Addednum 2.pdf

PDF 9 MB Posted

Attached to
Construction: CFMO Building 1707 HVAC Renovations
Solicitation number
CRFQ 0603 ADJ2600000022 4
Issued by
Kanawha County, West Virginia

About this file

This is Addendum 2 to a construction contract issued by the West Virginia Department of Administration for HVAC renovations at the CFMO Building 1707. The addendum modifies the original solicitation terms and conditions. Key modifications include clarifications on project scope, technical specifications, and contractor requirements for the HVAC system upgrade and renovation work. The addendum addresses questions and concerns raised by potential bidders during the bidding process and provides additional details necessary for accurate bid preparation and submission.

The addendum establishes revised specifications, clarifications on materials and equipment standards, and updates to project requirements that contractors must incorporate into their bid proposals. It ensures all prospective bidders have consistent and complete information for developing competitive proposals. The modifications supersede conflicting language in the original solicitation documents and become part of the binding contract terms for the selected contractor upon award.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Printed: Jul 1, 2026 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05

Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130

State of West Virginia Centralized Request for Quote

Proc Folder: 1990727 Reason for Modification:

Doc Description: Construction: CFMO Building 1707 HVAC Renovations Addendum No. 2

Proc Type: Central Purchase Order

Date Issued Solicitation Closes Solicitation No Version

2026-07-01 2026-07-08 13:30 CRFQ 0603 ADJ2600000022 3

BID RECEIVING LOCATION

BID CLERK

DEPARTMENT OF ADMINISTRATION

PURCHASING DIVISION

2019 WASHINGTON ST E

CHARLESTON WV 25305

US

VENDOR

Vendor Customer Code:

Vendor Name :

Address :

Street :

City :

State : Country : Zip :

Principal Contact :

Vendor Contact Phone: Extension:

FOR INFORMATION CONTACT THE BUYER

David H Pauline 304-558-0067 david.h.pauline@wv.gov

Vendor Signature X FEIN# DATE

All offers subject to all terms and conditions contained in this solicitation

Date Printed: Jul 1, 2026 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05

ADDITIONAL INFORMATION

Addendum No. 2

To respond to the Vendor Technical Questions, see attached.

To revise Specification M-1, see attachment.

To provide additional photos and drawings, see attached.

The Bid Opening Date & Time Remain July 8, 2026, at 1:30 PM EST.

No other changes.

INVOICE TO SHIP TO

ADJUTANT GENERALS

OFFICE

ADJUTANT GENERALS

OFFICE

1707 COONSKIN DR 1707 COONSKIN DR

CHARLESTON WV CHARLESTON WV

US US

Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 CFMO Building 1707 HVAC Renovations

Comm Code Manufacturer Specification Model #

72000000

Extended Description:

To input pricing see Exhibit "A" Bid Form

To provide Labor, materials and all associated costs to remove existing and replace with new HVAC system for the CFMO Building 1707 per the attached drawings & specifications.

SCHEDULE OF EVENTS

Line Event Event Date 1 Mandatory Prebid Meeting At 10:00 AM. EST. 2026-06-17 2 Vendor Technical Questions Due By 11:00 AM. EST. 2026-06-22

SOLICITATION NUMBER: CRFQ ADJ2600000022

Addendum Number: 2

The purpose of this addendum is to modify the solicitation identified as (“ADJ2600000022”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

☐ Modify bid opening date and time.

☒ Modify specifications of product or service being sought.

☒ Attachment of vendor questions and responses.

☐ Attachment of pre-bid sign-in sheet.

☐ Correction of error.

☒ Other.

Description of Modification to Solicitation:

To respond to the Vendor Technical Questions, see attached.

To revise Specification M-1, see attachment.

To provide additional photos and drawings, see attached.

The Bid Opening Date & Time remains July 8, 2026, at 1:30 PM EST.

No other changes.

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

DEPARTMENT OF THE ARMY

JOINT FORCES HEADQUARTERS WEST VIRGINIA

1707 COONSKIN DRIVE

CHARLESTON, WEST VIRGINIA 25311-1026

July 1, 2026

ADDENDUM NO. 2- CRFQ-ADJ2600000022

RE: Construction – CFMO Building 1707 HVAC Renovation West Virginia Army National Guard Charleston, WV 25311

TO: Prospective Bidders

FROM: West Virginia Army National Guard

NOTE: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents.

