Attachment A - Price Schedule.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- QSE--36C78624Q50305
About this file
This document is an attachment to a federal contract opportunity for Ground Maintenance Services at the Fort Jackson National Cemetery located in Columbia, SC. The requirement includes mowing, edging, trimming, debris removal, sprinkler system maintenance, fertilization, pest control, headstone setting, and pressure washing over a base period of 1 year with four 1-year option periods. The total estimated contract ceiling is $9.5 million. This is a fixed-price Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a minimum guaranteed award of $97,000. The contract is being competed as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. A site visit will be held on June 25, 2024. The incumbent contractor is not identified.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 2
| Fort Jackson National Cemetery - Ground Maintenance Requirement |
| BASE YEAR - Sept 1, 2024 - Aug 31, 2025 |
| The Contractor shall provide all labor, materials, equipment, tools, and supplies necessary to provide complete Ground Maintenance Services at Fort Jackson National Cemetery, 4170 Percival Rd, Columbia SC 29229. Services shall be provided in accordance with terms, conditions, specification, requirements, and schedules of the contract, including National Cemetery Administration Standard Operating Procedures and Operational Standards & Measures. |
Contract period will consist of a base period from Date of Award through 1 year, with four (4) one year renewal options if exercised. Task Orders will cross fiscal years.
This is a Fixed Price Indefinite Delivery, Indefinite Quantity (IDIQ) contract issued in accordance with FAR 13 – Simplified Acquisition Procedures. The one-time minimum guarantee amount for this award is $97,000 The awarded contract shall have a ceiling of $9,500,000. The Government does not guarantee that it will place any orders under this contract in excess of the guaranteed minimum award amount.
| CLIN | SOW | Description | Unit of issue | Est. Cost | Min. Est. Qty | Min. Total | |
| 0001 | B.4.1.1 | Mowing Turf Areas and Non-Turf -80+/- acres - Bermuda 419 and Emarald Zoysia (Service) | WK | 44 | $0.00 | ||
| 0002 | B.4.1.2 | Edging Walkways and Curbs (Service) | WK | 44 | $0.00 | ||
| 0003 | B.4.1.3 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces (Service) | WK | 44 | $0.00 | ||
| 0004 | B.4.1.4 | Daily Trash, Debris, and Grave Decoration/Floral Removal (invoice monthly) (Service) | MO | 12 | $0.00 | ||
| 0005 | B.4.1.5 | Daily Sweeping and/or Blowing Off Walkways and Roadways (Service) | MO | 12 | $0.00 | ||
| 0006 | B.4.1.6 | Underground Sprinkler System Operations, Inspection, and Maintenance: 10 Months (Service) | MO | 10 | $0.00 | ||
| 0007 | B.4.3 | Leaf Collection and Removal - weekly (invoice monthly) (Service) | MO | 12 | $0.00 | ||
| 0008 | B.4.4.1 | Maintenance of Planting Beds (Service) | MO | 12 | $0.00 | ||
| 0009 | B.4.4.1a | Maintenance of Flower Bed (4 beds- 2x anually(Fall/Spring Color) (Service) | JB | 2 | $0.00 | ||
| 0010 | B.4.4.2 | Long Needle Pine Straw - Removal, Replenish and/or Install All Areas | |||||
| Cemetery defined (Quartly) (Service) | QY | 4 | $0.00 | ||||
| 0011 | B.4.4.3 | Tree and Shrub Trimming and Pruning (Service) | QY | 4 | $0.00 | ||
| 0012 | B.4.5.2 | Core Aerification (Aeration) For Bermuda 419 - Approximately 76 +/- Acres (Service) | JB | 1 | $0.00 | ||
| 0013 | B.4.5.3 | Dethatching - Bermuda 419 Approximately 76 +/- Acres (Service) | JB | 1 | $0.00 | ||
| 0014 | B.4.5.4 | Fertilization - Bermuda 419 (1lb N per 1000.per app) See Flow Chart - approximately 80 +/- Acres (Service) | JB | 6 | $0.00 | ||
| 0015 | B.4.5.4 | Fertilization - Emarald Zoysia (.75lb N per 1000/per app) See Flow Chart - Administration area Approximately 1 acre +/- (Service) | JB | 6 | $0.00 | ||
| 0016 | B.4.5.4 | Lime/Gypsum application (Service) | JB | 1 | $0.00 | ||
