Q A_from_Industry_day_-_Final.pdf
PDF 106 KB Posted
- Solicitation number
- QMAA-HM-140013-D
- Issued by
-
GSA Federal Acquisition Service
About this file
Questions and Answers (Q A)from SPARWAR Industry Day - Apr 15 2015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INDUSTRY_DAY_SPAWAR_ATTENDEE_LIST.pdf | ||
| SPAWAR_Industry_Day_Group_QA_Final.pdf | ||
| SPAWAR_PRESENTATION_FINAL_2014-04-12-MCV-SPAWAR_Industry_Day_Brief-F.1.1_(1).pptx | PPTX presentation | |
| SPAWAR_Industry_Day_participant_package.docx | DOCX document | |
| DRAFT_MCV_PD_03.24.2014.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration
US General Services Administration & Navy SPAWAR Mobile Communications Vehicle (MCV) Project Industry Day
April 15, 2014
PANEL DISCUSSION- GROUP QUESTIONS AND ANSWERS
1. Q- Does the MCV require homologation to foreign standards?
A- No, the vehicle shall comply to US DOT and EPA standards
2. Q- Request clarification of conflicting ambient temperature ratings A- The maximum ambient temperature rating shall be 49 degrees Celsius
3. Q- Will the government consider alternative chassis configurations?
A- Yes, the government shall consider configurations other than the chassis specified.
4. Q- Are there threshold specifications for Electro Magnetic Interference (EMI)?
A- No
5. Q- Will the MCV be transported in a trailer during air transport?
A- No
6. Q- Are there human factor specifications for the rear cabin area?
A- Current requirements include compliance to DOT Federal Motor Vehicle Standards. The MCV must exceed 10,000 pounds Gross Vehicle Weight Rating to satisfy the payload requirements.
7. Q- Will the Navy provide math model (geometric) data of the pilot MCV?
A- No, math data is not available.
8. Q- The body mounting requirements appear to conflict with the requirements for sat com antenna mounting plate- torsion properties?
A- Navy/GSA shall review the draft requirements and adjust as required.
9. Q-Are there restrictions to install hood vents?
A- No.
10. Q- Shall the key fob be disabled?
A- Yes, no wireless entry to the vehicle shall be provided.
11. Q- Can exceptions to the technical requirements can be submitted with proposal?
A- Yes, instructions shall be included in the solicitation. The offeror is responsible to clarify and explain all exceptions.
12. Q- Will the government provide the base vehicle as Government Furnished
Equipment (GFE)?
A- The GSA Contracting Officer may consider providing the base vehicle as
GFE, details shall be identified in the solicitation.
1800 F St NW Washington, DC 20405 www.gsa.gov
13. Q- Will the Government request offerors to provide recommended spare parts list?
A- The Government shall consider the options of either requesting recommendations or it may provide a detailed list of required spare parts.
14. Q- Can the Government provide a location where the vehicles will be stationed?
A- The vehicles shall be stationed in the National Capital Region.
15. Q- Will the procurement be a set-a-side?
A- An acquisition strategy has not yet been determined.
16. Q- Are consumables included in warranty?
A- No, GSA/Navy shall identify all items that shall be exceptions to warranty.
17. Q- How shall web based training be executed with security requirements?
A- This requirement shall be amended. GSA/Navy shall amend, clarify, and summarize all items in a Contract Deliverables Requirements List (CDRL) within the final Purchase Description.
18. Q- Is the government considering alternatives to the configuration identified in the draft requirements?
A- The government shall provide updated technical information on the FBO posting
File details come from the government source that posted it. Updated .