This document is a Request for Qualifications (RFQ) for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide topographic surveying services to the Fermi National Accelerator Laboratory (Fermilab), which is managed by the Fermi Research Alliance LLC (FRA) for the U.S. Department of Energy.
The RFQ seeks to prequalify a pool of A/E consultants to provide topographic surveying services as task orders under the IDIQ. The selected subconsultants and their sub-tiers will perform topographic surveying and related professional A/E services, including preliminary and final design, cost estimates, schedules, reports, studies, and construction support as requested by FRA. The period of performance is a 2-year base with two 1-year option periods. Qualifications are due by July 8, 2024 at 5:00 PM CST. FRA will evaluate the qualifications based on the responsiveness of the project manager and engineer resumes, the firm's project approach and QA/QC plan, and prior experience at Fermilab and other DOE labs. The IDIQ will be awarded on a firm fixed price basis, and FRA reserves the right to use other procurement methods for similar services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1
Request for Qualifications – Topographic
Surveying Services IDIQ
Professional Engineering Services to Perform Topographic
Surveying (ISD)
Acronyms and Abbreviations
A/E Architect/Engineering
CD Critical Decision
CDR Conceptual Design Report
CHW Chilled Water
CMTF Cryomodule Test Facility
CUB Central Utility Building
DOE U.S. Department of Energy
DWS Domestic Water System
ES&H Environmental, Safety, and Health
Fermilab Fermi National Accelerator Laboratory
FAR Federal Acquisition Regulation
FESHM Fermilab Environment, Safety and Health Manual
FESS Facilities Engineering Services Section
FFP Firm Fixed Price
FRA Fermi Research Alliance, LLC
GIS Geographic Information System
HHW Heating Hot Water
HVAC Heating Ventilation and Air Conditioning
ICW Industrial Cooling Water
IDIQ Indefinite Delivery, Indefinite Quantity
IPR Independent Project Review
LCW Low Conductivity Water
Linac Linear Accelerator
NFPA National Fire Protection Association
PVC Polyvinylchloride
QA/QC Quality Assurance/Quality Control
RFP Request for Proposal
SC Office of Science
SWPPP Stormwater Pollution Prevention Plan
1. INTRODUCTION/PURPOSE
Department of Energy’s (DOE) Fermi National Accelerator Laboratory (FNAL) is America’s premier particle physics and accelerator laboratory that strives to solve the mysteries of matter, energy, space, and time for the benefit for all. Located in Batavia, Illinois, it is managed by the Fermi Research Alliance LLC
(FRA) for the U.S. Department of Energy Office of Science.
FRA’s Infrastructure Services Division – Engineering Department (ISD E) is responsible for managing a wide variety of alterations, repairs, and new construction projects ranging in total project costs from a few thousand dollars up to several million dollars. Typical surveying projects include but are not necessarily limited to topographic surveys related to roadways, parking lots, underground utilities, grading and drainage, stormwater management, and soil erosion and sediment control.
This Statement of Work (SOW) relates to professional A/E Services provided by ISD E to fulfill these responsibilities.
This is a Qualifications Based Selection (QBS) for an IDIQ for a pool of consultants to become pre-qualified to provide engineering services for Topographic Surveying. Prequalified firms will be asked to respond to specific projects proposals and under those task orders the architect/engineering (A/E) subcontractors shall furnish the personnel, facilities, equipment, materials, and supplies necessary to perform the requested scope which may include analysis, preliminary design, and final design related
A/E professional services required for the procurement and construction of identified projects.
2. QUALIFICATION BASED SELECTION OF A/E SUBCONSULTANTS
Qualifications are requested to provide services that will include all normal and customary professional services required of a qualified, professionally licensed A/E firm and its sub-tier subconsultants to support the design, procurement, and construction (e.g. Construction Documents, Bidding, Construction
Administration and Post Construction) on projects consisting of primarily Topographic Surveying.
The types of projects are for Topographic Surveying, and in responding to this QBS the offeror will choose which categories of work they believe themselves to be qualified for and wish to be evaluated.
The selected subconsultant and its sub-tier subconsultants, will complete various tasks in accordance with FRA’s requirements as well as applicable portions of the DOE and State of Illinois codes, ordinances, and regulations as incorporated into contract No. DE-AC02-07CH11359 between the DOE and FRA.
Questions for this requirement are due before June 26, 2024 at 5:00 PM CST.
Qualifications for this requirement are due before July 8, 2024 at 5:00 PM CST.
