QualityAssurance_Plan_Malta_BLM_Road_Grading.pdf

PDF 77 KB Posted

Attached to
BLM MALTA FIELD OFFICE ROAD GRADING Federal contract opportunity
Solicitation number
140L3625Q0032
Issued by
Department of the Interior Bureau of Land Management

About this file

This document is a Quality Assurance Plan for road grading performed by the Bureau of Land Management (BLM) Malta Field Office. The worksheet provides a detailed evaluation standard for road maintenance, with specific performance requirements marked as either Satisfactory (S) or Unsatisfactory (U). Key performance standards include grading to the specified profile for drainage, preventing moisture flow towards cattle guards, minimizing aggregate material loss, removing loose rocks larger than 6 inches, eliminating berms or ridges, and addressing road surface defects such as ruts, potholes, and washboard areas by cutting out and smoothly refilling to create a uniform surface. The standards are referenced to specific section codes (17301-1.04 A and 17301-3.01 D), indicating precise technical requirements for road maintenance and repair work.

View the file

Other files for this federal contract opportunity

Other files attached to BLM MALTA FIELD OFFICE ROAD GRADING, newest first.
File Type Posted
B03_WD_MT20250079_01_03_2025.pdf PDF
B08_Past_Performance_Questionnaire.doc DOC document
A06_Drawings_Malta_BLM_Road_Grading.pdf PDF
A04_Specs_Malta_BLM_Road_Grading.pdf PDF
Sol_140L3625Q0032.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

Quality Assurance Plan

MFO ROAD GRADING Evaluation Worksheet Inspector: ________________________

Date Inspected: ___________________

S = Satisfactory … U = Unsatisfactory

WORK REQUIREMENTS

Standard of Performance

S U

Grading to the specified profile for drainage 17301-1.04 A Preventing moisture flow towards cattle guards and appurtenances. 17301-1.04 A

Minimize the loss of aggregate material, where present 17301-3.01 D

Removal of loose rock larger than 6” from the road surface. 17301-3.01 D

Eliminate berms or ridges where present 17301-3.01 D Shall have ruts, potholes, and washboard cut out to the bottom of the defect or bottom of subgrade, and smoothly refilled to a uniform surface.

17301-3.01 D

Quality Assurance Plan

File details come from the government source that posted it. Updated .