| 0017 | B.4.5.5 | Pre-Emerge Application Bermuda 419 (See Flow Chart) 80+/- acres (Service) | JB | 3 | $0.00 | ||
| 0018 | B.4.5.5 | Pre-Emerge Application Emerald Zoysia (See Flow Chart) 1+/- acre (Service) | JB | 3 | $0.00 | ||
| 0019 | B.4.5.5 | Post-Emerge Application Spot Treat - See Flow Chart (Service) | JB | 40 | $0.00 | ||
| 0020 | B.4.5.5 | Post Emerge Weed Applications Blanket Treat - See Flow Chart 80 +/- acres (Service) | JB | 3 | $0.00 | ||
| 0021 | B.4.6.1 | Armadillos, Moles, and Other Pest Control To Include Bees, and Other Pest Control (Service) | MO | 12 | $0.00 | ||
| 0022 | B.4.6.2 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart (Service) | JB | 30 | $0.00 | ||
| 0023 | B.4.6.2 | Fire Ants Control - Blanket Application - (approximately 80 +/- Acres) See Flow Chart (Service) | JB | 2 | $0.00 | ||
| 0024 | B.4.6.3 | Pesticides and Insecticides-Blanket 80 +/- acres (Service) | JB | 2 | $0.00 | ||
| 0025 | B.4.6.3 | Pesticides and Insecticides Spot Application - Other Than Fire Ants - See Flow Chart (Service) | EA | 12 | $0.00 | ||
| 0026 | B.4.7 | Storm Damage and Debris Clean-up (Service) | EV | 4 | $0.00 | ||
| 0027 | B.4.8.1 | Daily Interment Shelter Setup and Tear Down ( 3 - Committal Shelters) (Service) | MO | 12 | $0.00 | ||
| 0028 | B.4.10.1 | Interment Services - Casket Transport, Chain of Custody (Casket), and Floral Arrangements (Casket) (Service) | EA | 700 | $0.00 | ||
| 0029 | B.4.11.1 | Cleaning of Headstones, and Section Markers to Include Application of United 727 Weatherzyme 2 x yearly (Twice a Year - Prior to Memorial Day and Veterans Day) (Service) | EA | 46000 | $0.00 | ||
| 0030 | B.4.11.2 | Cleaning Administration/Pic and Maintenance Building (Including all Sidewalks) Pressure Washing (Service) | QY | 4 | $0.00 | ||
| 0031 | B.4.11.3 | Cleaning Committal Shelters (Including all Sidewalks) Pressure Washing (Service) | QY | 4 | $0.00 | ||
| 0032 | B.4.11.4 | Cleaning Flag Assembly Area, Ossuary and All Signage Throughout the Cemetery (Including Concrete Flat Surfaces & all Sidewalks)Pressure Washing (Service) | QY | 4 | $0.00 | ||
| 0033 | B.4.11.5 | Cleaning Columbarium Walls and Niche Covers (to Include all Concrete Flat Surfaces (all Side walks) - Pressure Washing (Service) | QY | 4 | $0.00 | ||
| 0034 | B.4.12 | Walkways, Curbs, Entrance Walls, (Appox Phase 1 is 19,832+/- and Phase 2 is 11,161linear sqft) Pressure Washing (Service) | QY | 4 | $0.00 | ||
| 0035 | B.4.12.1 | Janitorial service including maintenance supplies - Administration & Maintenance Complex (including all restrooms) approx 5,000 | |||||
| net sq footage (Service) | MO | 12 | $0.00 | ||||
| 0036 | B.4.1.6 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts Provided By Government. (Construction) | EA (15minute) | 700 | $0.00 | ||
| 0037 | B.4.2.1 | Sunken Grave areas/ Sunken Grounds Repair (Construction) | EA | 75 | $0.00 | ||
| 0038 | B.4.2.1a | Divot and/or hole repairs up to appox. +/- 1' to 3' foot (Construction) | EA | 80 | $0.00 | ||
| 0039 | B.4.5.1 | Cut and Install Sod - All 1st and 2nd Subsequent Interment Gravesites (Casket) (Construction) | EA | 700 | $0.00 | ||
| 0040 | B.4.9.1 | Headstone Receiving and Setting 1st interment (Construction) | EA | 750 | $0.00 | ||
| 0041 | B.4.9.1 | Receiving blank headstones from delivery truck |
(forklift) and breaking down pallets of blank
| headstones. (Construction) | PA | 80 | $0.00 | |||
| 0042 | B.4.9.1 | Headstone Transport (Construction) | EA | 1020 | $0.00 | |
| 0043 | B.4.9.1 | Headstone Setting Replacement (Construction) | EA | 120 | $0.00 | |
| 0044 | B.4.9.1 | Headstone Setting Subsequent Re-Set (Construction) | EA | 150 | $0.00 | |
| 0045 | B.4.9.2 | Headstone Raise, Lower and Realignment (Construction) | EA | 300 | $0.00 | |
| 0046 | B.4.8.1a | SUPPORT SERVICES FOR HOLIDAYS & WEEKENDS | EA | 6 | $0.00 | |
| Base Year Total Estimate COST | $0.00 |