2.1. Period of Performance
The period of performance for this QBS will be a two (2) year base subcontract with two (2) one-year option periods.
2.2. Categories of Projects
For purposes of allowing offerors to focus on their firms’ strengths and to allow the requesting department to request follow-up on proposals from firms more specifically qualified for the projects, the broad category of structural/civil works has been sub-grouped into the following categories:
2.2.1. Topographic Surveying. The A/E shall furnish the personnel, facilities, equipment, materials, travel, and supplies necessary to perform topographic surveying services, as required by ISD E at Fermilab in Batavia, Illinois, for FRA. The A/E shall perform all tasks in-house or use a team of sub-tier subcontractors approved by FRA to provide complete coverage for all tasks, hereinafter referred to as the Work. A/E services shall include all normal and customary professional A/E services per the Illinois Professional Land Surveyor
Act and the National Society of Professional Surveyors (NSPS) Model Standards for
Topographic Surveys required of a qualified, professionally licensed A/E and its sub-tier subcontractors, and complete the work in accordance with FRA’s requirements as outlined herein, as well as applicable portions of the U.S. Department of Energy and the State of
Illinois codes, orders, and regulations.
The Qualified Subcontractor when asked to do so by FRA, shall furnish the personnel, facilities, equipment, materials, travel, and supplies necessary to perform various services including preliminary and final design, cost estimates, schedules, reports, studies, and subcontractor services during construction, when requested by FRA Procurement Department. The Subcontractor shall perform all tasks in-house or use a team of sub-tier subconsultants approved by FRA.
The awarded subconsultant will provide professional A/E services by task orders which will include additional details in the scope of work, schedule, and budget requirements of each task.
A/E services shall include all normal and customary professional A/E services per the Illinois
Architecture, Professional Engineering, and Structural Engineering Practice Act required of a qualified, professionally licensed A/E and its sub-tier subconsultants. The awarded subconsultant shall complete the various services outlined in section 2.2 in accordance with FRA’s requirements as outlined herein and in any Task Orders.
As projects for services are identified, the firms in the corresponding category will be asked to submit pricing for a specific scope of services on a rotating basis within the category. FRA will then negotiate manhours and fee with the firm based on their proposal. If concurrence cannot be achieved for applicable scope and fee, the next firm in the rotation under the category will be asked to submit a fee proposal. FRA reserves the right to issue a subcontract for similar services through use of other procurement vehicles.
FRA will determine the appropriate category for a project. Elements of projects may fit more than one category and FRA will determine under which category(s) of qualified firms a task order request will be made. The qualified offeror in each category shall be able to accomplish various tasks including but not limited to, the following general requirements:
FRA Topographic Surveying Requirements. The A/E shall have the capability to provide topographic surveying services meeting the following requirements.
o The A/E shall be prequalified by IDOT for Surveying.
o The topographic survey information shall be collected and assembled in accordance with the
Illinois Professional Land Surveyor Act of 1989 and the National Society of Professional
Surveyors (NSPS) Model Standards for Topographic Surveys. The topographic survey information may be collected by drone if it meets the accuracy requirements of the aforementioned Act and Model Standards, and if it complies with FRA drone policies and procedures.
o The topographic survey shall be prepared in the Fermilab Coordinate System.
o The topographic survey shall include the following Data (from the NSPS Model Standards for
Topographic Surveys)
• Existing contours lines indicating the shape and elevation of the land over the entire parcel. The contour interval shall be 1 foot.
• The location of permanent structures including retaining walls, bridges, and culverts.
• The location of street or road paving, entrance drive openings and sidewalks.
• Elevations on the top of curbs, gutters and sidewalks.
• The official street or road names and address numbers assigned to buildings.
https://idot.illinois.gov/doing-business/procurements/engineering-architectural-professional-services/prequalification.html https://www.ilga.gov/commission/jcar/admincode/068/06801270sections.html https://cdn.ymaws.com/nsps.us.com/resource/resmgr/Model_Standards/sectione.pdf https://cdn.ymaws.com/nsps.us.com/resource/resmgr/Model_Standards/sectione.pdf https://ppd.fnal.gov/align/beams-doc-1148.html
• North arrow and scale of drawing.
• Legend depicting the symbols and abbreviations used on the drawing.
• Spot elevations covering the entire survey limits showing high points, low points, grade changes, and at sufficient intervals to represent the general character of the terrain.
• Provide main floor elevations of buildings.
• Location and elevation of lakes, rivers, streams or drainage courses on or near the surveyed parcel.
