This is a technical construction plans document for the Swedwood 69/15 kV Substation project in Danville, Virginia, prepared by Utility Engineering, LLC and issued for bids on August 31, 2026. The project encompasses a complete electrical substation design package including a general arrangement plan, grounding system design, detailed equipment specifications, and cross-sectional details. The substation is designed to operate at 69 kilovolt (high voltage) and 15 kilovolt (low voltage) with multiple incoming transmission lines from Airside, Cyberpark, and AEP sources. Key infrastructure components include two main transformers (T1 and T2) with load tap changer capability ranging from 15/20/25/28 MVA, multiple 72.5 kV and 15 kV circuit breakers, a 40' x 11.5' control house, station service transformers, surge arresters, voltage transformers, and an extensive grounding system with 10-foot sectional Copperweld ground rods and 4/0 AWG bare copper wire at 36 inches depth. The site includes a perimeter security fence with gate access and eight 15 kV underground feeders. The overall substation layout covers approximately 215 feet in length and 177.5 feet in depth, with equipment arranged according to RUS Bulletin 1724E-300 design standards for spacing and clearances.
The grounding design specifications include detailed connection methodologies utilizing Anderson & Fargo connectors, exothermic connections for permanent installations, and comprehensive bonding of all equipment and structures to the main ground grid. The plans specify vertical clearance requirements per NESC Part 124A3, mandating minimum 8.5-foot clearances to energized equipment for worker safety. All conductor spacing and equipment arrangements follow established design standards for 69 kV and 25 kV outdoor switchgear, with voltage insulation levels of 350 kV BIL for 69 kV equipment and 150 kV BIL for 25 kV equipment. The document indicates these plans were submitted to the client on August 31, 2026, with the status marked as "Issued for Bids." The drawings are designed for full-size plotting on 24" x 36" sheets and include comprehensive notes regarding future material expansion (shown in gray) versus new construction materials (shown in black).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-27-016-SWEDWOOD SUBSTATIONS PACKAGE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
30' 30' 30' 30' 30' 30' 30' 30' 30'
30'
30'
30'
30'
30'
30'
30'
30'30'30'30'30'30'30'30'
30'
30'
30'
30'
30'
30'
10'
10'
10'
10'
10'
10'
10'10'
10'
10'
10' 10'
10'
10' 10'
10'
10'
10'
5'-0"4'-0" 19'-11 2" 28'-11
2" 28'-11 2" 28'-11
2" 28'-11 2" 28'-11
2" 28'-11 2" 19'-11
2" 4'-0"5'-0"
5' -0
"4 '-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
4'
-0 "5
'-0
5'-0"4'-0" 19'-11 2" 28'-11
2" 28'-11 2" 28'-11
2" 28'-11 2" 28'-11
2" 28'-11 2" 19'-11
2" 4'-0"5'-0"
5' -0
"4 '-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
'-0
4'
-0 "5
'-0
225'-0"
0'
-0
SWITCH OPERATOR GROUND PLATFORM 3' X 4' CONNECTED TO SWITCH OPERATOR
CABLE TRENCH
4/0 AWG S.D. BARE COPPER WIRE AT 36" DEEP FROM FINAL GRADE
EXOTHERMIC CONNECTION
NEW SUBSTATION FENCE
LEGEND
# REVISION NUMBER
3/4"Ø 10' SECTIONAL COPPERWELD GROUND RODS10'
G R
O U
N D
IN
G
P
LA
N
/3
1/
1/
'-0
C D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
NOTES FOR NEW GROUNDING:
1. GROUNDING DETAILS ARE SHOWN ON DRAWINGS 240, 241 & 242.
2. GROUNDING SPECIFICATIONS ARE SHOWN ON DRAWING 340.
FUTURE FOUNDATIONS ARE GRAYED OUT
FOUNDATIONS ARE BLACK
(3) 3/4"Ø 10' SECTIONAL COPPERWELD GROUND RODS COUPLED
TOGETHER30'
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
R O
U N
D
IN
G P
LA
N
.D W
G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
AutoCAD SHX Text N
AutoCAD SHX Text
SCALE: 3/32" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
AutoCAD SHX Text 16'
AutoCAD SHX Text 20'
AutoCAD SHX Text 24'
AutoCAD SHX Text 28'
AutoCAD SHX Text 32'
AutoCAD SHX Text 36'
AutoCAD SHX Text 40'
AutoCAD SHX Text 2'
'-6
8'
-0
7' -4
8'
-8
'-0
'-0
'-3
'-3
'-0
5'
-0
'-0
5' -0
5'
-0
7' -6
7'
-6
30'-6"8'-0"16'-0"12'-6"15'-0"10'-0"10'-0"
2'-6"
11'-0"5'-0"21'-0"10'-0"15'-0"
5' -0
51'-0"
'-0
'-0
5' -0
" 10 '-0
'-6
'-6
'-6
'-0
5'
-6
'-6
'-0
'-0
'-0
7' -4
3' -6
TY
P.
8' -8
8'
-0
'-6
3'-6" 20'-0" 11'-6" 8'-0" 8'-0" 8'-0" 7'-4" 8'-8" 7'-4" 8'-8" 8'-6" 8'-6" 7'-4" 8'-8" 7'-4" 8'-8" 8'-0" 8'-0" 8'-0" 18'-6" 3'-0"6'-0" 20'-0" 3'-6"
67'-0"97'-0"51'-0"
215'-0"
7'
-6
'-6
SS S SS S
Aɸ
Bɸ
Cɸ
Aɸ
Bɸ
Cɸ
S
S
S
S
S
SAɸ
Bɸ
Cɸ
Aɸ
Bɸ
Cɸ
Aɸ
Bɸ
Cɸ
Aɸ
Bɸ
Cɸ
Aɸ
Bɸ
Aɸ
Bɸ
Cɸ
Cɸ Bɸ Aɸ
Cɸ Bɸ Aɸ
Cɸ Bɸ
Aɸ
69kV LOW BUS
3" AL. TUBE
kV
H
IG
H B
U S
3" A
L.
T
U
BE
69kV LOW BUS
3" AL. TUBE
Cɸ Bɸ
Aɸ kV
H
IG
H B
U S
3" A
L.
T
U
BE
kV
H
IG
H B
U S
3" A
L.
T
U
BE
69kV LOW BUS
3" AL. TUBE
' X
1.
5' C
O N
TR
O
L H
O U
SE
Aɸ
Bɸ
Cɸ kV
H
IG
H B
U S
3" A
L.
T
U
BE
Cɸ
0'
-0
69kV LINE FROM AIRSIDE
69kV LINE FROM CYBERPARK
69kV LINE FROM AEP
69kV LINE FROM AEP kV
B
KR
(5 2-
F6 kV
B
KR
(5 2-
F7 kV
B
KR
(5 2-
F5 kV
B
KR
-B kV
B
KR
(5 2-
F4 kV
B
KR
(5 2-
F3 kV
B
KR
(5 2-
F2
15kV BKR (52-F1)
SST
(SS1)
15kV BKR (52-T1)
15kV BKR (52-F8)
SST
(SS2)
(1)
VT
TRANSFORMER
(T1)
TRANSFORMER
(T2)
72.5kV
GOABS
kV
G O
AB
S kV
G O
AB
S
72.5kV
GOABS
72.5kV
GOABS
72.5kV
GOABS
72.5kV BKR (52-R3)
15'-0" 10'-0" 10'-0"
72.5kV BKR (52-R2)
15'-0" 10'-0" 10'-0"
72.5kV BKR (52-R4)
'-0
15'-0"10'-0"10'-0"
72.5kV BKR (52-R5)
36'-0" 25'-0" 36'-0"
72.5kV
GOABS
72.5kV
GOABS
72.5kV BKR (52-R6)
69kV
BUS SUPPORT
5' -0
(1)
VT
(1)
VT
5' -0 kV
BU
S
SU
PP
O R
T kV
BU
S
SU
PP
O R
T
N -S
BA
SE
LI
N
E
N -S
BA
SE
LI
N
E
.5 kV B
KR
(5
2- R
1)
.5 kV G
O
AB
S
.5 kV G
O
AB
S
E-W
BASELINE
A
A
B B
C C
DD
E E
F
F
G
G
H H
H
H
H
H
I I
J
J
K
K
L
L
M
M
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
PL
AN
/3
1/
1/
'-0
C D
C
H M
T H M
T
8/
/2
R
EL
EA
SE
D
F O
R B
ID
S
C D
C
NOTES:
1. LOWSIDE WILL OPERATE AT 12.47kV (110 kV BIL) BUT WILL BE INSULATED TO 25kV (150kV BIL).
2. PER NESC, PART 124A3, THE VERTICAL CLEARANCE ABOVE ANY PERMANENT SUPPORTING
SURFACE FOR WORKERS TO THE BOTTOM OF ANY EQUIPMENT, BUS, BUSHING, ETC. WITH
INDETERMINATE POTENTIAL SHALL BE NOT LESS THAN 8.5 FEET.
3. ALL PHASING IS ASSUMED AND SHOULD BE VERIFIED BEFORE IFC.
4. INCOMING LINE LOCATIONS ARE TBD.
NOMINAL Ø TO Ø
VOLTAGE kV
BIL
kV
METAL
TO
METAL
℄ TO ℄
PHASE
SPACING
MIN. TO
GROUNDED
PARTS
MIN. BARE
CONDUCTOR
TO GROUND
MIN. BARE
CONDUCTOR
TO ROADWAY
VERTICAL BREAK
DISCONNECT
SWITCHES
SIDE OR HORIZONTAL
BREAK DISCONNECT
SWITCHES
ALL HORN
GAP
SWITCHES
PHASE SPACING FOR OUTDOOR SWITCHESCONDUCTOR SPACING
DESIGN BASED ON RUS BULLETIN 1724E-300, TABLE 4-7 & 4-8 OF THE "DESIGN FOR RURAL SUBSTATIONS".
12.47
31" 15" 12"
60" 30" 24"
15" 10" 7"
11' 10' 9'
23' 22' 21'
60" 30" 24"
72" 36" 30"
84" 48" 36"
PERSONNEL SAFETY
LEGEND:
EX - EXPANSION JOINT
F - FITTED CONNECTION
S - SLIP CONNECTION
SA - SURGE ARRESTER
NEW MATERIALS ARE BLACK
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
0, R
0, R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
EN
ER
AL
A
R R
AN
G
EM
EN
T
PL
AN
, S
EC
TI
O N
S, D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
SCALE: 3/32" = 1'-0"
0 4' 8' 12' 16' 20' 24' 28' 32' 36' 40'2'
FENCE
FUTURE MATERIALS ARE GRAY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4X 105°
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4X 105°
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4X 105°
N
OHGW
EACH SIDE
5'-0"
10' STATIC MAST
7'-6" 7'-6" 5'-0"
℄ OF 4" AL. BUS
25'-0"
795 ACSR
'-0
'-0
'-0
'-0
℄ OF INCOMING
LINE
72.5kV GOABS
SECTION A-A
10' STATIC MAST
16'-0"12'-6"
5'-0"5'-0"5'-0"5'-0"
4" AL. TUBE
15'-0"
AɸBɸCɸ
Aɸ
(2) 500
MCM CU.
10'-0"10'-0"13'-6"13'-6"
(2) 500
MCM CU.
10'-0"10'-0"
AɸBɸCɸ AɸBɸCɸ
15'-0"
Aɸ
5'-0"
5'-0"5'-0"
'-0
℄ OF 4" AL.
LOW BUS
℄ OF 4" AL.
HIGH BUS
5' -0
'-0
72.5kV CB (52-R1)
72.5kV CB (52-R2)
(3)
VT'S
795 ACSR
7 #8 OHGW
S.A.
