Attachment B - Price Schedule - Georgia National Cemetery.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- QSE--36C78625Q50199
About this file
The file is a Price Schedule for Grounds Maintenance Services at the Georgia National Cemetery, detailing a comprehensive contract with 52 separate line items across a base year and four option years. The schedule covers an extensive range of services including turf maintenance, landscaping, burial support, and facility upkeep, with specific quantities for each service such as 32 weeks of mowing, 1,000 gravesites for sod installation, 260 daily committal shelter setups, and 1,920 headstone receivings. Although all current pricing entries show $0.00, the document provides a detailed breakdown of expected service volumes and types, encompassing grounds care, interment support, cleaning, chemical treatments, and infrastructure maintenance across approximately 91.9 developed acres and 778.4 undeveloped acres at the cemetery.
The associated federal contract opportunity specifies this is a Service-Disabled Veteran-Owned Small Business set-aside solicitation for the Department of Veterans Affairs National Cemetery Administration, with a contract period from June 1, 2025 to May 31, 2030 (base year plus four option years). The NAICS code is 561730 with a $9.5 Million business size standard. Key requirements include providing a minimum of twelve employees and one site supervisor, limiting subcontracting to 50% with veteran-owned businesses, and maintaining the cemetery as a national shrine. Proposals are due by 2:00 PM EST on April 28, 2025, with a mandatory site visit on April 8, 2025, and evaluation prioritizing past performance and technical approach over pricing.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| Georgia National Cemetery - Grounds Maintenance Services | ||||||||
| BASE YEAR | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 0001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 0002 | B.4.1.2 | Mowing of Buffer Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 0003 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 0004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 0005 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0006 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 0007 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 0008 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 0009 | B.4.1.9 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | MO | $0.00 | 12 | $0.00 | Service | |
| 0010 | B.4.1.9 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 Min) | $0.00 | 400 | $0.00 | Service | |
| 0011 | B.4.1.10 | Mowing areas with a push Lawn Mower | Wk | $0.00 | 32 | $0.00 | Service | |
| 0012 | B.4.2.4 | Mulching HARDWOOD BLEND all - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | Service | |||
| 0013 | B.4.2.4 | Mulching - Long Needle Pinestraw - Removal, Replenish and/or Install All Areas | JB | $0.00 | 2 | $0.00 | Service | |
| 0014 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | MO | $0.00 | 12 | $0.00 | Service | |
| 0015 | B.4.3.2 | Tree Maintenance-(All tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 2 | $0.00 | Service | |
| 0016 | B.4.4.1 | Casket / Vault Gravesite Sod Installation: CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | EA | $0.00 | 1000 | $0.00 | Service | |
| 0017 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | EA | $0.00 | 20 | $0.00 | Service | |
| 0018 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | EA | $0.00 | 40 | $0.00 | Service | |
| 0019 | B.4.4.2 | Core Aerification (Aeration) - Approx 45 acres -As specified | JB | $0.00 | 1 | $0.00 | Service | |
| 0020 | B.4.4.3 | Fertilization- All Turf Areas(Bermuda) See Warm Season Flow Chart | JB | $0.00 | 5 | $0.00 | Service | |
| 0021 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 0022 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 0023 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 0024 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 0025 | B.4.5.1 | Insecticide (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 0026 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 0027 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 0028 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 0029 | B.4.8.4 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 0030 | B.4.9.1 | CASKET TRANSPORTATION | EA | $0.00 | 1000 | $0.00 | Service | |
| 0031 | B.4.9.1 | CHAIN OF CUSTODY | EA | $0.00 | 1000 | $0.00 | Service | |
