Answer for Question 5 M-1 New spec.pdf

PDF 237 KB Posted

Attached to
Construction: CFMO Building 1707 HVAC Renovations
Solicitation number
CRFQ 0603 ADJ2600000022 4
Issued by
Kanawha County, West Virginia

About this file

This is a mechanical engineering specification sheet for HVAC renovation work at CFMO Building 1707 in Charleston, West Virginia, prepared by The Thrasher Group, Inc. for the West Virginia Army National Guard. The document provides detailed technical specifications for a complete HVAC system installation including symbol legends, abbreviations, general mechanical notes, demolition procedures, and equipment schedules. The project scope encompasses the installation of three rooftop units (RTU-1, RTU-2, and RTU-3), 27 variable air volume (VAV) terminal units with electric reheat coils, seven electric unit heaters (EUH-1 through EUH-7), and various ductwork, diffusers, grilles, and control components. The specifications detail specific manufacturer requirements (primarily Titus and AAON equipment), electrical connections (208/3 and 480/24 volt systems), and CFM (cubic feet per minute) requirements for each unit, with cooling capacities ranging from 620 to 5,685 CFM and heating loads specified for individual zones.

The document establishes comprehensive technical and operational requirements for contractors, including mandatory coordination with other trades, protection of existing equipment to be reused, proper cabling and grounding standards, and compliance with the International Fuel Code 2018 for gas sizing calculations. All ductwork is specified as Schedule 40 metallic pipe with internal clear dimensions, flexible connections at vibration-prone connections, and 1-inch ductliner in return air ducts. The project references 1981 and 2026 bid documents, with contractors required to verify existing conditions prior to bidding and adjust installation at no additional cost to the owner. The electrical connections range from 208/3 phase for VAV units and individual heaters to 480/24 volt transformers, with the total gas load specified at 660 MBH across the three rooftop units. The specification sheet was dated June 26, 2026, with Addendum No. 1 issued on July 15, 2025.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOL LEGEND

DESCRIPTIONSYMBOL

EQUIPMENT SYMBOL - SEE LIST ON DWGS.

RIGID AIR DUCT SYSTEM

FLEXIBLE DUCT

MANUAL CONTROL DAMPER (W/LOCKING DEVICE0

CEILING SUPPLY DIFFUSER

CEILING RETURN OR EXHAUST GRILLE

DUCT SIZE INSIDE DIMENSIONS - 24"W x 10"D

DUCT SIZE - 10" DIAMETER

THERMOSTAT / SENSOR

PLAN NOTE

NEW TO EXISTING

POINT OF DEMOLITION

24”x10”

10ӯ

T S

A

DIFFUSER SYMBOL - SEE SCHEDULE

NECK SIZE

DESIGN CUBIC FEE PER MINUTE OF AIR

QUANITY FOR ROOM OR SPACE

D1 8ӯ

(2)

ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

BF BELOW FLOOR

BCU BLOWER COIL UNIT

CFM CUBIC FEET PER MINUTE

COP COEFFICIENT OF PERFORMANCE

CU CONDENSING UNIT

DN DOWN

DB DRY BULB

DU DUCTLESS UNIT

EA EXHAUST AIR

EAT ENTER AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ECH ELECTRIC CEILING HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ESP EXTERIOR STATIC PRESSURE

EUH ELECTRIC UNIT HEATER

EWH ELECTRIC WALL HEATER

FD FIRE DAMPER

FPD FEET PER MINUTE

GC GENERAL CONTRACTOR

GUH GAS UNIT HEATER

KW KILOWATTS

HP HORSEPOWER

L LOUVER

LAT LEAVING AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MH MOUNTING HEIGHT

MBH THOUSAND BTU/HR

MOD MOTORIZED DAMPER

NIC NOT INCLUDED IN CONTRACT

NTS NOT TO SCALE

O.A. OUTSIDE AIR

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

SA SUPPLY AIR

SD SMOKE DETECTOR

SF SUPPLY FAN

STR STARTER (MOTOR)

TS TIP SPEED

TSP TOTAL STATIC PRESSURE

(TYP) TYPICAL

TZ TRANSFORMER

UNO UNLESS NOTED OTHERWISE

W/ WITH

WH WATER HEATER

WB WET BULB

W/O WITHOUT

WP WEATHER PROOF

GENERAL MECHANICAL NOTES:

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE HVAC SYSTEM AS INDICATED ON THE DRAWINGS,

AS SPECIFIED AND AS REQUIRED BY CODE.

2. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME

DAMPERS, ETC., ARE INDICATED FOR CLARITY IN CERTAIN AREAS. THIS DOES NOT

RELIEVE THE CONTRACTOR OF PROVIDING THESE ITEMS NOT SHOWN IN OTHER

AREAS AS REQUIRED FOR A COMPLETE INSTALLATION.

3. UNLESS NOTED OTHERWISE, LOCATE ALL ROOM THERMOSTATS 5'-0" ABOVE FINISH

FLOOR.

4. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

5. ALL DUCTWORK DIMENSIONS, AS SHOWN ON DRAWINGS, ARE INTERNAL CLEAR

DIMENSIONS. DUCT SIZE SHALL BE INCREASED IN SIZE TO COMPENSATE FOR

INTERNAL LININGS.

6. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL

PLANS, LIGHTING, AND OTHER ITEMS LOCATED IN CEILING.

7. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS

PANELS, CONTROLS, AND VALVING.

8. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO AIR

HANDLING UNITS, FANS, AND OTHER EQUIPMENT THAT REQUIRE VIBRATION

ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF

CONNECTION UNLESS NOTED OTHERWISE.

9. RUNS OF FLEXIBLE DUCTWORK SHALL NOT EXCEED 5 FEET.

10. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE

COPPER GROUNDING STRAPS.

11. TURNING VANES SHALL BE INSTALLED IN ALL RECTANGULAR DUCT ELBOWS THAT

EXCEED 45° CHANGE IN DIRECTION.

12. INSTALL 1" DUCTLINER IN FIRST 15' OF ALL RETURN AIR DUCTS.

13. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL

CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL INSTALL THE SMOKE

DETECTOR IN THE DUCTWORK.

14. CONTROL RELAYS SHALL BE WIRED BY THE ELECTRICAL CONTRACTOR. THE

MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE RELAY IN THE

EQUIPMENT.

1. COORDINATE HVAC DEMOLITION WITH OTHER TRADES AND GENERAL CONTRACTOR.

DO NOT DEMOLISH EQUIPMENT OR COMPONENTS WITHOUT APPROVAL.

2. UNDER NO CIRCUMSTANCE SHALL DEMOLITION CAUSE DAMAGE OR REMOVAL IN

WHOLE OR IN PART OF ANY STRUCTURAL MEMBER WITHOUT EXPRESS APPROVAL OF

THE GENERAL CONTRACTOR.

3. CAP AND PROTECT ANY EXPOSED EQUIPMENT, DUCT, PIPE OR ELECTRICAL CABLE /

CONDUIT THAT RESULTS FROM DEMOLITION. UNDER NO CIRCUMSTANCE WILL

DEMOLITION RESULT IN THE PERMANENT EXPOSURE OF ANY CHARGED OR LIVE

COMPONENT OR ANY EQUIPMENT TO BE RE-USED.

4. PROTECT ANY EQUIPMENT, SYSTEM, OR COMPONENT THEREOF THAT SHALL BE RE-

USED.

5. COORDINATE DISPOSAL OF ALL REMOVED ITEMS WITH THE GENERAL CONTRACTOR.

TURN OVER ANY COMPONENTS TO THE OWNER AS DESIGNATED IN CLEAN

CONDITION, WITHOUT DAMAGE, AND WITH OPENING SEALED. FURNISH RECEIPTS OF

PROPER DISPOSAL OF ALL ITEMS REMOVED TO THE GENERAL CONTRACTOR UPON

REQUEST. RECEIPTS SHALL INDICATE DISPOSAL IN ACCORDANCE WITH ALL LOCAL,

STATE AND FEDERAL REGULATIONS.

6. ALL DUCTWORK, PIPING AND EQUIPMENT SHOWN ON THE DRAWINGS WERE BASED ON

1981 AND 2026 BID DOCUMENTS, CONTRACTOR SHALL VERIFY ALL EXISTING DUCT AND

EQUIPMENT LOCATIONS PRIOR TO BID AND SHALL ADJUST INSTALLATION F NEW WORK

ACCORDINGLY AT NO ADDITIONAL COST TO OWNER.