| Fort Jackson National Cemetery - Ground Maintenance Requirement | |||||||
| OPTION YEAR 1 - Sept 1, 2025 - Aug 31, 2026 | |||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Max. Est. Qty | Max Total | |
| 1001 | B.4.1.1 | Mowing Turf Areas and Non-Turf -80+/- acres - Bermuda 419 and Emarald Zoysia (Service) | WK | 66 | $0.00 | ||
| 1002 | B.4.1.3 | Edging Walkways and Curbs (Service) | WK | 66 | $0.00 | ||
| 1003 | B.4.1.4 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces (Service) | WK | 66 | $0.00 | ||
| 1004 | B.4.1.5 | Daily Trash, Debris, and Grave Decoration/Floral Removal (invoice monthly) (Service) | MO | 12 | $0.00 | ||
| 1005 | B.4.1.6 | Daily Sweeping and/or Blowing Off Walkways and Roadways (Service) | MO | 12 | $0.00 | ||
| 1006 | B.4.1.7 | Underground Sprinkler System Operations, Inspection, and Maintenance: 10 Months (Service) | MO | 12 | $0.00 | ||
| 1007 | B.4.3 | Leaf Collection and Removal - weekly (invoice monthly) (Service) | MO | 22 | $0.00 | ||
| 1008 | B.4.4.1 | Maintenance of Planting Beds (Service) | MO | 12 | $0.00 | ||
| 1009 | B.4.4.1a | Maintenance of Flower Bed (4 beds- 2x anually(Fall/Spring Color) (Service) | JB | 2 | $0.00 | ||
| 1010 | B.4.4.2 | Long Needle Pine Straw - Removal, Replenish and/or Install All Areas | |||||
| Cemetery defined (Quartly) (Service) | QY | 4 | $0.00 | ||||
| 1011 | B.4.4.3 | Tree and Shrub Trimming and Pruning (Service) | QY | 4 | $0.00 | ||
| 1012 | B.4.5.2 | Core Aerification (Aeration) For Bermuda 419 - Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 1013 | B.4.5.3 | Dethatching - Bermuda 419 Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 1014 | B.4.5.4 | Fertilization - Bermuda 419 (1lb N per 1000.per app) See Flow Chart - approximately 80 +/- Acres (Service) | JB | 8 | $0.00 | ||
| 1015 | B.4.5.4 | Fertilization - Emarald Zoysia (.75lb N per 1000/per app) See Flow Chart - Administration area Approximately 1 acre +/- (Service) | JB | 8 | $0.00 | ||
| 1016 | B.4.5.4 | Lime/Gypsum application (Service) | JB | 2 | $0.00 | ||
| 1017 | B.4.5.5 | Pre-Emerge Application Bermuda 419 (See Flow Chart) 80+/- acres (Service) | JB | 5 | $0.00 | ||
| 1018 | B.4.5.5 | Pre-Emerge Application Emerald Zoysia (See Flow Chart) 1+/- acre (Service) | JB | 5 | $0.00 | ||
| 1019 | B.4.5.5 | Post-Emerge Application Spot Treat - See Flow Chart (Service) | JB | 60 | $0.00 | ||
| 1020 | B.4.5.5 | Post Emerge Weed Applications Blanket Treat - See Flow Chart 80 +/- acres (Service) | JB | 5 | $0.00 | ||
| 1021 | B.4.6.1 | Armadillos, Moles, and Other Pest Control To Include Bees, and Other Pest Control (Service) | MO | 12 | $0.00 | ||
| 1022 | B.4.6.2 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart (Service) | JB | 180 | $0.00 | ||
| 1023 | B.4.6.2 | Fire Ants Control - Blanket Application - (approximately 80 +/- Acres) See Flow Chart (Service) | JB | 4 | $0.00 | ||
| 1024 | B.4.6.3 | Pesticides and Insecticides-Blanket 80 +/- acres (Service) | JB | 6 | $0.00 | ||
| 1025 | B.4.6.3 | Pesticides and Insecticides Spot Application - Other Than Fire Ants - See Flow Chart (Service) | EA | 24 | $0.00 | ||
| 1026 | B.4.7 | Storm Damage and Debris Clean-up (Service) | EV | 8 | $0.00 | ||
| 1027 | B.4.8.1 | Daily Interment Shelter Setup and Tear Down ( 3 - Committal Shelters) (Service) | EA | 12 | $0.00 | ||
| 1028 | B.4.10.1 | Interment Services - Casket Transport, Chain of Custody (Casket), and Floral Arrangements (Casket) (Service) | EA | 1300 | $0.00 | ||
| 1029 | B.4.11.1 | Cleaning of Headstones, and Section Markers to Include Application of United 727 Weatherzyme 2 x yearly (Twice a Year - Prior to Memorial Day and Veterans Day) (Service) | EA | 46000 | $0.00 | ||