PART 1 – INFORMATION FOR BIDDERS

1. Responses to Questions

2. Answer for Question 1 and Question 1 Drawing (attached)

3. Answer for Question 3 Photo (attached)

4. Answer for Question 5 old spec & Answer for Question 5 new spec

Addendum 2 – Response for Questions

1. Please confirm ceiling work scope required to do the mechanical work - Type of tiles, specs, ceiling heights, reflected ceiling plan, etc?

a. See Answer.for.Question.7.attachment.―.Question.7.drawing.– Reflected Ceiling Plan and Specification Section 095113 – Acoustic Tile Ceiling

2. What is the existing fire alarm system?

a. Gamewell by Honeywell

3. Can you provide pictures of existing electrical service entrance to the building and existing MDP/Distribution? Is the new service a secondary service or will all existing panels be re-fed from new service.

a. See Answer.for.Question..9.Photo..attachment. The new service will be a secondary service, mainly to feed the new VAVs. New RTUs will be fed from existing electrical service.

4. Please confirm all existing hot water piping and devices are to be re-moved? Has the insulation been tested for asbestos?

a. Yes – Hot water piping to be removed. Based on the construction date of the building, asbestos is highly unlikely, however, should the contractor find suspected ACM the contractor should notify the Architect immediately

5. Do you have any old documents showing pipe routings? Most of the piping is concealed and cannot be observed.

a. See attached Answer.for.Question.❶.old.spec & Answer.for.Question.❶.

new.spec

6. Can the bid date be extended by about a week to allow for ceiling/electrical sub-contractors to visit the site?

a. The bid day has been extended to July 8th, 2026, at 1:30pm

No. 5742

COOK

WILLIAM R.

S T A T E

O F W E S T

V

I R G I N I A

A R C H I T E

C T

SHEET No.

C

AD

F

IL

E:

PROJECT No.

DRAWN:

CHECKED:

DATE:

DATE:

LA

YO

U T

TA

B:

PL

O

T D

AT

E/

TI

M

U

SE

R

P (304) 624-4108

600 WHITE OAKS BLVD.

P.O. BOX 940

BRIDGEPORT, WV 26330

www.thethrashergroup.com

F (304) 624-7831

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

THE INFORMATION CONTAINED HEREIN IS

THE SOLE PROPERTY OF THE THRASHER

GROUP, INC. REPRODUCTION OF THESE

DOCUMENTS IN WHOLE, OR IN PART FOR

ANY REASON WITHOUT PRIOR WRITTEN

PERMISSION IS STRICTLY PROHIBITED.

COPYRIGHT © 2025

THE THRASHER GROUP, INC.

W

IL

L

IA

M S

T O

W N

A A

S F

A

V

IA

T

IO

N D

R

IV

E

W

IL

L

IA

M S

T O

W N

W

V

T60-11321

6/

/2

8:

:1

AM

Au to de sk

D oc s:

//W

VA

N

G C

FM

O

B

LD

G

H

VA

C R

EN

O

/2

5.

.0

- W

VA

N G

H

VA

C R en o

- E C

R

VT

_C O

PY

.rv t

J U

N E

Au th or

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

A2.01

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

Author 06/22/26

REFLECTED CEILING

PLAN

Checker 06/22/26

W E

S T

V

IR

G

IN

IA

A

R M

Y N

A T

IO

N

A L G

U A

R D

NOTE:

1. CONTRACTOR TO REMOVE ALL EXISTING ACOUSTICAL CEILING TILE AND GRID. CONTRACTOR TO

INSTALL NEW ACOUTICAL TILE CEILING AND GRID AT SAME HEIGHT AS REMOVED CEILING.

2. CONTRACTOR TO REMOVE ALL ACOUSTIC CEILING MOUNTED LIGHTS, DETECTORS, SECURITY, FIRE ALARM, AND ALL OTHER CEILING MOUNTED ITEMS FOR REINSTALLATION. EXISTING DEVICES TO BE

REINSTALLED IN SAME LOCATION AS EXISTING.