| 0032 | B.4.9.2 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | Service | |
| 0033 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 0034 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 0035 | B.4.10.3 | Entrance Ways, Bridge concrete wall, Memorial Walk, Walls, Caps, Areas under signs, trash, and Floral Receptacles. | JB | $0.00 | 2 | $0.00 | Service | |
| 0036 | B.4.10.4 | Flag Assembly Area and Ceremonial Pavilion area | JB | $0.00 | 2 | $0.00 | Service | |
| 0037 | B.4.10.5 | Columbarium, Ceremonial Walls, and Marble Niche Covers/Memorial Markers | JB | $0.00 | 2 | $0.00 | Service | |
| 0038 | B.4.10.6 | Committal Shelters | QTR | $0.00 | 4 | $0.00 | Service | |
| 0039 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 0040 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 0041 | B.4.11.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 260 | $0.00 | Service | |
| 0042 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 0043 | B.4.11.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | Service | |
| 0044 | B.4.11.4 | Janitorial Services (Administration Building, Maintenance and Public Information Center) | MO | $0.00 | 12 | $0.00 | Service | |
| 0045 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 100 | $0.00 | Construction | |
| 0046 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 100 | $0.00 | Construction | |
| 0047 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 15000 | $0.00 | Construction | |
| 0048 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 1920 | $0.00 | Construction | |
| 0049 | B.4.8.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | EA | $0.00 | 1700 | $0.00 | Construction | |
| 0050 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 1100 | $0.00 | Construction | |
| 0051 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 600 | $0.00 | Construction | |
| 0052 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 500 | $0.00 | Construction | |
| Base Year Total Cost | $0.00 |
| OPTION YEAR 1 | |||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | |||
| 1001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 32 | $0.00 | Service | ||
| 1002 | B.4.1.2 | Mowing of Buffer Areas | WK | $0.00 | 32 | $0.00 | Service | ||
| 1003 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 32 | $0.00 | Service | ||
| 1004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 32 | $0.00 | Service | ||
| 1005 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1006 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1007 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | ||
| 1008 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | ||
| 1009 | B.4.1.9 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | MO | $0.00 | 12 | $0.00 | Service | ||
| 1010 | B.4.1.9 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 Min) | $0.00 | 400 | $0.00 | Service | ||
| 1011 | B.4.1.10 | Mowing areas with a push Lawn Mower | Wk | $0.00 | 32 | $0.00 | Service | ||
| 1012 | B.4.2.4 | Mulching HARDWOOD BLEND all - Removal, Replenish and/or Install All Areas | |||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | Service | ||||
| 1013 | B.4.2.4 | Mulching - Long Needle Pinestraw - Removal, Replenish and/or Install All Areas | JB | $0.00 | 2 | $0.00 | Service | ||
| 1014 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | JB | $0.00 | 12 | $0.00 | Service | ||
| 1015 | B.4.3.2 | Tree Maintenance-(All tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 2 | $0.00 | Service | ||
| 1016 | B.4.4.1 | Casket / Vault Gravesite Sod Installation: CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1017 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | EA | $0.00 | 20 | $0.00 | Service | ||
| 1018 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | EA | $0.00 | 40 | $0.00 | Service | ||
| 1019 | B.4.4.2 | Core Aerification (Aeration) - Approx 45 acres -As specified | JB | $0.00 | 1 | $0.00 | Service | ||
| 1020 | B.4.4.3 | Fertilization- All Turf Areas(Bermuda) See Warm Season Flow Chart | JB | $0.00 | 5 | $0.00 | Service | ||
| 1021 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | ||
| 1022 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | ||
| 1023 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | ||
| 1024 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | |||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | ||||
| 1025 | B.4.5.1 | Insecticide (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | ||
