Q A_from_Industry_day_-_Final.pdf

PDF 106 KB Posted

Attached to
SPAWAR Mobile Communications Vehicle Project- RFI/Industry Day Notice
Solicitation number
QMAA-HM-140013-D
Issued by

About this file

Questions and Answers (Q A)from SPARWAR Industry Day - Apr 15 2015.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration

US General Services Administration & Navy SPAWAR Mobile Communications Vehicle (MCV) Project Industry Day

April 15, 2014

PANEL DISCUSSION- GROUP QUESTIONS AND ANSWERS

1. Q- Does the MCV require homologation to foreign standards?

A- No, the vehicle shall comply to US DOT and EPA standards

2. Q- Request clarification of conflicting ambient temperature ratings A- The maximum ambient temperature rating shall be 49 degrees Celsius

3. Q- Will the government consider alternative chassis configurations?

A- Yes, the government shall consider configurations other than the chassis specified.

4. Q- Are there threshold specifications for Electro Magnetic Interference (EMI)?

A- No

5. Q- Will the MCV be transported in a trailer during air transport?

A- No

6. Q- Are there human factor specifications for the rear cabin area?

A- Current requirements include compliance to DOT Federal Motor Vehicle Standards. The MCV must exceed 10,000 pounds Gross Vehicle Weight Rating to satisfy the payload requirements.

7. Q- Will the Navy provide math model (geometric) data of the pilot MCV?

A- No, math data is not available.

8. Q- The body mounting requirements appear to conflict with the requirements for sat com antenna mounting plate- torsion properties?

A- Navy/GSA shall review the draft requirements and adjust as required.

9. Q-Are there restrictions to install hood vents?

A- No.

10. Q- Shall the key fob be disabled?

A- Yes, no wireless entry to the vehicle shall be provided.

11. Q- Can exceptions to the technical requirements can be submitted with proposal?

A- Yes, instructions shall be included in the solicitation. The offeror is responsible to clarify and explain all exceptions.

12. Q- Will the government provide the base vehicle as Government Furnished

Equipment (GFE)?

A- The GSA Contracting Officer may consider providing the base vehicle as

GFE, details shall be identified in the solicitation.

1800 F St NW Washington, DC 20405 www.gsa.gov

13. Q- Will the Government request offerors to provide recommended spare parts list?

A- The Government shall consider the options of either requesting recommendations or it may provide a detailed list of required spare parts.

14. Q- Can the Government provide a location where the vehicles will be stationed?

A- The vehicles shall be stationed in the National Capital Region.

15. Q- Will the procurement be a set-a-side?

A- An acquisition strategy has not yet been determined.

16. Q- Are consumables included in warranty?

A- No, GSA/Navy shall identify all items that shall be exceptions to warranty.

17. Q- How shall web based training be executed with security requirements?

A- This requirement shall be amended. GSA/Navy shall amend, clarify, and summarize all items in a Contract Deliverables Requirements List (CDRL) within the final Purchase Description.

18. Q- Is the government considering alternatives to the configuration identified in the draft requirements?

A- The government shall provide updated technical information on the FBO posting

File details come from the government source that posted it. Updated .