Question_&_Answer_Report_PD_25-26.098.pdf
PDF 84 KB Posted
- Attached to
- Bio-Health Pod Systems Stormwater Technology Demonstration and Suitability Evaluation Project- Re-Solicit
- Solicitation number
- PD 25-26.111
- Issued by
- Escambia County, Florida
About this file
This document is a Question & Answer Report issued by Escambia County Purchasing for RFQ No. PD 23-24.098, concerning Escambia County Dune Matrix Enhancement: Design, Permitting & CEI services. The response deadline for submissions was August 29, 2024 at 2:00 pm. The RFQ addresses inquiries from potential respondents regarding the scope of work and technical requirements for the project. Key clarifications provided indicate that no cost information is required in responses, a professionally licensed surveyor is preferred but not required for monitoring work, and beach profile surveys must extend at a minimum from R monuments to Mean Low Water. The contractor/consultant is responsible for conducting pre-construction beach profile and grain size monitoring within the project area to establish baseline conditions, while species monitoring including sea turtle nesting, shorebird monitoring, and beach mice tracking will be supplied by County or partner staff as supplemental data rather than the contractor's responsibility.
The document does not contain specific information regarding pricing terms, contract duration, renewal options, or funding sources. As an RLI (Request for Letter of Intent) process, no cost information is required from respondents at this stage. The questions answered address technical and operational requirements related to survey methodology, monitoring responsibilities, and the geographic scope of monitoring activities, with responses provided by County staff members Angela Jones and Samantha Bolduc on August 21, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Escambia County
Purchasing Lyndsey Stevens, Purchasing Director
213 Palafox Place, Pensacola, FL 32502-5822
(850) 595-4980
QUESTION & ANSWER REPORT
RFQ - Escambia County Dune Matrix Enhancement: Design, Permitting & CEI
QUESTION & ANSWER REPORT
RFQ No. PD 23-24.098
Escambia County Dune Matrix Enhancement: Design, Permitting & CEI
RESPONSE DEADLINE: August 29, 2024 at 2:00 pm
Thursday, August 20, 2026
Approved, Unanswered Questions
Approved, Answers Provided
1. No subject
Aug 21, 2024 1:35 PM
Question: Please confirm that no cost information is to be provided with this RLI for either the Respondent’s work or a future Contractor’s work.
Aug 21, 2024 1:35 PM
Answered by Angela Jones: Correct. RLI's do not have cost information.
Aug 21, 2024 1:39 PM
2. No subject
Aug 21, 2024 1:36 PM
Question: Is a professionally licensed surveyor required for the monitoring work? Assuming so, a) how far landward and seaward of the FDEP R-monument should the survey profiles extend, b) how far seaward of the MHWL should the survey extend, and c) accordingly, is a hydrographic survey required?
Aug 21, 2024 1:36 PM
Answered by Samantha Bolduc: A professionally licensed surveyor is preferred, but not required.
Monitoring must fulfill required metrics and beach profile surveys should, at a minimum, extend from the R monuments to Mean Low Water. A hydrographic survey is not required.
Aug 21, 2024 3:02 PM
QUESTION & ANSWER REPORT
RFQ No. PD 23-24.098 Escambia County Dune Matrix Enhancement: Design, Permitting & CEI
3. No subject
Aug 21, 2024 1:37 PM
Question: Please clarify the scope of the responsibilities of the selected contractor/consultant with regard to the pre-construction monitoring and the specific areas to be monitored, as well as the sea turtle nesting (which requires a designated permit-holder’s input), shorebird monitoring, and in particular the beach mice track tube utilization. Is the intent to track beach mice on State Park property and private property?
Aug 21, 2024 1:37 PM
Answered by Samantha Bolduc: Contractor/consultant should conduct pre-construction beach profile and grain size monitoring within project area to establish baseline conditions. Contractor will not be expected to conduct species monitoring; this will be supplied by County or partner staff as supplemental monitoring data.
Aug 21, 2024 3:02 PM
| QUESTION & ANSWER REPORT |
| RFQ No. PD 23-24.098 Escambia County Dune Matrix Enhancement: Design, Permitting & CEI |
| RESPONSE DEADLINE: August 29, 2024 at 2:00 pm |
| Approved, Unanswered Questions |
| Approved, Answers Provided |