• Description, location and elevation of bench marks used in the survey.
o The topographic survey shall include the following Optional Items (from the NSPS Model
Standards for Topographic Surveys)
• Location and elevation of at least one bench mark within the limits of the survey.
• Location and diameter of all trees equal to or larger than a 4 inch diameter.
• Perimeter outline only of thickly wooded areas.
• Electric utilities – the location of power poles, guy wires, anchors, vaults, etc., on the parcel or in the streets, roads, alleys, or railroad right of way adjoining the parcel.
• Storm, sanitary or combined sewers – the location of all observable manholes and other structures such as culverts, headwalls, catch basins and clean-outs on the parcel or in streets, roads alleys or railroad right of way adjoining the parcel. Include elevations of the top and bottom of manholes and catch basins. Show type, size, direction of flow and invert elevation of all pipes or culverts.
• Water – the location of any water valves, standpipes, regulators, fire hydrants, etc.
that are visible on the parcel.
• Gas – the location of all valves, meters, and gas line markers that are visible on the parcel. Show elevation on top of any valves.
• Telephone – the location of all poles, manholes, boxes, etc that are visible on the parcel.
• Street lighting – the location of all lamp poles, boxes etc.
• Location of any existing buildings, tanks, fences, miscellaneous structures, driveways, or other obstructions on the parcel.
• Location and elevation of the 100 year floodplain, if applicable for the surveyed parcel.
o Deliverables
• .dwg file of survey with 3D topographic information
• .pdf file of survey
• Hard copies of survey, as requested
• Structure/manhole sheets
• Site photos
• Survey Point file
3. TASK ORDERS
Task orders for A/E professional services will be awarded on a firm fixed price (FFP) basis. The number of tasks to be negotiated will depend upon the availability of funding. This subcontract does not provide for a minimum or maximum number of task orders. The A/E professional services associated with this subcontract will be primarily for operations located at the Fermilab site in Batavia, Illinois.
The Subconsultant will submit a proposal in response to a request by FRA, for each task that proposes the
FFP, the hours by labor category, materials, the scope of the task, a list of proposed deliverables, date of review submittals, and the completion date for the task.
The Subconsultant shall prepare and provide to the FRA, at the times specified in the task order or at such other times as the FRA shall designate, certain deliverables that include, but are not limited to, calculations, plans in Autodesk AutoCAD Civil3D, technical specifications in MS Word format and other deliverables that will be specifically enumerated in the RFP for a task order (hereinafter, collectively
"Deliverables").
3.1. Quality Scope Requirements
The Subcontractor shall submit with each task order proposal, a Corporate Quality Control Plan that details the means and methods the subcontractor will use to ensure the work meets an acceptable quality level specified in the task order proposals.
All tasks shall include the appropriate levels of “Value Engineering” and “Quality Control” to assure that the final product complies with the applicable codes and standards and conforms to the technical requirements of the project. The Subcontractor is responsible for the coordination of the design across all disciplines and all quality assurance of work produced by the subcontractor and their sub-tier subcontractors.
Deliverables such as samples, reports, spreadsheets, sketches, photographs, and drawings shall be provided in accordance with the schedule and delivery dates set by the task order.
4. FRA RESPONSIBILITIES
FRA will be responsible for the development of the general terms and conditions of the construction documents;
4.1. FRA will provide the technical requirements for this project including the capacities and characteristics of existing utilities and services. The subcontractor will be required to coordinate closely with FRA in all phases of design to ensure compatibility with the technical requirements;
4.2. FRA shall have the final decision to allow connections to existing electrical, mechanical, and process water services;
4.3. FRA will submit all required permit applications required by local, state, or federal agencies.
(Note: The subcontractor shall provide information or supporting documentation required for the completion of these permit applications);
4.4. FRA will provide available subsurface investigation reports and existing drawings, calculations, and specifications;
4.5. FRA will provide reviews during the development of the project. These reviews are to assess compatibility with existing site systems and conformance with the technical requirements of the project. These reviews will not replace the subcontractor’s responsibility to perform their own review and verification of the work performed by the subcontractor in accordance with their quality assurance/quality control (QA/QC) program. The FRA reviews assume no professional liability for the performance of the engineered work; and
4.6. FRA will provide all Fermilab-specific training at no cost to the subcontractor.
5. RISK MANAGEMENT
Risk mitigation strategies approved by FRA shall be incorporated into the A/E design.
The completed designs shall be clear, definite, comprehensive, and developed to appropriate scales of detail to be conducive to the SOW for each task order. The A/E firm is responsible for performing the work in accordance with professional standard practices and FRA requirements identified herein.
