096 - 5 Year ITM for Columbia SC VA Fire Testing Question
1. How many wet sprinkler systems do we need to inspect? Please reference PWS
1. How many dry sprinkler systems do we need to inspect? Please reference PWS
1. How many fire pumps do we need to inspect? Please reference PWS
1. How many and type of standpipes do we need to inspect? Please reference PWS
1. How many pre-actions do we need to inspect? Please reference PWS
1. How many flow switches are there? Please reference PWS
1. How many pressure switches are there? Please reference PWS
1. How many backflow preventers do we need to inspect? Please reference PWS
1. How many hydrants do we need to flush? Please reference PWS
1. How many kitchen hoods do we need to inspect? Please reference PWS
1. How many FM-200 systems do we need to inspect? Please reference PWS
1. How many dry chemical systems do we need inspect? Please reference PWS
1. What value do we put in for CLIN 0012, 1012, 2012…etc, or do we leave that blank for now? blank
1. What is the value of the previous contract? N/A there was not a contract for Sprinkler/hood system alone
1. Who is the incumbent on the previous contract? N/A
1. Are there any deficiencies on the systems at this time? A couple missing hydraulic plates
1. Is this an existing or “new” contract opportunity? New 18 Does the VA have current inspection reports from the last two inspections? Yes
19. Who is the current service provider? N/A 20.What is the current schedule for inspections? Please reference PWS
File details come from the government source that posted it. Updated .