| 1026 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | ||
| 1027 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | ||
| 1028 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | ||
| 1029 | B.4.8.3 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1030 | B.4.9.1 | CASKET TRANSPORTATION | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1031 | B.4.9.1 | CHAIN OF CUSTODY | EA | $0.00 | 1000 | $0.00 | Service | ||
| 1032 | B.4.9.2 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | Service | ||
| 1033 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | $900.00 | |
| 1034 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | ||
| 1035 | B.4.10.3 | Entrance Ways, Bridge concrete wall, Memorial Walk, Walls, Caps, Areas under signs, trash, and Floral Receptacles. | JB | $0.00 | 2 | $0.00 | Service | ||
| 1036 | B.4.10.4 | Flag Assembly Area and Ceremonial Pavilion area | JB | $0.00 | 2 | $0.00 | Service | ||
| 1037 | B.4.10.5 | Columbarium, Ceremonial Walls, and Marble Niche Covers/Memorial Markers | JB | $0.00 | 2 | $0.00 | Service | ||
| 1038 | B.4.10.6 | Committal Shelters | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1039 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | ||
| 1040 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | ||
| 1041 | B.4.11.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 260 | $0.00 | Service | ||
| 1042 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | ||
| 1043 | B.4.11.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | Service | ||
| 1044 | B.4.11.4 | Janitorial Services (Administration Building, Maintenance and Public Information Center) | MO | $0.00 | 12 | $0.00 | Service | ||
| 1045 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 100 | $0.00 | Construction | ||
| 1046 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 100 | $0.00 | Construction | ||
| 1047 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 15000 | $0.00 | Construction | ||
| 1048 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 1920 | $0.00 | Construction | ||
| 1049 | B.4.8.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | EA | $0.00 | 1700 | $0.00 | Construction | ||
| 1050 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 1100 | $0.00 | Construction | ||
| 1051 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 600 | $0.00 | Construction | ||
| 1052 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 500 | $0.00 | Construction | ||
| Option Year 1 Total Cost | $0.00 |
| OPTION YEAR 2 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 2001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 2002 | B.4.1.2 | Mowing of Buffer Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 2003 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 2004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 2005 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2006 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 2007 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 2008 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 2009 | B.4.1.9 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | MO | $0.00 | 12 | $0.00 | Service | |
| 2010 | B.4.1.9 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 Min) | $0.00 | 400 | $0.00 | Service | |
| 2011 | B.4.1.10 | Mowing areas with a push Lawn Mower | Wk | $0.00 | 32 | $0.00 | Service | |
| 2012 | B.4.2.4 | Mulching HARDWOOD BLEND all - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | Service | |||
| 2013 | B.4.2.4 | Mulching - Long Needle Pinestraw - Removal, Replenish and/or Install All Areas | JB | $0.00 | 2 | $0.00 | Service | |
| 2014 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | JB | $0.00 | 12 | $0.00 | Service | |
| 2015 | B.4.3.2 | Tree Maintenance-(All tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 2 | $0.00 | Service | |
| 2016 | B.4.4.1 | Casket / Vault Gravesite Sod Installation: CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | EA | $0.00 | 1000 | $0.00 | Service | |
| 2017 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | EA | $0.00 | 20 | $0.00 | Service | |
| 2018 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | EA | $0.00 | 40 | $0.00 | Service | |
| 2019 | B.4.4.2 | Core Aerification (Aeration) - Approx 45 acres -As specified | JB | $0.00 | 1 | $0.00 | Service | |
| 2020 | B.4.4.3 | Fertilization- All Turf Areas(Bermuda) See Warm Season Flow Chart | JB | $0.00 | 5 | $0.00 | Service | |