SECTION D-D
72.5kV
GOABS
72.5kV
GOABS
72.5kV
GOABS
72.5kV
GOABS
69kV VT'S
'-0
72.5kV GOABS
'-0
795 ACSR
'-0
OHGW
EACH SIDE
5'-0"
10' STATIC MAST
7'-6" 7'-6" 5'-0"
℄ OF 4" AL. BUS
25'-0"
795 ACSR
'-0
'-0
'-0
'-0
℄ OF INCOMING
LINE
72.5kV GOABS
SECTION B-B
69kV VT'S
OHGW
EACH SIDE
5'-0"
10' STATIC MAST
7'-6" 7'-6" 5'-0"
℄ OF 4" AL. BUS
25'-0"
795 ACSR
'-0
'-0
'-0
'-0
℄ OF INCOMING
LINE
72.5kV GOABS
SECTION C-C
69kV VT'S
Aɸ Bɸ Cɸ S.A.
S.A. S.A.
Aɸ Bɸ Cɸ Cɸ Bɸ Aɸ
10' STATIC MAST
4" AL. TUBE
Aɸ
Aɸ
(3)
VT'S
795 ACSR
7 #8 OHGW
S.A.
'-0
72.5kV GOABS
'-0
795 ACSR
'-0
10'-0"
AɸBɸCɸ
5'-0"5'-0"
15'-0"
SECTION E-E
'-0
℄ OF 3" AL.
LOW BUS
℄ OF 3" AL.
HIGH BUS
5' -0
'-0
SCALE: 1/8" = 1'-0"
32'24'16'8'4'0 2'
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
0, R
0, R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
EN
ER
AL
A
R R
AN
G
EM
EN
T
PL
AN
, S
EC
TI
O N
S, D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
SE
C
TI
O
N S
A- A, B -B
, C -C
, D -D
E
-E
/3
0/
1/ 8"
'-0
C D
C
H M
T H M
T
8/
/2
R
EL
EA
SE
D
F O
R B
ID
S
C D
C
NEW MATERIALS ARE BLACK
FUTURE MATERIALS ARE GRAY
LEGEND
NOTES:
1. ALL PHASING IS ASSUMED AND SHOULD BE VERIFIED BEFORE IFC.
(TYPICAL)
PERIMETER GROUND WIRE CONDUCTOR
PERIMETER GROUND WIRE CONDUCTOR
PERIMETER GROUND WIRE CONDUCTOR
#2 T
IN
N
ED
C
U
DANGER SIGNS ARE SHOWN FOR ILLUSTRATIVE
PURPOSES ONLY. SIGNAGE SHOULD MEET IEEE
& LOCAL CODE REQUIREMENTS
TYPICAL
1'-6" MAX
LINE POST
NTS
CORNER POST
NTS DOUBLE GATE/PERSONNEL GATE
NTS
FENCE POST
TYPE O.D. (INCHES) ANDERSON & FARGO CATALOG
No.
GATE 4 GPC350-25
CORNER 3 GPC250-25
LINE 2 58 GPC200-25
TOP RAIL 1 58 GPC125-13
GATE FRAME 2 GPC150-13
#2 T
IN
N
ED
C
U
BARBED WIRE OR
FENCE FABRIC
#2 CU ON
BOTTOM
SEPARATOR
BAR
ANDERSON & FARGO
TOP-RAIL CLAMP FOR #2 CU
GC111
ANDERSON AND FARGO SPLIT BOLT FOR 4/0
CU TO @ CU, SBS-250. ENSURE THAT THE
SPLIT BOLT S ABOVE THE TOP LEVEL OF
YARD STONE
ANDERSON & FARGO
GROUND CLAMP FOR
4/0 CU TO POST
GC111
EXOTHERMIC
CONNECTION
FOR ATTACHMENT OF #2 CU TO BARBED WIRE OR
FENCE FABRIC USE ANDERSON & FARGO
SPLIT-BOLT CONNECTOR SBS-2 (TYP)
TYPICAL
BARBED WIRE OR
FENCE FABRIC
#2 CU ON
BOTTOM
SEPARATOR
BAR
EXOTHERMIC
CONNECTION
3' -0
" M
AX
(T
YP
IC
AL
" M
IN
