QMAE-EV-190002-D_Attachment_2_-_Proposal_Checklist.pdf

PDF 130 KB Posted

Attached to
GSA's 2020 Medium & Heavy Duty Trucks and Wreckers & Carriers Program
Solicitation number
QMAE-EV-190002-D
Issued by

About this file

This document is a proposal checklist for solicitation QMAEEV-190002D for GSA's 2020 Medium & Heavy Duty Trucks and Wreckers & Carriers Program. Offerors must submit proposals by August 30, 2019 in three volumes - administrative requirements, technical proposal, and price proposal - using the specified tabs and formats. The administrative requirements volume must include forms SF1449, the vendor response document, financial information, SAM registration information, VETS-4212 reporting verification, subcontracting plan, letter of supply, and inspection points. The technical proposal volume must address the offeror's technical capability using tabs for technical approach, project plan, and any exceptions to federal standards, as well as the offeror's management capabilities using tabs for management approach and damage in transit procedures. The price proposal volume must include an electronic copy of the completed AutoBid pricing printout.

Proposal Checklist

View the file

Other files

File Type Posted
GSA_QMAE-EV-190002-D_Amendment_0002_8_14_2019.pdf PDF
QMAE-EV-190002-D_Attachment_6_-_Federal_Standards_REVISED.docx DOCX document
QMAE-EV-190002-D_Attachment_12_-_Small_Business_Subcontracting_Plan_Template_REVISED.docx DOCX document
GSA_QMAE-EV-190002-D_0001_SF30_Signed_7_29_2019.pdf PDF
QMAE-EV-190002-D_Attachment_15_-_AutoChoice_Online_Ordering_Instructions_REVISED.pdf PDF
QMAE-EV-190002-D_Attachment_16_-_GSA_Form_1611.xlsx XLSX spreadsheet
QMAE-EV-190002-D_Attachment_7_-_Schedule_of_Items.pdf PDF
QMAE-EV-190002-D_Attachment_13_-_Inspection_Points_Template.xlsx XLSX spreadsheet
Summary_of_Changes_from_2017_to_2020_MHWC_Program.docx DOCX document
QMAE-EV-190002-D_Attachment_15_-_AutoChoice_Online_Ordering_Instructions.pdf PDF
QMAE-EV-190002-D_Attachment_14_-_AutoBid_Instructions.pdf PDF
QMAE-EV-190002-D_2020_MHWC_Solicitation_FINAL_7_16_2019.pdf PDF
QMAE-EV-190002-D_Attachment_6_-_Federal_Standards.pdf PDF
QMAE-EV-190002-D_Attachment_3_-_SF1449.pdf PDF
QMAE-EV-190002-D_Attachment_12_-_Small_Business_Subcontracting_Plan_Template.docx DOCX document
QMAE-EV-190002-D_Attachment_17_-_Option_Analysis.pdf PDF
QMAE-EV-190002-D_Attachment_11_-_Monthly_Status_Report_Template.xlsx XLSX spreadsheet
QMAE-EV-190002-D_Attachment_5_-_Technical_Exceptions_Spreadsheet.xlsx XLSX spreadsheet
QMAE-EV-190002-D_Attachment_10_-_Weekly_Status_Reports_EXAMPLE.xlsx XLSX spreadsheet
QMAE-EV-190002-D_Attachment_9_-_Weekly_Vendor_Status_Submission_Requirements_Report.pdf PDF
QMAE-EV-190002-D_Attachment_1_-_IBR.docx DOCX document
QMAE-EV-190002-D_Attachment_8_-_Estimated_Quantities.pdf PDF
QMAE-EV-190002-D_Attachment_4_-_Vendor_Response_Document.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – PROPOSAL CHECKLIST

SOLICITATION QMAE‐EV-190002‐D

This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.

Proposal Checklist

Volume 1—Administrative Requirements (ELECTRONIC VERSION ONLY - .zip file)

Included/ Completed

GSA

Use

Completed Proposal Checklist

TAB A – SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}

TAB B – Vendor Response Document (DO NOT include entire solicitation document) TAB C – Financial Information TAB D – SAM Information TAB E – Proof of completion of VETS-4212 reporting requirement TAB F – SubK Plan TAB G – Letter of Supply TAB H – Inspection Points / Place(s) of Performance

Volume 2—Technical Proposal (ELECTRONIC VERSION ONLY - .zip file)

Included/ Completed

GSA

Use

Factor 1 – Technical Capability TAB A – Technical Approach TAB B – Project Plan TAB C – Exceptions to Federal Standards (Excel only)

Factor 2 – Management Capabilities TAB A – Management Approach TAB B – Damage in Transit (DIT) Procedures

Factor 3 – Past Performance TAB A - Projects

Volume 3—Price Proposal (ELECTRONIC VERSION ONLY - .zip file)

Included/ Completed

GSA

Use

Factor 4 – Price AutoBid Pricing Completed and Submitted by 2:00pm ET on August 30, 2019

Tab A - ELECTRONIC copy of AutoBid printout

File details come from the government source that posted it. Updated .