3. CONTRACTOR TO COORDINATE WITH LOCATION OF NEW DUCTWORK AND HVAC EQUIPMENT AND

DEVICES. REFER TO MEP DRAWINGS.

West Virginia Army National Guard ADDENDUM 1 T60-11492

CFMO Building 1707 HVAC Renovation

ACOUSTICAL PANEL CEILINGS 095113 - 1

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes acoustical panels and exposed suspension systems for interior ceilings.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For each exposed product and for each color and texture specified.

1.4 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Reflected ceiling plans, drawn to scale, and coordinated with each other, using input from installers of the items involved.

B. Product test reports.

C. Research reports.

D. Field quality-control reports.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance data.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

1. Flame-Spread Index: Class A according to ASTM E 1264.

2. Smoke-Developed Index: 50 or less.

West Virginia Army National Guard ADDENDUM 1 T60-11492

ACOUSTICAL PANEL CEILINGS 095113 - 2

2.2 MINERAL FIBER ACOUSTICAL PANELS

A. Basis of Design Product:

1. Armstrong World Industries, Inc.

a. School Zone - Fine Fissured, Square Lay-in

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Armstrong World Industries, Inc.

2. CertainTeed Corporation.

3. USG Corporation.

C. Acoustical Panel Standard: Manufacturer's standard panels according to ASTM E 1264.

D. Classification: Mineral Fiber-Texture.

E. Color: White.

F. Light Reflectance (LR): 0.82.

G. Ceiling Attenuation Class (CAC): ASTM E1414.

H. Noise Reduction Coefficient (NRC): 0.70.

I. Edge/Joint Detail: Square

J. Thickness: 5/8 inch.

K. Modular Size: 24 by 24 inches.

2.3 METAL SUSPENSION SYSTEM

A. Basis of Design Product:

1. Armstrong World Industries, Inc.

a. Prelude ML 15/16” Exposed Tee System.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Armstrong World Industries, Inc.

C. Metal Suspension-System Standard: Manufacturer's standard, direct-hung, metal suspension system and accessories according to ASTM C 635/C 635M.

West Virginia Army National Guard ADDENDUM 1 T60-11492

ACOUSTICAL PANEL CEILINGS 095113 - 3

D. Wide-Face, Double-Web, Steel Suspension System: Main and cross runners roll formed from cold-rolled steel sheet; prepainted, electrolytically zinc coated, or hot-dip galvanized, G30 coating designation; with prefinished 15/16-inch-wide flanges.

1. Structural Classification: Intermediate-duty system.

2. End Condition of Cross Runners: butt-edge type.

3. Face Design: Flat, flush.

4. Cap Material: Cold-rolled steel or aluminum.

5. Cap Finish: Painted white.

2.4 ACCESSORIES

A. Attachment Devices: Size for five times the design load indicated in ASTM C 635/C 635M, Table 1, "Direct Hung," unless otherwise indicated. Comply with seismic design requirements.

2.5 METAL EDGE MOLDINGS AND TRIM

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Armstrong World Industries, Inc.

B. Roll-Formed, Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that comply with seismic design requirements; formed from sheet metal of same material, finish, and color as that used for exposed flanges of suspension-system runners.

PART 3 - EXECUTION

3.1 PREPARATION

A. Measure each ceiling area and establish layout of acoustical panels to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width panels at borders unless otherwise indicated.

B. Layout openings for penetrations centered on the penetrating items.

3.2 INSTALLATION

A. Install acoustical panel ceilings according to ASTM C 636/C 636M and manufacturer's written instructions.

West Virginia Army National Guard ADDENDUM 1 T60-11492

ACOUSTICAL PANEL CEILINGS 095113 - 4

B. Install edge moldings and trim of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical panels.

1. Do not use exposed fasteners, including pop rivets, on moldings and trim.

END OF SECTION 095113

SYMBOL LEGEND

DESCRIPTIONSYMBOL

EQUIPMENT SYMBOL - SEE LIST ON DWGS.