| 2021 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 2022 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 2023 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 2024 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 2025 | B.4.5.1 | Insecticide (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 2026 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 2027 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 2028 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 2029 | B.4.8.3 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 2030 | B.4.9.1 | CASKET TRANSPORTATION | EA | $0.00 | 1000 | $0.00 | Service | |
| 2031 | B.4.9.1 | CHAIN OF CUSTODY | EA | $0.00 | 1000 | $0.00 | Service | |
| 2032 | B.4.9.2 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | Service | |
| 2033 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 2034 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 2035 | B.4.10.3 | Entrance Ways, Bridge concrete wall, Memorial Walk, Walls, Caps, Areas under signs, trash, and Floral Receptacles. | JB | $0.00 | 2 | $0.00 | Service | |
| 2036 | B.4.10.4 | Flag Assembly Area and Ceremonial Pavilion area | JB | $0.00 | 2 | $0.00 | Service | |
| 2037 | B.4.10.5 | Columbarium, Ceremonial Walls, and Marble Niche Covers/Memorial Markers | JB | $0.00 | 2 | $0.00 | Service | |
| 2038 | B.4.10.6 | Committal Shelters | QTR | $0.00 | 4 | $0.00 | Service | |
| 2039 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 2040 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 2041 | B.4.11.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 260 | $0.00 | Service | |
| 2042 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 2043 | B.4.11.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | Service | |
| 2044 | B.4.11.4 | Janitorial Services (Administration Building, Maintenance and Public Information Center) | MO | $0.00 | 12 | $0.00 | Service | |
| 2045 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 100 | $0.00 | Construction | |
| 2046 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 100 | $0.00 | Construction | |
| 2047 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 15000 | $0.00 | Construction | |
| 2048 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 1920 | $0.00 | Construction | |
| 2049 | B.4.8.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | EA | $0.00 | 1700 | $0.00 | Construction | |
| 2050 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 1100 | $0.00 | Construction | |
| 2051 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 600 | $0.00 | Construction | |
| 2052 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 500 | $0.00 | Construction | |
| Option Year 2 Total Cost | $0.00 |
| OPTION YEAR 3 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 3001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 3002 | B.4.1.2 | Mowing of Buffer Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 3003 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 3004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 3005 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3006 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 3007 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 3008 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 3009 | B.4.1.9 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | MO | $0.00 | 12 | $0.00 | Service | |
| 3010 | B.4.1.9 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 Min) | $0.00 | 400 | $0.00 | Service | |
| 3011 | B.4.1.10 | Mowing areas with a push Lawn Mower | Wk | $0.00 | 32 | $0.00 | Service | |
| 3012 | B.4.2.4 | Mulching HARDWOOD BLEND all - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | Service | |||
| 3013 | B.4.2.4 | Mulching - Long Needle Pinestraw - Removal, Replenish and/or Install All Areas | JB | $0.00 | 2 | $0.00 | Service | |
| 3014 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | JB | $0.00 | 12 | $0.00 | Service | |
| 3015 | B.4.3.2 | Tree Maintenance-(All tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 2 | $0.00 | Service | |
| 3016 | B.4.4.1 | Casket / Vault Gravesite Sod Installation: CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | EA | $0.00 | 1000 | $0.00 | Service | |
| 3017 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | EA | $0.00 | 20 | $0.00 | Service | |
| 3018 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | EA | $0.00 | 40 | $0.00 | Service | |
| 3019 | B.4.4.2 | Core Aerification (Aeration) - Approx 45 acres -As specified | JB | $0.00 | 1 | $0.00 | Service | |