(T
YP
IC
AL
ANDERSON & FARGO
SPLIT-BOLT CONNECTOR
SBS-2 (TYP)
ANDERSON & FARGO
GROUND CLAMP FOR #2
CU AND FLEXIBLE BRAID
GC111
ANDERSON & FARGO
GROUND CLAMP FOR
4/0 CU TO POST GC111 ANDERSON AND FARGO SPLIT BOLT FOR 4/0
CU TO @ CU, SBS-250. ENSURE THAT THE
SPLIT BOLT IS ABOVE THE TOP LEVEL OF
YARD STONE
ANDERSON & FARGO
FLEXIBLE BRAID
GB2005B
FOR ATTACHMENT OF #2 CU TO BARBED WIRE
OR FENCE FABRIC USE ANDERSON & FARGO
SPLIT-BOLT CONNECTOR SBS-2 (TYP)
ANDERSON & FARGO
GROUND CLAMP FOR
4/0 CU TO POST GC111
ANDERSON AND FARGO SPLIT BOLT FOR 4/0
CU TO #2 CU, SBS-250. ENSURE THAT THE
SPLIT BOLT IS ABOVE THE TOP LEVEL OF
YARD STONE
EXOTHERMIC
CONNECTION
G R
O U
N D
IN
G
D
ET
AI
LS
/3
1/
N
TS C
D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
DWG. NO.
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\2
R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
R O
U N
D
IN
G D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
AutoCAD SHX Text
DANGER
AutoCAD SHX Text
HIGH VOLTAGE
AutoCAD SHX Text
KEEP OUT
AutoCAD SHX Text
KEEP OUT
AutoCAD SHX Text
HIGH VOLTAGE
DANGER
4/0 CU TO SWITCHGEAR
IF NECESSARY
4/0 CU GROUND GRID
NOTE:
FOR UNIFORMITY AND EASE OF USE THE HORIZONTAL PARALLEL TEE
SHOWN HERE IS THE PREFERRED TYPE OF CONNECTION.
ALTERNATIVELY, THE TEE AND CROSS SHOWN BELOW ARE ACCEPTABLE.
BA
TT
ER
Y
R
AC
K
LE
G
TYPICAL HV SURGE ARRESTER GROUNDING
NTS
THOMAS & BETTS TY-FAST
EDGE CABLE CLAMP
PART #N4NY-008-9-M
(CONTRACTOR TO FURNISH IF NOT PROVIDED BY TRENCH
MANUFACTURER)
NOTE: BOND TO GROUND GRID CONDUCTOR AT EACH INTERSECTION.
ALSO, BOND 4/0 CU TO CONTROL HOUSE GROUNDING SYSTEM AT ONE
END OF CABLE TRENCH AND BOND TO GROUND GRID CONDUCTOR AT
OPPOSITE END(S) OF CABLE TRENCH.
CONTROL BUILDING BATTERY RACK
NTS
CONTROL BUILDING CABLE TRAY
NTS
EXOTHERMIC CONNECTION: PARALLEL
NTS
EXOTHERMIC CONNECTION: TEE
NTS
EXOTHERMIC CONNECTION: CROSS
NTS
CABLE TRENCH
NTS
EXOTHERMIC CONNECTION: GROUND ROD
NTS
COUPLER
IF NEEDED
4/0 COPPER
INSTALL AT 4'-0" O.C.
(TYPICAL)
4/0 COPPER
4/0 COPPER ALONG LENGTH
OF CABLE TRAY
3/
4"
STAINLESS STEEL FASTENER, CONSISTING
OF ONE BOLT, ONE NUT, ONE FLATWASHER,
AND ONE SINGLE-COIL LOCKWASHER (TWO
FASTENERS NEEDED PER CONNECTION).