RIGID AIR DUCT SYSTEM

FLEXIBLE DUCT

MANUAL CONTROL DAMPER (W/LOCKING DEVICE0

CEILING SUPPLY DIFFUSER

CEILING RETURN OR EXHAUST GRILLE

DUCT SIZE INSIDE DIMENSIONS - 24"W x 10"D

DUCT SIZE - 10" DIAMETER

THERMOSTAT / SENSOR

PLAN NOTE

NEW TO EXISTING

POINT OF DEMOLITION

24”x10”

10ӯ

T S

A

DIFFUSER SYMBOL - SEE SCHEDULE

NECK SIZE

DESIGN CUBIC FEE PER MINUTE OF AIR

QUANITY FOR ROOM OR SPACE

D1 8ӯ

(2)

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

BF BELOW FLOOR

BCU BLOWER COIL UNIT

CFM CUBIC FEET PER MINUTE

COP COEFFICIENT OF PERFORMANCE

CU CONDENSING UNIT

DN DOWN

DB DRY BULB

DU DUCTLESS UNIT

EA EXHAUST AIR

EAT ENTER AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ECH ELECTRIC CEILING HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ESP EXTERIOR STATIC PRESSURE

EUH ELECTRIC UNIT HEATER

EWH ELECTRIC WALL HEATER

FD FIRE DAMPER

FPD FEET PER MINUTE

GC GENERAL CONTRACTOR

GUH GAS UNIT HEATER

KW KILOWATTS

HP HORSEPOWER

L LOUVER

LAT LEAVING AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MH MOUNTING HEIGHT

MBH THOUSAND BTU/HR

MOD MOTORIZED DAMPER

NIC NOT INCLUDED IN CONTRACT

NTS NOT TO SCALE

O.A. OUTSIDE AIR

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

SA SUPPLY AIR

SD SMOKE DETECTOR

SF SUPPLY FAN

STR STARTER (MOTOR)

TS TIP SPEED

TSP TOTAL STATIC PRESSURE

(TYP) TYPICAL

TZ TRANSFORMER

UNO UNLESS NOTED OTHERWISE

W/ WITH

WH WATER HEATER

WB WET BULB

W/O WITHOUT

WP WEATHER PROOF

GENERAL MECHANICAL NOTES:

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE HVAC SYSTEM AS INDICATED ON THE DRAWINGS,

AS SPECIFIED AND AS REQUIRED BY CODE.

2. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME

DAMPERS, ETC., ARE INDICATED FOR CLARITY IN CERTAIN AREAS. THIS DOES NOT

RELIEVE THE CONTRACTOR OF PROVIDING THESE ITEMS NOT SHOWN IN OTHER

AREAS AS REQUIRED FOR A COMPLETE INSTALLATION.

3. UNLESS NOTED OTHERWISE, LOCATE ALL ROOM THERMOSTATS 5'-0" ABOVE FINISH

FLOOR.

4. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

5. ALL DUCTWORK DIMENSIONS, AS SHOWN ON DRAWINGS, ARE INTERNAL CLEAR

DIMENSIONS. DUCT SIZE SHALL BE INCREASED IN SIZE TO COMPENSATE FOR

INTERNAL LININGS.

6. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL

PLANS, LIGHTING, AND OTHER ITEMS LOCATED IN CEILING.

7. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS, AND VALVING.

8. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO AIR

HANDLING UNITS, FANS, AND OTHER EQUIPMENT THAT REQUIRE VIBRATION

ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF

CONNECTION UNLESS NOTED OTHERWISE.

9. RUNS OF FLEXIBLE DUCTWORK SHALL NOT EXCEED 5 FEET.

10. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE

COPPER GROUNDING STRAPS.

11. TURNING VANES SHALL BE INSTALLED IN ALL RECTANGULAR DUCT ELBOWS THAT

EXCEED 45° CHANGE IN DIRECTION.

12. INSTALL 1" DUCTLINER IN FIRST 15' OF ALL RETURN AIR DUCTS.

13. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL

CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL INSTALL THE SMOKE

DETECTOR IN THE DUCTWORK.

14. CONTROL RELAYS SHALL BE WIRED BY THE ELECTRICAL CONTRACTOR. THE

MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE RELAY IN THE

EQUIPMENT.

1. COORDINATE HVAC DEMOLITION WITH OTHER TRADES AND GENERAL CONTRACTOR.

DO NOT DEMOLISH EQUIPMENT OR COMPONENTS WITHOUT APPROVAL.