The Subcontractor shall ensure that architects or engineers registered to practice in the professional field involved in a state, the District of Columbia, or an outlying area of the United States, shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work.
6. QUALITY REQUIREMENTS
The Subcontractor is responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished under this subcontract.
The Subcontractor shall perform its services in accordance with the standards of care and diligence normally practiced by recognized firms in performing services of a similar nature.
The Subcontractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services.
The Subcontractor shall submit this proposal with the Subcontractor’s corporate QA/QC manual that details the means and methods the Subcontractor shall use to ensure that the work meets an acceptable quality level specified in the task order proposals.
All tasks shall include the appropriate levels of value engineering and quality control to assure that the final product complies with the applicable codes and standards and conforms to the technical requirements of the project. The Subcontractor shall coordinate the design across all disciplines and all quality assurance of work produced by the Subcontractor and their sub-tier Subcontractors.
The deliverables shall have been reviewed, verified, and approved by the Subcontractor in accordance with their QA/QC program prior to transmitting deliverables to FRA.
7. Health and Safety
At Fermilab, environmental protection and safety are of the highest importance. FRA’s policy is to protect the environment and the safety and health of all persons, including FRA employees, Subcontractor employees, scientific visitors, and visiting members of the public, from accident or injury while they are present on the Fermilab site or other location managed by FRA. Nothing shall have a higher priority.
Subcontractor employees performing fieldwork (e.g., inspections) on the Fermilab site shall perform such work in compliance with DOE 10 CFR 851 Worker Safety and Health Program (WSHP) under an FRA approved contractor WSHP or adoption of the FRA DOE approved WSHP. The Subcontractor shall prepare a Job Safety Analysis (JSA) using the hazard analysis form in Fermilab Environment, Safety and
Health Manual (FESHM) 7010 and submit for FRA review and approval covering its fieldwork. Any
Subcontractor employees who will perform the fieldwork shall complete the FRA Subcontractor Safety
Orientation training. Questions related to the JSA process can be addressed during the Subcontractor
Safety Orientation.
Those Subcontractor employees performing fieldwork may also be required by FRA to attend other safety training for specific hazards encountered during the work.
Subcontractor designs shall support compliance with DOE 10 CFR 851: Worker Safety and Health
Program, the FESHM, and the Fermilab Radiological Control Manual (FRCM). FESHM and FRCM contains FRA’s policies and procedures designed to manage ES&H hazards in accordance with the requirements of the Work Smart set of ES&H standards attached to the DOE contract.
8. INTEGRATED COST AND SCHEDULE
Submit within 10 business days of receipt of the task order an integrated cost and schedule for the design work to be performed. The schedule will include milestones at the completion of major activities, including project reviews. Monthly submittals
i. Schedule update and progress information, including the following: Narrative description of project progress; and
ii. Identification of work outside the authorized scope, if any.
9. QUALIFICATION SUBMITTAL REQUIREMENTS
Offerors must provide satisfactory evidence of its ability to manage and coordinate the types of activities described in this Solicitation and to produce the specified services on time. As a part of the Solicitation
Response above, Offerors shall demonstrate their qualifications and experience with the submittal of the following resumes of key individuals, relevant projects completed, and the number of professional services and support staff at each office. Succinct responses free from excess marketing materials are preferred and will score higher.
9.1. A statement of interest cover letter (two page maximum) that identifies the categories for which the Respondent wants to be considered, the firms’ primary point of contact and the location of the offeror’s office(s) that will provide the services. Local Offices to the Chicagoland area will score higher than out-of-state offices. If an offeror submits Solicitation Responses for services in multiple categories, then each Response must be a separate submittal responding to the requirements listed.
9.2. Narrative and Company Information
A discussion in narrative form (3-page per category max.) of a successful project approach for each of the categories requested. Provide in the narrative at least one relatively recent example of how the approach was applied to a significant site development or facilities project. The
Narrative should emphasize the firms’ strengths in the category and the Project approach shall briefly explain the general approach of the firm to developing alternatives, evaluating alternatives, and selecting the most feasible alternate Concept design, with an emphasis on how the firm develops cost estimates for budgeting that is based on a less-than complete design. Any tools employed for analysis or cost estimates should be identified in the narrative. The narrative shall also describe the firms Quality Control and Quality Assurance process, with a brief example of where its effectiveness was evident.