| 3020 | B.4.4.3 | Fertilization- All Turf Areas(Bermuda) See Warm Season Flow Chart | JB | $0.00 | 5 | $0.00 | Service | |
| 3021 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 3022 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 3023 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 3024 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 3025 | B.4.5.1 | Insecticide (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 3026 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 3027 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 3028 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 3029 | B.4.8.3 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 3030 | B.4.9.1 | CASKET TRANSPORTATION | EA | $0.00 | 1000 | $0.00 | Service | |
| 3031 | B.4.9.1 | CHAIN OF CUSTODY | EA | $0.00 | 1000 | $0.00 | Service | |
| 3032 | B.4.9.2 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | Service | |
| 3033 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 3034 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 3035 | B.4.10.3 | Entrance Ways, Bridge concrete wall, Memorial Walk, Walls, Caps, Areas under signs, trash, and Floral Receptacles. | JB | $0.00 | 2 | $0.00 | Service | |
| 3036 | B.4.10.4 | Flag Assembly Area and Ceremonial Pavilion area | JB | $0.00 | 2 | $0.00 | Service | |
| 3037 | B.4.10.5 | Columbarium, Ceremonial Walls, and Marble Niche Covers/Memorial Markers | JB | $0.00 | 2 | $0.00 | Service | |
| 3038 | B.4.10.6 | Committal Shelters | QTR | $0.00 | 4 | $0.00 | Service | |
| 3039 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 3040 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 3041 | B.4.11.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 260 | $0.00 | Service | |
| 3042 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 3043 | B.4.11.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | Service | |
| 3044 | B.4.11.4 | Janitorial Services (Administration Building, Maintenance and Public Information Center) | MO | $0.00 | 12 | $0.00 | Service | |
| 3045 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 100 | $0.00 | Construction | |
| 3046 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 100 | $0.00 | Construction | |
| 3047 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 15000 | $0.00 | Construction | |
| 3048 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 1920 | $0.00 | Construction | |
| 3049 | B.4.8.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | EA | $0.00 | 1700 | $0.00 | Construction | |
| 3050 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 1100 | $0.00 | Construction | |
| 3051 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 600 | $0.00 | Construction | |
| 3052 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 500 | $0.00 | Construction | |
| Option Year 3 Total Cost | $0.00 |
| OPTION YEAR 4 | ||||||||
| CLIN | SOW | Description | Unit of issue | Cost | Qty | Total | ||
| 4001 | B.4.1.1 | Mowing Turf Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 4002 | B.4.1.2 | Mowing of Buffer Areas | WK | $0.00 | 32 | $0.00 | Service | |
| 4003 | B.4.1.3 | EDGING OF WALKWAYS, CURBS AND OTHER HORIZONTAL SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 4004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS, AND OTHER VERTICLE SURFACES | WK | $0.00 | 32 | $0.00 | Service | |
| 4005 | B.4.1.5 | GRAVESITE TRASH, DEBRIS, AND DECORATION/FLORAL REMOVAL (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4006 | B.4.1.6 | TRASH ,LEAF AND DEBRIS COLLECTION AND REMOVAL (Daily/Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | Service | |
| 4007 | B.4.1.7 | Mass Gravesite Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 3 | $0.00 | Service | |
| 4008 | B.4.1.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | Service | |
| 4009 | B.4.1.9 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | MO | $0.00 | 12 | $0.00 | Service | |
| 4010 | B.4.1.9 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA (15 Min) | $0.00 | 400 | $0.00 | Service | |
| 4011 | B.4.1.10 | Mowing areas with a push Lawn Mower | Wk | $0.00 | 32 | $0.00 | Service | |
| 4012 | B.4.2.4 | Mulching HARDWOOD BLEND all - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | Service | |||
| 4013 | B.4.2.4 | Mulching - Long Needle Pinestraw - Removal, Replenish and/or Install All Areas | JB | $0.00 | 2 | $0.00 | Service | |
| 4014 | B.4.3.1 | Maintenance of All Plant Beds, Shrubs, and Bushes | JB | $0.00 | 12 | $0.00 | Service | |