2. UNDER NO CIRCUMSTANCE SHALL DEMOLITION CAUSE DAMAGE OR REMOVAL IN

WHOLE OR IN PART OF ANY STRUCTURAL MEMBER WITHOUT EXPRESS APPROVAL OF

THE GENERAL CONTRACTOR.

3. CAP AND PROTECT ANY EXPOSED EQUIPMENT, DUCT, PIPE OR ELECTRICAL CABLE /

CONDUIT THAT RESULTS FROM DEMOLITION. UNDER NO CIRCUMSTANCE WILL

DEMOLITION RESULT IN THE PERMANENT EXPOSURE OF ANY CHARGED OR LIVE

COMPONENT OR ANY EQUIPMENT TO BE RE-USED.

4. PROTECT ANY EQUIPMENT, SYSTEM, OR COMPONENT THEREOF THAT SHALL BE RE-

USED.

5. COORDINATE DISPOSAL OF ALL REMOVED ITEMS WITH THE GENERAL CONTRACTOR.

TURN OVER ANY COMPONENTS TO THE OWNER AS DESIGNATED IN CLEAN

CONDITION, WITHOUT DAMAGE, AND WITH OPENING SEALED. FURNISH RECEIPTS OF

PROPER DISPOSAL OF ALL ITEMS REMOVED TO THE GENERAL CONTRACTOR UPON

REQUEST. RECEIPTS SHALL INDICATE DISPOSAL IN ACCORDANCE WITH ALL LOCAL,

STATE AND FEDERAL REGULATIONS.

6. ALL DUCTWORK, PIPING AND EQUIPMENT SHOWN ON THE DRAWINGS WERE BASED ON

1981 AND 2026 BID DOCUMENTS, CONTRACTOR SHALL VERIFY ALL EXISTING DUCT AND

EQUIPMENT LOCATIONS PRIOR TO BID AND SHALL ADJUST INSTALLATION F NEW WORK

ACCORDINGLY AT NO ADDITIONAL COST TO OWNER.

DEMOLITION NOTES

VAV BOX SCHEDULE

VAV1-1

NOTES:

1-4TITUS DESV 325 4.5 SCR 55 95605 208/3

VAV 1-2

VAV 1-3

VAV 1-4

435 6.0 55 95700

310 4.0 55 95640

535 7.0 55 951080

305 4.0 55 95550

190 2.5 55 95415

330 4.5 55 95420

1-4

1-4

1-4

1-4

1-4

1-4

300 4.0 55 95635 1-4

445 6.0 55 95980 1-4

215 3.0 55 95525 1-4

125 2.0 55 95350 1-4

445 5.5 55 951010 1-4

280 3.5 55 95610 1-4

145 2.0 55 95360 1-4

200 2.5 55 95465 1-4

370 5.0 55 951060 1-4

220 3.0 55 95405 1-4

220 3.0 55 95450 1-4

670 9.0 55 951120 1-4

300 4.0 55 95695 1-4

210 3.0 55 95520 1-4

1. SINGLE-DUCT VAV TERMINAL UNIT WITH ELECTRIC REHEAT COIL WITH CONTROL PANEL, SCR ELECTRIC HEAT CONTROL, DIGITAL DISPLAY

ZONE SENSOR, 208/24 VOLT AND 480/24 VOLT TRANSFORMER.

2. DISCONNECT SWITCH AND POWER FUSE.

3. FOUR POINT AVERAGING TEMPERATURE SENSOR.

4. STANDARD ACTUATOR.

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

NOTES

MARK

SIZE

CFMCFM

KW

INLET

(VAV) HEATINGCOOLING

ELECTRIC REHEAT COIL

MANUFACTURER MODEL NO.

MAX. MIN.