EXOTHERMIC TERMINAL FOR 4/0 COPPER
WITH TWO-HOLE NEMA SPACING
4/0 COPPER TO
GROUND GRID
4/0 COPPER TO
STATIC MAST
4/0 COPPER TO
GROUND GRID
4/0 COPPER TO
STATIC MAST
4/0 COPPER
G R
O U
N D
IN
G
D
ET
AI
LS
/3
1/
N
TS C
D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\2
R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
R O
U N
D
IN
G D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
TRANSFORMER
PAD
TRANSFORMER
NOTE: TYPICAL EACH TRANSFORMER GROUND BAR LOCATION
CIRCUIT BREAKER
NTS
TRANSFORMER GROUND
NTS
G R
O U
N D
R O
D
DUAL
4/0 COPPER
COPPER
GROUND BAR
GROUND GRID
CONNECTOR
GROUND GRID
CONDUCTOR
LI
G
H
TN
IN
G
M
AS
T
G R
O U
N D
R O
D
EQUIPMENT
BOX
EQUIPMENT BOX
NTS
LIGHTNING MASTS
NTS
SWITCH OPERATOR PLATFORM
NTS
STRUCTURE COLUMN
NTS
ANDERSON & FARGO
GC-143-A02 PARALLEL
CONNECTOR (TYPICAL)
4/0 COPPER
SINGLE CONNECTOR
(AS NEEDED)
PARALLEL CONNECOR
#2 COPPER
ANDERSON & FARGO KS-2
POST CONNECTOR
(TYPICAL)
PIPE
CLAMP
SINGLE
CONNECTOR
SINGLE
CONNECTOR
SINGLE
CONNECTOR
CONTINUOUS
4/0 COPPER
ANDERSON
& FARGO
GC-141-A02
SINGLE
CONNECTOR
(TYPICAL)
SWITCH
OPERATOR
PLATFORM
SWING
HANDLE
OPERATOR
PIPE
PARALLEL
CONNECTOR
CONTINUOUS
4/0 COPPER
CONTINUOUS
4/0 COPPER
PARALLEL
CONNECTOR
SWITCH HANDLE, GROUND CLAMP, AND
BRAIDED COPPER STRAP PROVIDED BY
SWITCH MANUFACTURER
FINISHED
SUBSTATION
GRADE YARD
STONE
SUBGRADE
4/0
COPPER
ANDERSON & FARGO
GC-141-A02 SINGLE
CONNECTOR (TYPICAL)
COLUMN
PIER
3' -0
" M
IN 4'
-0
" M
AX
(T
YP
IC
AL
GROUND GRID
CONNECTOR
GROUND GRID
CONNECTOR
GROUND GRID
CONNECTOR
GROUND GRID
CONNECTOR
COLUMN
PIER
G R
O U
N D
IN
G
D
ET
AI
LS
/3
1/
N
TS C
D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\2
R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
R O
U N
D
IN
G D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C
'-0
℄ OF 4" AL.
LOW BUS
℄ OF 4" AL.
HIGH BUS
5' -0
'-0
AɸBɸCɸ
5'-0"5'-0"
15'-0" 20'-0"
72.5kV
GOABS
72.5kV
GOABS
72.5kV
GOABS
(2) 500
MCM CU.
10'-0" 10'-0" 20'-6" 14'-6" 5'-0"
AɸBɸCɸ
5'-0"5'-0"
25'-0"
AɸBɸCɸ
5'-0"5'-0"
17'-0"
(2) 500
MCM CU.
TRANSFORMER
T2
72.5kV CB (52-R3)
Cɸ
'-0
SPARE CONDUIT
CAPPED (CENTER Ø)
SA
Cɸ
'-0
3'
-6
M
IN
8'-0" 16'-0"
S
S
2' -6
M
IN
2'
-6
M
IN
Cɸ Bɸ Aɸ 4'-6" 3'-6" 3'-6" 4'-6"
17'-0"
#2
CU
S S S
S S S
15kV CB (52-T2)
(2) 500
MCM CU.
10' STATIC MAST
(2) 500
MCM CU.
MCM CU.
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
℄ OF 3" AL. TUBE MAIN BUS
(4) 3" SCH.
80 PVC
(TYP.)
15kV CB (52-F7)
℄ OF 2" AL.
