QCC 202609800 SAFS.pdf

PDF 157 KB Posted

Attached to
AD Project #202609800 Quinsigamond Community College, Auburn, Boylston, Grafton, Holden, etc.
Solicitation number
BD-27-1019-DCP06-OOL01-132045
Issued by
Massachusetts

About this file

This is a Space Allocation and Finish Schedule document for Quinsigamond Community College, a Massachusetts institution located in Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston, or Worcester. The document outlines the departmental space requirements for Project Number 202609800, requesting approximately 5,600 usable square feet of facility space. The space allocation includes staff areas comprising 438 square feet with 4 staff members and 2 seats; instructional spaces totaling 4,125 square feet including a 2,500-square-foot lab space, a 750-square-foot classroom, a 250-square-foot tool cage, and a 300-square-foot equipment storage area; entry and support areas of 563 square feet encompassing restrooms, an MDF room, and waiting/seating areas; and a 500-square-foot secured outdoor training space with fenced area and concrete pads. The related state and local contract opportunity indicates the request is for a ten-year term, with DCAMM willing to consider space ranging from 4,000 to 7,000 usable square feet.

The Space Allocation and Finish Schedule specifies detailed specifications for each space type, including flooring materials (concrete, ceramic tile, resilient tile flooring, and carpet), partition types, and specialized features such as emergency eyewash stations, gas connections with automatic shut-off, exhaust ventilation, electrical service panels with multiple circuits, audio-visual equipment blocking, and exterior lighting for the outdoor training area. The document does not address pricing terms, set-asides, incumbent information, or funding sources within its scope, as it functions as a technical specification document detailing spatial requirements and finishes rather than procurement or financial terms.

View the file

Other files

File Type Posted
QCC 202609800 SNDA.pdf PDF
QCC 202609800 RFP.pdf PDF
QCC 202609800 RNDA.pdf PDF
QCC 202609800 Office Lease.pdf PDF
QCC 202609800 Estoppel Certificate.pdf PDF
QCC 202609800 Ten-Year Lease Proposal Form.docx DOCX document
QCC 202609800 Warning.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quinsigamond Community College

Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston or Worcester

Project Number 202609800

SECTION B-3

SPACE ALLOCATION AND FINISH SCHEDULE

A TOTAL OF APPROXIMATELY 5,600 USABLE SQUARE FEET

July 2026

B-3. SPACE ALLOCATION AND FINISH SCHEDULE

Project Number 202609800

July 2026

SUMMARY OF SPACE ALLOCATION

Staff Count Seat Count Usable Area

Staff Areas 4 2 438

Instructional Spaces 0 0 4,125

Entry & Support 0 1 563 5,125

SUBTOTAL:

Outdoor Training Space 0 0 500

TOTAL: 4 3 5,625

Quinsigamond Community College

TOTAL PARTI- FLOOR NOTATIONS ON

STAFF SEATS SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

STAFF AREAS

Professor Offices 2 1 200 200 200 Full, UA-Wkstn CPT Lock,sidelight,4-V/D/P Adjunct Offices (Hoteling Office) 2 1 150 150 150 Full, UA-Wkstn CPT Lock, sidelight, 4-V/D/P

Subtotal Staff Areas 4 2 350 350

List of Abbreviations Subtotal 4 2 350 0 350 SF Usable Square Feet Circulation 25% 88 Full Office or room with full height partitions and door

TOTAL USABLE AREA 438 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

Staff Areas

TYPE OF ROOM OR AREA

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Quinsigamond Community College Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston or Worcester

PERSONNEL SPACE SUPPORT SPACE

STAFF SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

SUPPORT AREAS

Lab Space 1 2,500 2,500 2,500 Full CONC Lock,sidelight,V/D/P to User Agency supplied lecturn ,gas connections with automatic emergency shut-off, exhaust ventilation, 600 amp service panel with 12-208v/120v circuits, emergency eye wash station, floor core

Tool Cage 1 250 250 250 Cage CONC Lock, floor to ceiling chain link fencing with 3 'entry gate, Classroom 1 750 750 750 Full CONC Lock, sidelight, V/D/P to User Agency supplied lecturn,wall and ceiling blocking for User Agency AV equipment, floor core Equipment Storage 1 300 300 300 Full CONC Lock, sidelight, 4-duplex outlets

Subtotal Support Areas 3,800 3,800 List of Abbreviations Subtotal 3,800 3,800 SF Usable Square Feet Circulation 25% 325 Full Office or room with full height partitions and door

TOTAL USABLE AREA 4,125 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

Instructional Spaces

TYPE OF ROOM OR AREA

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Quinsigamond Community College Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston or Worcester

Project Number 202609800

PERSONNEL SPACE SUPPORT SPACE

STAFF SEAT SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

Support Single Use Restrooms 3 60 180 180 Full CER Lock, deadbolt with in-use indicator MDF 1 120 120 120 Full RTF Lock, sidelight, HVAC, automatic exhaust

Subtotal Meeting Areas 300 300

ENTRY AREAS

Waiting/Seating 0 1 150 150 150 Full, UA-Wkstn CPT Door bell

Subtotal Entry Areas 0 1 150 150 List of Abbreviations Subtotal 0 1 150 300 450 SF Usable Square Feet Circulation 25% 113 Full Office or room with full height partitions and door

TOTAL USABLE AREA 563 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

TYPE OF ROOM OR AREA

Entry & Support

PERSONNEL SPACE SUPPORT SPACE

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Quinsigamond Community College Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston or Worcester

STAFF SEAT SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

Outdoor Training Space Secure Fenced Area 1 500 500 500 Fence Conc 6'-00" high fencing with 2-3'-00", double gate, 4-6x6 concrete pads for U/A supplied equipment, 4- 208v disconnects, exterior lighting.

Subtotal Outdoor Storage 500 500

List of Abbreviations Subtotal 0 0 0 500 500 SF Usable Square Feet

0 Full Office or room with full height partitions and door TOTAL USABLE AREA 500 UA-Wkstn Open area with user agency-installed systems furniture

LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

TYPE OF ROOM OR AREA

OUTDOOR TRAINING SPACE

PERSONNEL SPACE SUPPORT SPACE

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Quinsigamond Community College Auburn, Boylston, Grafton, Holden, Leicester, Millbury, Paxton, Shrewsbury, West Boylston or Worcester

Cover
Summary
Staff
Instructional Spaces
Entry & Support
Outdoor Storage

File details come from the government source that posted it. Updated .