DEMOLITION NOTES

VAV BOX SCHEDULE

VAV1-1

NOTES:

1-4TITUS DESV 325 4.5 SCR 55 95605 208/3

VAV 1-2

VAV 1-3

VAV 1-4

435 6.0 55 95700

310 4.0 55 95640

535 7.0 55 951080

305 4.0 55 95550

190 2.5 55 95415

330 4.5 55 95420

1-4

1-4

1-4

1-4

1-4

1-4

300 4.0 55 95635 1-4

445 6.0 55 95980 1-4

215 3.0 55 95525 1-4

125 2.0 55 95350 1-4

445 5.5 55 951010 1-4

280 3.5 55 95610 1-4

145 2.0 55 95360 1-4

200 2.5 55 95465 1-4

370 5.0 55 951060 1-4

220 3.0 55 95405 1-4

220 3.0 55 95450 1-4

670 9.0 55 951120 1-4

300 4.0 55 95695 1-4

210 3.0 55 95520 1-4

1. SINGLE-DUCT VAV TERMINAL UNIT WITH ELECTRIC REHEAT COIL WITH CONTROL PANEL, SCR ELECTRIC HEAT CONTROL, DIGITAL DISPLAY

ZONE SENSOR, 208/24 VOLT AND 480/24 VOLT TRANSFORMER.

2. DISCONNECT SWITCH AND POWER FUSE.

3. FOUR POINT AVERAGING TEMPERATURE SENSOR.

4. STANDARD ACTUATOR.

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

SCR

NOTES

MARK

SIZE

CFMCFM

KW

INLET

(VAV) HEATINGCOOLING

ELECTRIC REHEAT COIL

MANUFACTURER MODEL NO.

MAX. MIN.

STEPS (°F)

EAT

(°F)

LAT

(IN)

APDMBH VOLTS/PHASE

VAV 1-5

VAV 1-6

VAV 1-7

VAV 2-1

VAV 2-2

VAV 2-3

VAV 2-4

VAV 2-5

VAV 2-6

VAV 2-7

VAV 2-8

VAV 2-9

VAV 2-10

VAV 2-11

VAV 2-12

VAV 2-13

VAV 2-14

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

208/3

6" 8.54

10" 17.08

6" 10.24

6" 8.54

10" 30.74

6" 6.83

8" 11.95

10" 20.49

6" 6.83

8" 10.24

10" 20.49

8" 13.66

8" 10.24

8" 13.66

8" 15.37

6" 8.54

8" 13.66

10" 23.90

8" 13.66

8" 20.49

8" 15.37

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

TITUS DESV

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

RTU-1 AAON RN-013-3-0-GAAY-V0-21-000-A 2040 4410

1.05"

0.84"

5.0 2099

138.7

172.8

108.9

149.5

77.1/63.8 53/52

53/52

195.0

270.0

158.0

218.7

208/3

208/3

1-5

76.9/62.5

97.3

76.0 100.0 11.95/14.9

RTU-3 3490 0.75" 1701 102.2 91.21 53/52 158.0 106.376.7/62.1 65 90

RTU-2 2772

1868 208/3

86.0 110.0 11.17/15.19

49.0 70.0 12.84/15.783130 360

1-5

1-5

5.0

2.0

MANUF.

SEN. L.A.T.E.A.T.

MARK

NOTES:

MODEL NO. WEIGHT H.P.E.S.P. RPM

DB/WBMBH

TOTAL

MBH DB/WB MBH INPUT

TOTAL TOTAL

MBH OUTPUT

ROOFTOP UNIT SCHEDULE

CFM SUPPLY FAN COOLING HEATING

REMARKSVOLTS/PHASEL.A.T.E.A.T. MCA MOCP

1. PACKAGED DOWNFLOW VAV ROOFTOP UNIT WITH SINGLE POINT POWER WITH NON-FUSED DISCONNECT SWITCH, DUAL COMPRESSOR, PHASE FAILURE MONITOR, 2" THICK THROW AWAY FILTERS; POWERED CONVENIENCE GFi RECEPTACLE OUTLET; 100% COMPARATIVE ENTHALPY CONTROL ECONOMIZER WITH BAROMETRIC RELIEF DAMPER; EXHAUST FANS; HAIL GUARDS; MICROPROCESSOR CONTROLLER; BUILT IN DISCONNECT.

2. PROVIDE WITH FACTORY INSTALLED SENSORS FOR COIL LEAVING TEMP, DUCT HIGH LIMIT SWITCH, RETURN AIR TEMP, LEAVING AIR TEMP, RETURN AIR ENTHALPY, OUTSIDE AIR ENTHALPY, DIRTY FILTER, AND SUPPLY FAN AIR

PROVING.

3. PROVIDE CURB ADAPTOR.

4. PROVIDE WITH MODULATING GAS HEAT.

EER/IEERSUPPLY

AIR CFM

RETURN

AIR CFM

OUTSIDE

AIR CFM (MIN) QTY

AAON

AAON

RN-016-3-0-GAAY-V0-21-000-A

RN-011-3-0-GAAY-V0-21-000-A

5. PROVIDE RETURN AIR DUCT SMOKE DETECTOR.

MODEL NO.

NOTES:

MARK

EUH-1

KW BTU VOLTS / PHASE NOTESMANUFACTURER WEIGHT

(LBS)

QMARK MUH05-81 27 5.0 208/3 117.0

1. FAN-FORCED UNIT WALL HEATER WITH BUILT-IN THERMOSTAT; THERMAL OVERLOAD

PROTECTION; FAN DELAY SWITCH; POWER; MOUNTING BRACKETS.

EUH-2,3,4,5 QMARK MUH-10-8 38 10.0 208/3 134.1

EUH-6,7 QMARK MUH-15-8 53 15.0 208/3 151.2

ELECTRIC HEATER SCHEDULE

DESCRIPTIONUSEMODEL

NO.MANUFACTURERMARK NOTES

A. SIZE OF NECK FOR ABOVE ARE SHOWN ON PLAN.

B. SIZE OF GRILLE FOR ABOVE ARE SHOWN ON PLAN.

GENERAL NOTES:

1. STEEL

2. ALUMINUM

3. WHITE FINISH

NOTES:

D1

R1

R2

TITUS TMS

PAR

25RL

SUPPLY

RETURN

RETURN

SQUARE FULL LOUVER FACE CEILING DIFFUSER WITH FRAME

TYPE-3 FOR LAY-IN.

24"x24" SQUARE FLUSH PERFORATED FACE CEILING

DIFFUSER WITH FRAME TYPE-3 FOR LAY-IN.

1,3

2,3

2,3

TITUS

TITUS

D2 TITUS S300FS SUPPLY INDIVIDUALLY ADJUSTABLE BLADES DOUBLE DEFLECTION

GRILLE, WITH EXTRACTOR SET AT 45° ANGLE.

2,3

D3 TITUS 301RL SUPPLY ADJUSTABLE BLADES SUPPLY GRILLES WITH FRAME TYPE-1

FOR SURFACE MOUNT.

2,3

ADJUSTABLE BLADES RETURN GRILLES WITH FRAME TYPE-1

FOR SURFACE MOUNT.

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GAS LOAD SCHEDULE

SIZING IN ACCORDANCE WITH INTERNATIONAL FUEL CODE 2018,

TABLE 402.4 (2) SCHEDULE 40 METALLIC PIPE AT 7" WC AND 300'

TOTAL DEVELOPED LENGTH. VERIFY PRESSURES AND EQUIPMENT

BTUS, ADJUST SIZES ACCORDINGLY.

RTU-1

RTU-2

RTU-3 195

IDENTIFICATION GAS LOAD (MBH)

TOTAL CONNECTION 660

SHEET No.

C

AD

F

IL

E:

PROJECT No.

DRAWN:

CHECKED:

DATE:

DATE:

LA

YO

U T

TA

B:

PL

O

T D

AT

E/

TI

M

E:

U

SE

R

P (304) 624-4108

600 WHITE OAKS BLVD.

P.O. BOX 940

BRIDGEPORT, WV 26330

www.thethrashergroup.com

F (304) 624-7831

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

THE INFORMATION CONTAINED HEREIN IS

THE SOLE PROPERTY OF THE THRASHER

GROUP, INC. REPRODUCTION OF THESE

DOCUMENTS IN WHOLE, OR IN PART FOR

ANY REASON WITHOUT PRIOR WRITTEN

PERMISSION IS STRICTLY PROHIBITED.

COPYRIGHT © 2024

THE THRASHER GROUP, INC.

6/

/2

8:

:2

AM

Au to de sk

D oc s:

//W

VA

N

G C

FM

O

B

LD

G

H

VA

C R

EN

O

/W

VA

N G

_M

EP

_R

.rv t

JU

N

E

TT

G

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

M1.01

LE

G

EN

D

, N O

TE

S

SC

H

ED

U

LE

S

TTG 07/15/2025

T60-11492

W

VA

N G

C

FM

O B

LD

G

H

VA

C

R

EN

O

VA

TI

O

N

C H

AR

LE

ST

O

N , W

ES

T

VI

R

G

IN

IA

LEGEND, NOTES &

SCHEDULES

KES 07/15/2025

W

ES

T

VI

R G

IN

IA

A R

M Y

N

AT

IO

N

AL

G

U

AR

D

TT

G

/2 6/

AD

D

EN

D

U M

N O

.1

Sheets
M1.01 - LEGEND, NOTES & SCHEDULES

File details come from the government source that posted it. Updated .