9.3. Key Personnel: Offeror shall demonstrate relevant qualifications and experience, including resumes of key individuals, relevant projects completed, and the number of professional services and support staff at each office. The following positions are considered Key Positions and the offeror shall designate the people to fill these roles. The Project Manager and Project Engineer
(s) offered shall have relevant training and experience to support the firms request and submit resumes (2-page max.) and a two-page (maximum) explanatory narrative on the person highlighting any important or unique experience or training that the person brings to the role, and any additional information asked in the requirements listed below.
9.4. Project Manager
Minimum 10 years professional experience, Registration as a professional Engineer in the State of Illinois. Experience with Federal Projects (2-minimum) in a significant role will rank higher.
Knowledge of Engineering and typical permitting practices in the Northeastern Illinois area, demonstrated by experience with industrial site development or other significant site development is a minimum requirement, and shall be noted on the resume, with at least three noted on the explanatory narrative. Designate only one Project Manager for the firm, as they will also be the primary point of contact for contracting and all correspondence with the firm. The
Project manager may also serve as the Project Engineer in one category.
9.5. Project Engineer(s)
A Project Engineer shall be designated for each category of qualification that he firm seeks consideration for. The persons designated shall have as minimum qualifications (except as noted below) an Engineering degree and professional registration in the State of Illinois, with 5-years’ experience in projects relevant to the category, reflected in the resume. The explanatory narrative should emphasis three concrete and specific examples of relatively recent projects that the Project engineer played a significant role that included development of initial design alternatives, concept designs and final plans and specifications, with estimates of construction cost and coordination of permitting.
Designate one per category, and the firm may utilize the same person for more than one category if their range of education, training and experience supports more than one category. When a single person is designated for more than one category, an explanatory narrative for each category is still required.
The structural category requires the designated Project Engineer with a Professional Structural
Engineering license in the State of Illinois. In addition, a firm seeking qualification in this category must have at least one other Licensed Structural Engineer (SE) on-staff for quality control purposes and shall list the name of the second Illinois SE on the explanatory Narrative.
The category of Specialty Environmental Resources Support does not require the person designated to be an Engineer for the wetlands work but must be a Professional Wetland Scientist (PWS) with a minimum of the last 5-years practicing in the area of the USACE Chicago District. The Specialty Environmental
Resources Support category shall also designate an Engineer for work related to NPDES permitting if the
PWS designated is not also an Engineer.
10. QUALIFICATION EVALUATION
10.1. EVALUATION CRITERIA
The evaluation team will make the selection of one or more offerors (if any) to subcontract with FRA on the basis of demonstrated competence and qualifications, and subject to the negotiation of a fair and reasonable pricing arrangement.
Solicitation Responses must not include any information regarding the offerors fees, pricing or other compensation.
Firms submittals will be evaluated by category based on the following, in order of priority:
• Responsiveness of the resume of the Project Manager to the outlined requirements.
• Responsiveness of the explanatory narrative for the Project manager to the outlined requirements.
• Responsiveness of the Resume of the Project Engineer (s) to the outlined requirements.
• Responsiveness of the explanatory narrative for the Project Engineer to the outlined requirements.
• Responsiveness of the Firms Project Approach and QC/QA plan to the outlined requirements.
• Responsiveness of the firms cover letter to the outlined requirements.
• Prior history of work at Fermilab, if any, as reflected in the required narratives and resumes to the outlined requirements.
• Prior History of work at other DOE National Labs, as reflected in the required narratives and resumes.
• Location of the primary office out of which the majority of the work will be performed, with offices in the Chicagoland area and proximal to Fermilab scoring higher.
11. INCORPORATED DOCUMENTATION
• FRA’s A/E Consultant Handbook
• FRA’s Design Guides
• FRA’s CAD Standards
• FRA’s Building Information Modeling (BIM) Guide
• FRA’s Graphic Standards at Fermilab
• Fermilab Environment, Safety and Health Manual
• Fermilab Radiological Control Manual (FRCM)
• DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets,
• Guiding Principles for Sustainable Federal Buildings and Associated Instructions by the Council on
Environmental Quality
• Fermilab Environment, Safety and Health Manual
To access these guides, please follow the links below:
Engineering guides and standards | Infrastructure Services (fnal.gov)
Fermilab Environment, Safety and Health Manual (FESHM) | Environment, Safety and Health (fnal.gov)
Fermilab Radiological Control Manual (FRCM) | Environment, Safety and Health (fnal.gov) https://fess.fnal.gov/engineering-guides-standards/ https://eshq.fnal.gov/manuals/feshm/ https://eshq.fnal.gov/manuals/frcm/
File details come from the government source that posted it. Updated .