| 1030 | B.4.11.2 | Cleaning Administration/Pic and Maintenance Building (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 1031 | B.4.11.3 | Cleaning Committal Shelters (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 1032 | B.4.11.4 | Cleaning Flag Assembly Area, Ossuary and All Signage Throughout the Cemetery (Including Concrete Flat Surfaces & all Sidewalks)Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 1033 | B.4.11.5 | Cleaning Columbarium Walls and Niche Covers (to Include all Concrete Flat Surfaces (all Side walks) - Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 1034 | B.4.12 | Walkways, Curbs, Entrance Walls, (Appox Phase 1 is 19,832+/- and Phase 2 is 11,161linear sqft) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 1035 | B.4.12.1 | Janitorial service including maintenance supplies - Administration & Maintenance Complex (including all restrooms) approx 5,000 | |||||
| net sq footage (Service) | MO | 12 | $0.00 | ||||
| 1036 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts Provided By Government. (Construction) | EA (15minute) | 1400 | $0.00 | ||
| 1037 | B.4.2.1 | Sunken Grave areas/ Sunken Grounds Repair (Construction) | EA | 300 | $0.00 | ||
| 1038 | B.4.2.1a | Divot and/or hole repairs up to appox. +/- 1' to 3' foot (Construction) | EA | 150 | $0.00 | ||
| 1039 | B.4.5.1 | Cut and Install Sod - All 1st and 2nd Subsequent Interment Gravesites (Casket) (Construction) | EA | 850 | $0.00 | ||
| 1040 | B.4.9.1 | Headstone Receiving and Setting 1st interment (Construction) | EA | 1400 | $0.00 | ||
| 1041 | B.4.9.1 | Receiving blank headstones from delivery truck |
(forklift) and breaking down pallets of blank
| headstones. (Construction) | PA | 125 | $0.00 | |||
| 1042 | B.4.9.1 | Headstone Transport (Construction) | EA | 1400 | $0.00 | |
| 1043 | B.4.9.1 | Headstone Setting Replacement (Construction) | EA | 400 | $0.00 | |
| 1044 | B.4.9.1 | Headstone Setting Subsequent Re-Set (Construction) | EA | 300 | $0.00 | |
| 1045 | B.4.9.2 | Headstone Raise, Lower and Realignment (Construction) | EA | 800 | $0.00 | |
| 1046 | B.4.8.1a | SUPPORT SERVICES FOR HOLIDAYS & WEEKENDS | EA | 12 | $0.00 | |
| Option Year 1 Total Estimate COST | $0.00 |
| Fort Jackson National Cemetery - Ground Maintenance Requirement | |||||||
| OPTION YEAR 2 - Sept 1, 2026 - Aug 31, 2027 | |||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Max. Est. Qty | Max Total | |
| 2001 | B.4.1.1 | Mowing Turf Areas and Non-Turf -80+/- acres - Bermuda 419 and Emarald Zoysia (Service) | WK | 66 | $0.00 | ||
| 2002 | B.4.1.3 | Edging Walkways and Curbs (Service) | WK | 66 | $0.00 | ||
| 2003 | B.4.1.4 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces (Service) | WK | 66 | $0.00 | ||
| 2004 | B.4.1.5 | Daily Trash, Debris, and Grave Decoration/Floral Removal (invoice monthly) (Service) | MO | 300 | $0.00 | ||
| 2005 | B.4.1.6 | Daily Sweeping and/or Blowing Off Walkways and Roadways (Service) | MO | 12 | $0.00 | ||
| 2006 | B.4.1.7 | Underground Sprinkler System Operations, Inspection, and Maintenance: 10 Months (Service) | MO | 12 | $0.00 | ||
| 2007 | B.4.3 | Leaf Collection and Removal - weekly (invoice monthly) (Service) | MO | 22 | $0.00 | ||
| 2008 | B.4.4.1 | Maintenance of Planting Beds (Service) | MO | 12 | $0.00 | ||
| 2009 | B.4.4.1a | Maintenance of Flower Bed (4 beds- 2x anually(Fall/Spring Color) (Service) | JB | 2 | $0.00 | ||
| 2010 | B.4.4.2 | Long Needle Pine Straw - Removal, Replenish and/or Install All Areas | |||||
| Cemetery defined (Quartly) (Service) | QY | 4 | $0.00 | ||||
| 2011 | B.4.4.3 | Tree and Shrub Trimming and Pruning (Service) | QY | 4 | $0.00 | ||
| 2012 | B.4.5.2 | Core Aerification (Aeration) For Bermuda 419 - Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 2013 | B.4.5.3 | Dethatching - Bermuda 419 Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 2014 | B.4.5.4 | Fertilization - Bermuda 419 (1lb N per 1000.per app) See Flow Chart - approximately 80 +/- Acres (Service) | JB | 8 | $0.00 | ||
| 2015 | B.4.5.4 | Fertilization - Emarald Zoysia (.75lb N per 1000/per app) See Flow Chart - Administration area Approximately 1 acre +/- (Service) | JB | 8 | $0.00 | ||
| 2016 | B.4.5.4 | Lime/Gypsum application (Service) | JB | 2 | $0.00 | ||