| 4015 | B.4.3.2 | Tree Maintenance-(All tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 2 | $0.00 | Service | |
| 4016 | B.4.4.1 | Casket / Vault Gravesite Sod Installation: CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | EA | $0.00 | 1000 | $0.00 | Service | |
| 4017 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | EA | $0.00 | 20 | $0.00 | Service | |
| 4018 | B.4.4.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | EA | $0.00 | 40 | $0.00 | Service | |
| 4019 | B.4.4.2 | Core Aerification (Aeration) - Approx 45 acres -As specified | JB | $0.00 | 1 | $0.00 | Service | |
| 4020 | B.4.4.3 | Fertilization- All Turf Areas(Bermuda) See Warm Season Flow Chart | JB | $0.00 | 5 | $0.00 | Service | |
| 4021 | B.4.4.4 | Weed Control: Pre-Emerge Herbicide Application- See Warm Season Flow Chart | JB | $0.00 | 2 | $0.00 | Service | |
| 4022 | B.4.4.4 | Weed Control: Post Emerge Herbicide - Blanket Application-- All Turf areas - | JB | $0.00 | 5 | $0.00 | Service | |
| 4023 | B.4.4.4 | Weed Control: Post Emerge Herbicide- Spot Application-- All Turf areas - | EA | $0.00 | 50 | $0.00 | Service | |
| 4024 | B.4.4.5 | Gypsum or Dolomitic Lime Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | Service | |||
| 4025 | B.4.5.1 | Insecticide (Other than fire ant, such as, Army worm, Grub worm) Blanket application | JB | $0.00 | 2 | $0.00 | Service | |
| 4026 | B.4.5.2 | Fire Ant Control Blanket Appication | JB | $0.00 | 1 | $0.00 | Service | |
| 4027 | B.4.5.2 | Spot Treatment for Fire Ant Control /monitoring | EA | $0.00 | 50 | $0.00 | Service | |
| 4028 | B.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | Service | |
| 4029 | B.4.8.3 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | EA | $0.00 | 1000 | $0.00 | Service | |
| 4030 | B.4.9.1 | CASKET TRANSPORTATION | EA | $0.00 | 1000 | $0.00 | Service | |
| 4031 | B.4.9.1 | CHAIN OF CUSTODY | EA | $0.00 | 1000 | $0.00 | Service | |
| 4032 | B.4.9.2 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | Service | |
| 4033 | B.4.10.1 | Headstone Cleaning | JB | $0.00 | 2 | $0.00 | Service | |
| 4034 | B.4.10.2 | Curbs, Parking Lots, Parking Blocks | JB | $0.00 | 2 | $0.00 | Service | |
| 4035 | B.4.10.3 | Entrance Ways, Bridge concrete wall, Memorial Walk, Walls, Caps, Areas under signs, trash, and Floral Receptacles. | JB | $0.00 | 2 | $0.00 | Service | |
| 4036 | B.4.10.4 | Flag Assembly Area and Ceremonial Pavilion area | JB | $0.00 | 2 | $0.00 | Service | |
| 4037 | B.4.10.5 | Columbarium, Ceremonial Walls, and Marble Niche Covers/Memorial Markers | JB | $0.00 | 2 | $0.00 | Service | |
| 4038 | B.4.10.6 | Committal Shelters | QTR | $0.00 | 4 | $0.00 | Service | |
| 4039 | B.4.10.7 | Buildings and Surrounding Concrete Surfaces | JB | $0.00 | 2 | $0.00 | Service | |
| 4040 | B.4.10.8 | Floral Vase Bin and Trash Receptacle Cleaning | QTR | $0.00 | 4 | $0.00 | Service | |
| 4041 | B.4.11.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 260 | $0.00 | Service | |
| 4042 | B.4.11.2 | Weekend/Holiday Burial Support | EA | $0.00 | 7 | $0.00 | Service | |
| 4043 | B.4.11.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | Service | |
| 4044 | B.4.11.4 | Janitorial Services (Administration Building, Maintenance and Public Information Center) | MO | $0.00 | 12 | $0.00 | Service | |
| 4045 | B.4.2.1 | Sunken Grave Repair and Turf Repair(Casket Sites) | EA | $0.00 | 100 | $0.00 | Construction | |
| 4046 | B.4.2.2 | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | EA | $0.00 | 100 | $0.00 | Construction | |
| 4047 | B.4.2.3 | SOD REPAIRS AND INSTALLATION | SQFT | $0.00 | 15000 | $0.00 | Construction | |
| 4048 | B.4.8.1 | HEADSTONE RECEIVING (ALL) | EA | $0.00 | 1920 | $0.00 | Construction | |
| 4049 | B.4.8.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | EA | $0.00 | 1700 | $0.00 | Construction | |
| 4050 | B.4.8.2 | HEADSTONE SETTING of All Headstones (INITIAL) | EA | $0.00 | 1100 | $0.00 | Construction | |
| 4051 | B.4.8.2 | HEADSTONE SETTING (REPLACEMENT) | EA | $0.00 | 600 | $0.00 | Construction | |
| 4052 | B.4.8.3 | HEADSTONE Raise/Realign | EA | $0.00 | 500 | $0.00 | Construction | |
| Option Year 4 Year Total Cost | $0.00 |
| TOTAL COST | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 (if exercised) | $0.00 |
| OPTION YEAR 2 (if exercised) | $0.00 |
| OPTION YEAR 3 (if exercised) | $0.00 |
| OPTION YEAR 4 (if exercised) | $0.00 |
| BASE + ALL OPTIONS TOTAL | $0.00 |
File details come from the government source that posted it. Updated .