Quality Assurance Surveillance Plan (QASP) and Matrix .pdf
PDF 307 KB Posted
- Attached to
- Hyster High Lift Maintenance Services
- Solicitation number
- N0018926QL012
About this file
This document is a Quality Assurance Surveillance Plan (QASP) that establishes Government oversight mechanisms for monitoring contractor performance under a Performance Based Service Contract (PBSC). The QASP is not part of the contract itself but serves as a Government-developed tool to ensure the contractor meets specified performance metrics and quality standards, with the understanding that the contractor remains responsible for its own quality control and management. The Contracting Officer retains ultimate responsibility for determining the adequacy of contractor performance, while the Contracting Officer's Representative (COR) implements day-to-day surveillance activities. The Government employs multiple surveillance methods including customer feedback (from satisfaction surveys and formal complaints), random monitoring, and random checks/inspections to verify compliance with contract terms.
The QASP Matrix identifies four primary performance elements subject to surveillance: Contract Deliverables (requiring 100% inspection with an acceptable quality level of ≥95% submitted timely without rework), Services PWS Tasks (subject to random inspection with all tasks performed in accordance with the Performance Work Statement), Invoicing (monthly review requiring 95% accuracy), and Overall Contract Performance (annual assessment requiring a Satisfactory or higher rating). The Government may issue Contract Discrepancy Reports (CDRs) for items failing to meet acceptable levels, requiring the contractor to respond within five days with a plan to prevent future occurrences. Contractors failing to achieve satisfactory performance risk contract termination and loss of future Government contracts, while successful performance is incentivized through the contractor's ability to avoid costly rework requirements and maintain good standing for future opportunities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination 2015-4341 Rev. 32.pdf | ||
| Solicitation - N0018926QL012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN AND MATRIX
1.0 PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with the performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2.0 AUTHORITY
Authority for issuance of this QASP is provided under FAR 52-212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the Contracting Officer or their duly authorized representative.
3.0 SCOPE
The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet quality standards set forth by the contract. The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan. The Government may provide the Contractor an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4.0 RESPONSIBLILIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contraction Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) – An individual designated in writing by the
Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for the COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5.0 METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP. The QASP Matrix describes the methods of surveillance that may be used to monitor the services and deliverables to be provided under the contract.
Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in withing the detailed nature of the complaint, must be signed and must be forwarded to the Contractor. The Contractor shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
Random Monitoring – Random monitoring shall be conducted if and when deemed necessary to ensure compliance with the terms of the contract. The COR will conduct the random monitoring.
Random Checks/Inspections – Random checks will be conducted to ensure compliance with the terms of the contract. The COR will conduct the random monitoring.
6.0 IDENTIFIED QA SURVEILLANCE ITEMS
The PBSC items that have been identified for surveillance are identified in the Performance Work Statement
(PWS).
7.0 DOCUMENTATION
The COR will maintain a complete Quality Assurance Surveillance file. The file shall contain such documents as copies of all receiving reports, evaluations, recommendations, and any other actions related to the Government’s performance of the quality assurance function. All such records will be retained for the life of this contract.
8.0 ANALYSIS OF CONTRACTOR PERFORMANCE
The analysis of the contractor performance shall be conducted at the end of each month an serves to provide a summary of the Contractor’s performance to the Contracting Officer and the Contractor. Overall performance is important in determining whether to increase, decrease or maintain the current level of surveillance and/or whether to initiate corrective action to bring the Contractor’s work up to the standards of the specification.
QASP MATRIX
Performance Element
Performance Requirement
Surveillance
Method
Frequency
Acceptable
Quality Level
Contract Deliverables
Contract deliverable furnished as prescribed in the PWS.
Inspection by the COR
100% inspection of all contract deliverables
>95% of deliverables submitted timely and without rework required.
Services PWS Tasks
The contractor shall provide support services IAW the Performance Work Statement(PWS)
Inspected by the COR
Random
All tasks performed IAW
PWS
Invoicing
Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly
95% accuracy
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR annual report on Contractor Performance.
Assessment by the COR
Annual
All performance elements rated Satisfactory ( or higher)
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
INCENTIVES/DISINCENTIVES:
The COR will make an annual report on Contractor Performance (CPRS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the COR’s annual report, may result in termination of the contract and may also result in the loss of future Government contracts.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.