| 2017 | B.4.5.5 | Pre-Emerge Application Bermuda 419 (See Flow Chart) 80+/- acres (Service) | JB | 5 | $0.00 | ||
| 2018 | B.4.5.5 | Pre-Emerge Application Emerald Zoysia (See Flow Chart) 1+/- acre (Service) | JB | 5 | $0.00 | ||
| 2019 | B.4.5.5 | Post-Emerge Application Spot Treat - See Flow Chart (Service) | JB | 60 | $0.00 | ||
| 2020 | B.4.5.5 | Post Emerge Weed Applications Blanket Treat - See Flow Chart 80 +/- acres (Service) | JB | 5 | $0.00 | ||
| 2021 | B.4.6.1 | Armadillos, Moles, and Other Pest Control To Include Bees, and Other Pest Control (Service) | MO | 12 | $0.00 | ||
| 2022 | B.4.6.2 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart (Service) | JB | 180 | $0.00 | ||
| 2023 | B.4.6.2 | Fire Ants Control - Blanket Application - (approximately 80 +/- Acres) See Flow Chart (Service) | JB | 4 | $0.00 | ||
| 2024 | B.4.6.3 | Pesticides and Insecticides-Blanket 80 +/- acres (Service) | JB | 6 | $0.00 | ||
| 2025 | B.4.6.3 | Pesticides and Insecticides Spot Application - Other Than Fire Ants - See Flow Chart (Service) | EA | 24 | $0.00 | ||
| 2026 | B.4.7 | Storm Damage and Debris Clean-up (Service) | EV | 8 | $0.00 | ||
| 2027 | B.4.8.1 | Daily Interment Shelter Setup and Tear Down ( 3 - Committal Shelters) (Service) | EA | 12 | $0.00 | ||
| 2028 | B.4.10.1 | Interment Services - Casket Transport, Chain of Custody (Casket), and Floral Arrangements (Casket) (Service) | EA | 1300 | $0.00 | ||
| 2029 | B.4.11.1 | Cleaning of Headstones, and Section Markers to Include Application of United 727 Weatherzyme 2 x yearly (Twice a Year - Prior to Memorial Day and Veterans Day) (Service) | EA | 49680 | $0.00 | ||
| 2030 | B.4.11.2 | Cleaning Administration/Pic and Maintenance Building (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 2031 | B.4.11.3 | Cleaning Committal Shelters (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 2032 | B.4.11.4 | Cleaning Flag Assembly Area, Ossuary and All Signage Throughout the Cemetery (Including Concrete Flat Surfaces & all Sidewalks)Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 2033 | B.4.11.5 | Cleaning Columbarium Walls and Niche Covers (to Include all Concrete Flat Surfaces (all Side walks) - Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 2034 | B.4.12 | Walkways, Curbs, Entrance Walls, (Appox Phase 1 is 19,832+/- and Phase 2 is 11,161linear sqft) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 2035 | B.4.12.1 | Janitorial service including maintenance supplies - Administration & Maintenance Complex (including all restrooms) approx 5,000 | |||||
| net sq footage (Service) | MO | 14 | $0.00 | ||||
| 2036 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts Provided By Government. (Construction) | EA (15minute) | 1400 | $0.00 | ||
| 2037 | B.4.2.1 | Sunken Grave areas/ Sunken Grounds Repair (Construction) | EA | 300 | $0.00 | ||
| 2038 | B.4.2.1a | Divot and/or hole repairs up to appox. +/- 1' to 3' foot (Construction) | EA | 150 | $0.00 | ||
| 2039 | B.4.5.1 | Cut and Install Sod - All 1st and 2nd Subsequent Interment Gravesites (Casket) (Construction) | EA | 850 | $0.00 | ||
| 2040 | B.4.9.1 | Headstone Receiving and Setting 1st interment (Construction) | EA | 1400 | $0.00 | ||
| 2041 | B.4.9.1 | Receiving blank headstones from delivery truck |
(forklift) and breaking down pallets of blank
| headstones. (Construction) | PA | 125 | $0.00 | |||
| 2042 | B.4.9.1 | Headstone Transport (Construction) | EA | 1400 | $0.00 | |
| 2043 | B.4.9.1 | Headstone Setting Replacement (Construction) | EA | 400 | $0.00 | |
| 2044 | B.4.9.1 | Headstone Setting Subsequent Re-Set (Construction) | EA | 300 | $0.00 | |
| 2045 | B.4.9.2 | Headstone Raise, Lower and Realignment (Construction) | EA | 800 | $0.00 | |
| 2046 | B.4.8.1a | SUPPORT SERVICES FOR HOLIDAYS & WEEKENDS | EA | 12 | $0.00 | |
| Option Year 2 Total Estimate COST | $0.00 |
| Fort Jackson National Cemetery - Ground Maintenance Requirement | |||||||
