Question 1 Drawing.pdf
PDF 431 KB Posted
- Solicitation number
- CRFQ 0603 ADJ2600000022 4
- Issued by
- Kanawha County, West Virginia
About this file
This is an architectural construction drawing for HVAC renovations at CFMO Building 1707 for the West Virginia Army National Guard. The document is a Reflected Ceiling Plan (Sheet A2.01) prepared by The Thrasher Group, Inc., dated June 26, 2026, and shows the ceiling layout and coordination requirements for the HVAC renovation project located at 1285 Aviation Drive, Williamstown, West Virginia 26187. The drawing specifies contractor responsibilities including removal and reinstallation of existing acoustical ceiling tile and grid at the same height, as well as removal and reinstallation of all ceiling-mounted items such as lights, detectors, security systems, and fire alarm equipment in their original locations.
The construction document requires coordination between the contractor and MEP (mechanical, electrical, and plumbing) drawings to ensure proper placement of new ductwork and HVAC equipment. The drawing is marked as construction documents and includes standard copyright protections indicating the plans are the sole property of The Thrasher Group, Inc. No specific pricing, timeline, or contracting terms are detailed within this architectural drawing; it serves as a technical specification document for the ceiling and HVAC-related work on the renovation project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. 5742
COOK
WILLIAM R.
S T A T E
O F W E S T
V
I R G I N I A
A R C H I T E
C T
SHEET No.
C
AD
F
IL
E:
PROJECT No.
DRAWN:
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
M
E:
U
SE
R
P (304) 624-4108
600 WHITE OAKS BLVD.
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2025
THE THRASHER GROUP, INC.
W
IL
L
IA
M S
T O
W N
A A
S F
A
V
IA
T
IO
N D
R
IV
E
W
IL
L
IA
M S
T O
W N
W
V
T60-11321
6/
/2
8:
:1
AM
Au to de sk
D oc s:
//W
VA
N
G C
FM
O
B
LD
G
H
VA
C R
EN
O
/2
5.
.0
- W
VA
N G
H
VA
C R en o
- E C
R
VT
_C O
PY
.rv t
J U
N E
Au th or
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A2.01
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
Author 06/22/26
REFLECTED CEILING
PLAN
Checker 06/22/26
W E
S T
V
IR
G
IN
IA
A
R M
Y N
A T
IO
N
A L G
U A
R D
NOTE:
1. CONTRACTOR TO REMOVE ALL EXISTING ACOUSTICAL CEILING TILE AND GRID. CONTRACTOR TO
INSTALL NEW ACOUTICAL TILE CEILING AND GRID AT SAME HEIGHT AS REMOVED CEILING.
2. CONTRACTOR TO REMOVE ALL ACOUSTIC CEILING MOUNTED LIGHTS, DETECTORS, SECURITY, FIRE ALARM, AND ALL OTHER CEILING MOUNTED ITEMS FOR REINSTALLATION. EXISTING DEVICES TO BE
REINSTALLED IN SAME LOCATION AS EXISTING.
3. CONTRACTOR TO COORDINATE WITH LOCATION OF NEW DUCTWORK AND HVAC EQUIPMENT AND
DEVICES. REFER TO MEP DRAWINGS.
| Sheets |
| A2.01 - REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .