Quantities for Replacing Hydrants Lowden State Park.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- DNR-Lowden-Yard Hydrant Replacement
- Solicitation number
- 21-422DNR-DIREC-B-17956
- Issued by
- Monroe County, Illinois
About this file
This document contains a quantity schedule for the replacement of yard hydrants at Lowden State Park in Illinois. The Illinois Department of Natural Resources (IDNR) is seeking bids for this project, which involves replacing 18 existing yard hydrants and associated concrete surfaces and drain pipes. The quantity schedule provides detailed information on the existing hydrant types, concrete surfaces, and drain pipe lengths at each of the 15 hydrant locations. The State of Illinois contract opportunity has an ID of 66ab32a17cf5b14e190bd12a and is named "DNR-Lowden-Yard Hydrant Replacement".
The pricing and other contract terms are not provided in this document. The quantity schedule indicates that the scope of work includes cleaning and restoring the existing drain pipes at each location, which suggests that the contractor will be responsible for ensuring the proper functioning of the drainage system. No information is given about any set-asides, incumbents, funding sources, or other salient contract details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan View of Lowden State Park Yard Hydrant Replacement.pdf | ||
| Scope of Work - Large .docx | DOCX document | |
| Special Provisions for Lowden Yard Hydrants~1.docx | DOCX document | |
| Standard Certifications~28.doc | DOC document | |
| Yard Hydrant detail~2.jpg | JPG image | |
| Forms A Section V.18.1~61.doc | DOC document | |
| Location Map for Lowden Yard Hydrant.pdf | ||
| SMALL CONSTRUCTION BID FORM~63.docx | DOCX document | |
| Detailed Drawings~1.pdf | ||
| Forms B 1~3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantities
| #1-20-003 Yard Hydrant Replacement |
| Lowden State Park |
Quantity Schedule
| Existing | Concrete | PCC | * | ||||
| Hydrant | Surface | Removal | Sidewalk 5" | Drain | Pipe | ||
| Location | Type | sq ft | sq ft | each | foot | Remarks | |
| 1 | S4H | concrete | 0 | 0 | 0 | 0 | 4' vault w/ 6'x5' concrete lid |
| 2 | S4H | concrete | 16 | 86 | 1 | 20 | |
| 3 | S4H | concrete | 16 | 113.5 | 1 | 20 | |
| 4 | S3 | concrete | 16 | 36 | 1 | 20 | |
| 5 | S3 | concrete | 25 | 36 | 1 | 20 | |
| 6 | S3 | concrete | 16 | 52.5 | 1 | 20 | |
| 7 | S3 | concrete | 25 | 36 | 1 | 20 | |
| 8 | S3 | dirt | 0 | 0 | 0 | 0 | aggregate CA7 detail |
| 9 | S3 | concrete | 36 | 36 | 0 | 0 | |
| 10 | S3 | dirt | 0 | 0 | 0 | 0 | aggregate CA7 detail |
| 11 | S3 | dirt | 0 | 0 | 0 | 0 | aggregate CA7 detail |
| 12 | S3 | dirt | 0 | 0 | 0 | 0 | aggregate CA7 detail |
| 13 | S3 | concrete | 36 | 36 | 1 | 20 | |
| 14 | S3 | concrete | 0 | 0 | 0 | 0 | 4' vault w/ 6'x5' concrete lid |
| 15 | S3 | dirt | 0 | 0 | 0 | 0 | aggregate CA7 detail |
| 186 | 432 | 7 | 140 |
| * Note- Pipe size may vary. Match to existing pipe size. The length of pipes at each |
| location is an estimate. Existing pipe must be cleaned out to function by |
| jetting, flushing,rodding or any other means exceptable by IDNR. |
File details come from the government source that posted it. Updated .