| OPTION YEAR 3 - Sept 1, 2027 - Aug 31, 2028 | |||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Max. Est. Qty | Max Total | |
| 3001 | B.4.1.1 | Mowing Turf Areas and Non-Turf -80+/- acres - Bermuda 419 and Emarald Zoysia (Service) | WK | 66 | $0.00 | ||
| 3002 | B.4.1.3 | Edging Walkways and Curbs (Service) | WK | 66 | $0.00 | ||
| 3003 | B.4.1.4 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces (Service) | WK | 66 | $0.00 | ||
| 3004 | B.4.1.5 | Daily Trash, Debris, and Grave Decoration/Floral Removal (invoice monthly) (Service) | EA | 300 | $0.00 | ||
| 3005 | B.4.1.6 | Daily Sweeping and/or Blowing Off Walkways and Roadways (Service) | EA | 12 | $0.00 | ||
| 3006 | B.4.1.7 | Underground Sprinkler System Operations, Inspection, and Maintenance: 10 Months (Service) | MO | 12 | $0.00 | ||
| 3007 | B.4.3 | Leaf Collection and Removal - weekly (invoice monthly) (Service) | MO | 22 | $0.00 | ||
| 3008 | B.4.4.1 | Maintenance of Planting Beds (Service) | MO | 12 | $0.00 | ||
| 3009 | B.4.4.1a | Maintenance of Flower Bed (4 beds- 2x anually(Fall/Spring Color) (Service) | JB | 2 | $0.00 | ||
| 3010 | B.4.4.2 | Long Needle Pine Straw - Removal, Replenish and/or Install All Areas | |||||
| Cemetery defined (Quartly) (Service) | QY | 4 | $0.00 | ||||
| 3011 | B.4.4.3 | Tree and Shrub Trimming and Pruning (Service) | QY | 4 | $0.00 | ||
| 3012 | B.4.5.2 | Core Aerification (Aeration) For Bermuda 419 - Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 3013 | B.4.5.3 | Dethatching - Bermuda 419 Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 3014 | B.4.5.4 | Fertilization - Bermuda 419 (1lb N per 1000.per app) See Flow Chart - approximately 80 +/- Acres (Service) | JB | 8 | $0.00 | ||
| 3015 | B.4.5.4 | Fertilization - Emarald Zoysia (.75lb N per 1000/per app) See Flow Chart - Administration area Approximately 1 acre +/- (Service) | JB | 8 | $0.00 | ||
| 3016 | B.4.5.4 | Lime/Gypsum application (Service) | JB | 2 | $0.00 | ||
| 3017 | B.4.5.5 | Pre-Emerge Application Bermuda 419 (See Flow Chart) 80+/- acres (Service) | JB | 5 | $0.00 | ||
| 3018 | B.4.5.5 | Pre-Emerge Application Emerald Zoysia (See Flow Chart) 1+/- acre (Service) | JB | 5 | $0.00 | ||
| 3019 | B.4.5.5 | Post-Emerge Application Spot Treat - See Flow Chart (Service) | JB | 60 | $0.00 | ||
| 3020 | B.4.5.5 | Post Emerge Weed Applications Blanket Treat - See Flow Chart 80 +/- acres (Service) | JB | 5 | $0.00 | ||
| 3021 | B.4.6.1 | Armadillos, Moles, and Other Pest Control To Include Bees, and Other Pest Control (Service) | MO | 12 | $0.00 | ||
| 3022 | B.4.6.2 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart (Service) | JB | 180 | $0.00 | ||
| 3023 | B.4.6.2 | Fire Ants Control - Blanket Application - (approximately 80 +/- Acres) See Flow Chart (Service) | JB | 4 | $0.00 | ||
| 3024 | B.4.6.3 | Pesticides and Insecticides-Blanket 80 +/- acres (Service) | JB | 6 | $0.00 | ||
| 3025 | B.4.6.3 | Pesticides and Insecticides Spot Application - Other Than Fire Ants - See Flow Chart (Service) | EA | 24 | $0.00 | ||
| 3026 | B.4.7 | Storm Damage and Debris Clean-up (Service) | EV | 8 | $0.00 | ||
| 3027 | B.4.8.1 | Daily Interment Shelter Setup and Tear Down ( 3 - Committal Shelters) (Service) | EA | 12 | $0.00 | ||
| 3028 | B.4.10.1 | Interment Services - Casket Transport, Chain of Custody (Casket), and Floral Arrangements (Casket) (Service) | EA | 1300 | $0.00 | ||
| 3029 | B.4.11.1 | Cleaning of Headstones, and Section Markers to Include Application of United 727 Weatherzyme 2 x yearly (Twice a Year - Prior to Memorial Day and Veterans Day) (Service) | EA | 53654.4 | $0.00 | ||
| 3030 | B.4.11.2 | Cleaning Administration/Pic and Maintenance Building (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 3031 | B.4.11.3 | Cleaning Committal Shelters (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 3032 | B.4.11.4 | Cleaning Flag Assembly Area, Ossuary and All Signage Throughout the Cemetery (Including Concrete Flat Surfaces & all Sidewalks)Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 3033 | B.4.11.5 | Cleaning Columbarium Walls and Niche Covers (to Include all Concrete Flat Surfaces (all Side walks) - Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 3034 | B.4.12 | Walkways, Curbs, Entrance Walls, (Appox Phase 1 is 19,832+/- and Phase 2 is 11,161linear sqft) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 3035 | B.4.12.1 | Janitorial service including maintenance supplies - Administration & Maintenance Complex (including all restrooms) approx 5,000 | |||||
| net sq footage (Service) | MO | 14 | $0.00 | ||||
| 3036 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts Provided By Government. (Construction) | EA (15minute) | 1400 | $0.00 | ||
| 3037 | B.4.2.1 | Sunken Grave areas/ Sunken Grounds Repair (Construction) | EA | 300 | $0.00 | ||
| 3038 | B.4.2.1a | Divot and/or hole repairs up to appox. +/- 1' to 3' foot (Construction) | EA | 150 | $0.00 | ||
| 3039 | B.4.5.1 | Cut and Install Sod - All 1st and 2nd Subsequent Interment Gravesites (Casket) (Construction) | EA | 850 | $0.00 | ||
| 3040 | B.4.9.1 | Headstone Receiving and Setting 1st interment (Construction) | EA | 1100 | $0.00 | ||
| 3041 | B.4.9.1a | Receiving blank headstones from delivery truck |
(forklift) and breaking down pallets of blank
| headstones. (Construction) | PA | 125 | $0.00 | |||
| 3042 | B.4.9.1b | Headstone Transport (Construction) | EA | 1400 | $0.00 | |
| 3043 | B.4.9.1c | Headstone Setting Replacement (Construction) | EA | 400 | $0.00 | |
| 3044 | B.4.9.1d | Headstone Setting Subsequent Re-Set (Construction) | EA | 300 | $0.00 | |
| 3045 | B.4.9.2 | Headstone Raise, Lower and Realignment (Construction) | EA | 800 | $0.00 | |
| 3046 | B.4.8.1a | SUPPORT SERVICES FOR HOLIDAYS & WEEKENDS | EA | 12 | $0.00 | |
| Option Year 3 Total Estimate COST | $0.00 |
| Fort Jackson National Cemetery - Ground Maintenance Requirement | |||||||
| OPTION YEAR 4 - Sept 1, 2028 - Aug 31, 2029 | |||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Max. Est. Qty | Max Total | |
| 4001 | B.4.1.1 | Mowing Turf Areas and Non-Turf -80+/- acres - Bermuda 419 and Emarald Zoysia (Service) | WK | 66 | $0.00 | ||
| 4002 | B.4.1.3 | Edging Walkways and Curbs (Service) | WK | 66 | $0.00 | ||
| 4003 | B.4.1.4 | Trimming of Headstones, Monuments, Markers, and Other Vertical Surfaces (Service) | WK | 66 | $0.00 | ||
| 4004 | B.4.1.5 | Daily Trash, Debris, and Grave Decoration/Floral Removal (invoice monthly) (Service) | EA | 300 | $0.00 | ||
| 4005 | B.4.1.6 | Daily Sweeping and/or Blowing Off Walkways and Roadways (Service) | EA | 12 | $0.00 | ||
| 4006 | B.4.1.7 | Underground Sprinkler System Operations, Inspection, and Maintenance: 10 Months (Service) | MO | 12 | $0.00 | ||
| 4007 | B.4.3 | Leaf Collection and Removal - weekly (invoice monthly) (Service) | MO | 22 | $0.00 | ||
| 4008 | B.4.4.1 | Maintenance of Planting Beds (Service) | MO | 12 | $0.00 | ||
| 4009 | B.4.4.1 | Maintenance of Flower Bed (4 beds- 2x anually(Fall/Spring Color) (Service) | JB | 2 | $0.00 | ||
| 4010 | B.4.4.2 | Long Needle Pine Straw - Removal, Replenish and/or Install All Areas | |||||
| Cemetery defined (Quartly) (Service) | QY | 4 | $0.00 | ||||
| 4011 | B.4.4.3 | Tree and Shrub Trimming and Pruning (Service) | QY | 4 | $0.00 | ||
| 4012 | B.4.5.2 | Core Aerification (Aeration) For Bermuda 419 - Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 4013 | B.4.5.3 | Dethatching - Bermuda 419 Approximately 76 +/- Acres (Service) | JB | 2 | $0.00 | ||
| 4014 | B.4.5.4 | Fertilization - Bermuda 419 (1lb N per 1000.per app) See Flow Chart - approximately 80 +/- Acres (Service) | JB | 8 | $0.00 | ||
| 4015 | B.4.5.4 | Fertilization - Emarald Zoysia (.75lb N per 1000/per app) See Flow Chart - Administration area Approximately 1 acre +/- (Service) | JB | 8 | $0.00 | ||
| 4016 | B.4.5.4 | Lime/Gypsum application (Service) | JB | 2 | $0.00 | ||