STEPS (°F)

EAT

(°F)

LAT

(IN)

APDMBH VOLTS/PHASE

VAV 1-5

VAV 1-6

VAV 1-7

VAV 2-1

VAV 2-2

VAV 2-3

VAV 2-4

VAV 2-5

VAV 2-6

VAV 2-7

VAV 2-8

VAV 2-9

VAV 2-10

VAV 2-11

VAV 2-12

VAV 2-13

VAV 2-14

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

6" 8.54

10" 17.08

6" 10.24

6" 8.54

10" 30.74

6" 6.83

8" 11.95

10" 20.49

6" 6.83

8" 10.24

10" 20.49

8" 13.66

8" 10.24

8" 13.66

8" 15.37

6" 8.54

8" 13.66

10" 23.90

8" 13.66

8" 20.49

8" 15.37

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

RTU-1 AAON RN-013-3-0-GAAY-V0-21-000-A 2040 4410

1.05"

0.84"

5.0 2099

138.7

172.8

108.9

149.5

77.1/63.8 53/52

53/52

195.0

270.0

158.0

218.7

208/3

208/3

1-5

76.9/62.5

97.3

76.0 100.0 11.95/14.9

RTU-3 3490 0.75" 1701 102.2 91.21 53/52 158.0 106.376.7/62.1 65 90

RTU-2 2772

1868 208/3

86.0 110.0 11.17/15.19

49.0 70.0 12.84/15.783130 360

1-5

1-5

5.0

2.0

MANUF.

SEN. L.A.T.E.A.T.

MARK

NOTES:

MODEL NO. WEIGHT H.P.E.S.P. RPM

DB/WBMBH

TOTAL

MBH DB/WB MBH INPUT

TOTAL TOTAL

MBH OUTPUT

ROOFTOP UNIT SCHEDULE

CFM SUPPLY FAN COOLING HEATING

REMARKSVOLTS/PHASEL.A.T.E.A.T. MCA MOCP

1. PACKAGED DOWNFLOW VAV ROOFTOP UNIT WITH SINGLE POINT POWER WITH NON-FUSED DISCONNECT SWITCH, DUAL COMPRESSOR, PHASE FAILURE MONITOR, 2" THICK THROW AWAY FILTERS; POWERED CONVENIENCE GFi RECEPTACLE OUTLET; 100% COMPARATIVE ENTHALPY CONTROL ECONOMIZER WITH BAROMETRIC RELIEF DAMPER; EXHAUST FANS; HAIL GUARDS; MICROPROCESSOR CONTROLLER; BUILT IN DISCONNECT.

2. PROVIDE WITH FACTORY INSTALLED SENSORS FOR COIL LEAVING TEMP, DUCT HIGH LIMIT SWITCH, RETURN AIR TEMP, LEAVING AIR TEMP, RETURN AIR ENTHALPY, OUTSIDE AIR ENTHALPY, DIRTY FILTER, AND SUPPLY FAN AIR

PROVING.

3. PROVIDE CURB ADAPTOR.

4. PROVIDE WITH MODULATING GAS HEAT.

EER/IEERSUPPLY

AIR CFM

RETURN

AIR CFM

OUTSIDE

AIR CFM (MIN) QTY

AAON

AAON

RN-016-3-0-GAAY-V0-21-000-A

RN-011-3-0-GAAY-V0-21-000-A

5. PROVIDE RETURN AIR DUCT SMOKE DETECTOR.

MODEL NO.

NOTES:

MARK

EUH-1

KW BTU VOLTS / PHASE NOTESMANUFACTURER WEIGHT

(LBS)

QMARK MUH05-81 27 5.0 208/3 117.0

1. FAN-FORCED UNIT WALL HEATER WITH BUILT-IN THERMOSTAT; THERMAL OVERLOAD

PROTECTION; FAN DELAY SWITCH; POWER; MOUNTING BRACKETS.

EUH-2,3,4,5 QMARK MUH-10-8 38 10.0 208/3 134.1

EUH-6,7 QMARK MUH-15-8 53 15.0 208/3 151.2

ELECTRIC HEATER SCHEDULE

DESCRIPTIONUSEMODEL

NO.MANUFACTURERMARK NOTES

A. SIZE OF NECK FOR ABOVE ARE SHOWN ON PLAN.

B. SIZE OF GRILLE FOR ABOVE ARE SHOWN ON PLAN.

GENERAL NOTES:

1. STEEL

2. ALUMINUM

3. WHITE FINISH

NOTES:

D1

R1

R2

TITUS TMS

PAR

25RL

SUPPLY

RETURN

RETURN

SQUARE FULL LOUVER FACE CEILING DIFFUSER WITH FRAME

TYPE-3 FOR LAY-IN.

24"x24" SQUARE FLUSH PERFORATED FACE CEILING

DIFFUSER WITH FRAME TYPE-3 FOR LAY-IN.