| 4017 | B.4.5.5 | Pre-Emerge Application Bermuda 419 (See Flow Chart) 80+/- acres (Service) | JB | 5 | $0.00 | ||
| 4018 | B.4.5.5 | Pre-Emerge Application Emerald Zoysia (See Flow Chart) 1+/- acre (Service) | JB | 5 | $0.00 | ||
| 4019 | B.4.5.5 | Post-Emerge Application Spot Treat - See Flow Chart (Service) | JB | 60 | $0.00 | ||
| 4020 | B.4.5.5 | Post Emerge Weed Applications Blanket Treat - See Flow Chart 80 +/- acres (Service) | JB | 5 | $0.00 | ||
| 4021 | B.4.6.1 | Armadillos, Moles, and Other Pest Control To Include Bees, and Other Pest Control (Service) | MO | 12 | $0.00 | ||
| 4022 | B.4.6.2 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart (Service) | JB | 180 | $0.00 | ||
| 4023 | B.4.6.2 | Fire Ants Control - Blanket Application - (approximately 80 +/- Acres) See Flow Chart (Service) | JB | 4 | $0.00 | ||
| 4024 | B.4.6.3 | Pesticides and Insecticides-Blanket 80 +/- acres (Service) | JB | 6 | $0.00 | ||
| 4025 | B.4.6.3 | Pesticides and Insecticides Spot Application - Other Than Fire Ants - See Flow Chart (Service) | EA | 24 | $0.00 | ||
| 4026 | B.4.7 | Storm Damage and Debris Clean-up (Service) | EV | 8 | $0.00 | ||
| 4027 | B.4.8.1 | Daily Interment Shelter Setup and Tear Down ( 3 - Committal Shelters) (Service) | EA | 12 | $0.00 | ||
| 4028 | B.4.10.1 | Interment Services - Casket Transport, Chain of Custody (Casket), and Floral Arrangements (Casket) (Service) | EA | 1300 | $0.00 | ||
| 4029 | B.4.11.1 | Cleaning of Headstones, and Section Markers to Include Application of United 727 Weatherzyme 2 x yearly (Twice a Year - Prior to Memorial Day and Veterans Day) (Service) | EA | 57946.752 | $0.00 | ||
| 4030 | B.4.11.2 | Cleaning Administration/Pic and Maintenance Building (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 4031 | B.4.11.3 | Cleaning Committal Shelters (Including all Sidewalks) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 4032 | B.4.11.4 | Cleaning Flag Assembly Area, Ossuary and All Signage Throughout the Cemetery (Including Concrete Flat Surfaces & all Sidewalks)Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 4033 | B.4.11.5 | Cleaning Columbarium Walls and Niche Covers (to Include all Concrete Flat Surfaces (all Side walks) - Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 4034 | B.4.12 | Walkways, Curbs, Entrance Walls, (Appox Phase 1 is 19,832+/- and Phase 2 is 11,161linear sqft) Pressure Washing (Service) | QY | 6 | $0.00 | ||
| 4035 | B.4.12.1 | Janitorial service including maintenance supplies - Administration & Maintenance Complex (including all restrooms) approx 5,000 | |||||
| net sq footage (Service) | MO | 14 | $0.00 | ||||
| 4036 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts Provided By Government. (Construction) | EA (15minute) | 1400 | $0.00 | ||
| 4037 | B.4.2.1 | Sunken Grave areas/ Sunken Grounds Repair (Construction) | EA | 300 | $0.00 | ||
| 4038 | B.4.2.1a | Divot and/or hole repairs up to appox. +/- 1' to 3' foot (Construction) | EA | 150 | $0.00 | ||
| 4039 | B.4.5.1 | Cut and Install Sod - All 1st and 2nd Subsequent Interment Gravesites (Casket) (Construction) | EA | 850 | $0.00 | ||
| 4040 | B.4.9.1 | Headstone Receiving and Setting 1st interment (Construction) | EA | 1100 | $0.00 | ||
| 4041 | B.4.9.1a | Receiving blank headstones from delivery truck |
(forklift) and breaking down pallets of blank
| headstones. (Construction) | PA | 125 | $0.00 | |||
| 4042 | B.4.9.1b | Headstone Transport (Construction) | EA | 1400 | $0.00 | |
| 4043 | B.4.9.1c | Headstone Setting Replacement (Construction) | EA | 400 | $0.00 | |
| 4044 | B.4.9.1d | Headstone Setting Subsequent Re-Set (Construction) | EA | 300 | $0.00 | |
| 4045 | B.4.9.2 | Headstone Raise, Lower and Realignment (Construction) | EA | 800 | $0.00 | |
| 4046 | B.4.8.1a | SUPPORT SERVICES FOR HOLIDAYS & WEEKENDS | EA | 12 | $0.00 | |
| Option Year 4 Year Total Estimate COST | $0.00 |
File details come from the government source that posted it. Updated .