1,3

2,3

2,3

TITUS

TITUS

D2 TITUS S300FS SUPPLY INDIVIDUALLY ADJUSTABLE BLADES DOUBLE DEFLECTION

GRILLE, WITH EXTRACTOR SET AT 45° ANGLE.

2,3

D3 TITUS 301RL SUPPLY ADJUSTABLE BLADES SUPPLY GRILLES WITH FRAME TYPE-1

FOR SURFACE MOUNT.

2,3

ADJUSTABLE BLADES RETURN GRILLES WITH FRAME TYPE-1

FOR SURFACE MOUNT.

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GAS LOAD SCHEDULE

SIZING IN ACCORDANCE WITH INTERNATIONAL FUEL CODE 2018,

TABLE 402.4 (2) SCHEDULE 40 METALLIC PIPE AT 7" WC AND 300'

TOTAL DEVELOPED LENGTH. VERIFY PRESSURES AND EQUIPMENT

BTUS, ADJUST SIZES ACCORDINGLY.

RTU-1

RTU-2

RTU-3 195

IDENTIFICATION GAS LOAD (MBH)

TOTAL CONNECTION 660

SHEET No.

C

AD

F

IL

PROJECT No.

DRAWN:

CHECKED:

DATE:

DATE:

LA

YO

U T

TA

B:

PL

O

T D

AT

E/

TI

M

U

SE

R

P (304) 624-4108

600 WHITE OAKS BLVD.

P.O. BOX 940

BRIDGEPORT, WV 26330

www.thethrashergroup.com

F (304) 624-7831

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

THE INFORMATION CONTAINED HEREIN IS

THE SOLE PROPERTY OF THE THRASHER

GROUP, INC. REPRODUCTION OF THESE

DOCUMENTS IN WHOLE, OR IN PART FOR

ANY REASON WITHOUT PRIOR WRITTEN

PERMISSION IS STRICTLY PROHIBITED.

COPYRIGHT © 2024

THE THRASHER GROUP, INC.

6/

/2

8:

:2

AM

Au to de sk

D oc s:

//W

VA

N

G C

FM

O

B

LD

G

H

VA

C R

EN

O

/W

VA

N G

_M

EP

_R

.rv t

JU

N

E

TT

G

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

M1.01

LE

G

EN

D

, N O

TE

S

SC

H

ED

U

LE

S

TTG 07/15/2025

T60-11492

W

VA

N G

C

FM

O B

LD

G

H

VA

C

R

EN

O

VA

TI

O

N

C H

AR

LE

ST

O

N , W

ES

T

VI

R

G

IN

IA

LEGEND, NOTES &

SCHEDULES

KES 07/15/2025

W

ES

T

VI

R G

IN

IA

A R

M Y

N

AT

IO

N

AL

G

U

AR

D

TT

G

/2 6/

AD

D

EN

D

U M

N O

.1

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.: CRFQ ADJ2600000022

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.

Failure to acknowledge addenda may result in bid disqualification.

Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

☒ Addendum No. 1 ☐ Addendum No. 6

☒ Addendum No. 2 ☐ Addendum No. 7

☐ Addendum No. 3 ☐ Addendum No. 8

☐ Addendum No. 4 ☐ Addendum No. 9

☐ Addendum No. 5 ☐ Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

1
1
2
Question 1 Drawing.pdf
Sheets
A2.01 - REFLECTED CEILING PLAN
Answer for Question 5 M-1 - Old Spec.pdf
SAB old bldg001
SAB old bldg002
SAB old bldg003
SAB old bldg004
SAB old bldg005
SAB old bldg006
SAB old bldg007
SAB old bldg008
SAB old bldg009
SAB old bldg010
SAB old bldg011
Answer for Question 5 M-1 - Old Spec.pdf
SAB old bldg001
SAB old bldg002
SAB old bldg003
SAB old bldg004
SAB old bldg005
SAB old bldg006
SAB old bldg007
SAB old bldg008
SAB old bldg009
SAB old bldg010
SAB old bldg011
Answer for Question 5 M-1 New spec.pdf
Sheets
M1.01 - LEGEND, NOTES & SCHEDULES

File details come from the government source that posted it. Updated .