FEEDER BUS
500 MCM CU.
15kV FDR.
#7
SECTION G-GSECTION F-F
TRANSFORMER
T2
Cɸ Bɸ Aɸ 4'-6"3'-6"3'-6"4'-6"
VT JCT.
BOX
SMD-20
CLF
(2) 500
MCM CU.
#2 CU.
(2) 500
MCM CU.
F
F
25kV
DISC. SW.
S
'-0
SPARE CONDUIT
CAPPED (CENTER ɸ)
SA
CɸS
#2
CU
(4) 3" SCH.
80 PVC
(TYP.)
℄ OF 2" AL.
FEEDER BUS
500 MCM CU.
15kV FDR.
#8
'-0
3'
-6
M
IN
2' -6
M
IN
2'
-6
M
IN
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
℄ OF 3" AL. TUBE MAIN BUS
15kV CB (52-T2)
10' STATIC MAST
EX
EX
Aɸ
Cɸ Bɸ Aɸ 4'-6"3'-6"3'-6"4'-6"
EX
Cɸ Bɸ Aɸ 4'-6"3'-6"3'-6"4'-6"
SMD-20
CLF
M
IN
IM
U
M
0' -0
#2
CU
#2
CU
VT JCT.
BOX
5' -0
17'-0"
FUT. BKR.
16'-0"16'-0"8'-0"8'-0"8'-0"
AɸBɸCɸ 4'-6" 3'-6" 3'-6" 4'-6"
VT JCT.
BOX
SMD-20
CLF
(2) 500
MCM CU.
#2 CU.
(2) 500
MCM CU.
F
F
25kV
DISC. SW.
S
'-0
SPARE CONDUIT
CAPPED (CENTER ɸ)
SA
Cɸ S
#2
CU
(4) 3" SCH.
80 PVC
(TYP.)
℄ OF 2" AL.
FEEDER BUS
500 MCM CU.
15kV FDR.
#1
'-0
3'
-6
M
IN
2' -6
M
IN
2'
-6
M
IN
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
℄ OF 3" AL. TUBE MAIN BUS
15kV CB (52-T1)
10' STATIC MAST
EX
EX
Aɸ
AɸBɸCɸ 4'-6" 3'-6" 3'-6" 4'-6"
EX
AɸBɸCɸ 4'-6" 3'-6" 3'-6" 4'-6"
SMD-20
CLF
M
IN
IM
U
M
0' -0
#2
CU
#2
CU
VT JCT.
BOX
5' -0
17'-0"
FUT. BKR.
16'-0" 16'-0" 8'-0" 8'-0" 8'-0"
25kV GOABS25kV GOABS
SECTION H-H
Aɸ Bɸ Cɸ 4'-6"3'-6"3'-6"4'-6"
F
F
S
'-0
℄ OF 2" AL.
FEEDER BUS
'-6
3'
-6
M
IN
2' -6
M
IN
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
10' STATIC MAST
EX
EX
Aɸ
Aɸ Bɸ Cɸ 4'-6"3'-6"3'-6"4'-6"
EX
Aɸ Bɸ Cɸ 4'-6"3'-6"3'-6"4'-6"
SMD-20
CLF
M
IN
IM
U
M
0' -0
#2
CU
#2
CU
VT JCT.
BOX
5' -0
17'-0"16'-0"16'-0"8'-0"8'-0"8'-0"
CɸBɸAɸ 4'-6" 3'-6" 3'-6" 4'-6"
F
F
S
'-0
℄ OF 2" AL.
FEEDER BUS
'-6
3'
-6
M
IN
2' -6
M
IN
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
15kV CB (52-F7)
10' STATIC MAST
EX
EX
CɸBɸAɸ 4'-6" 3'-6" 3'-6" 4'-6"
EX
CɸBɸAɸ 4'-6" 3'-6" 3'-6" 4'-6"
SMD-20
CLF
M
IN
IM
U
M
0' -0
#2
CU
#2
CU
VT JCT.
BOX
17'-0" 16'-0" 16'-0" 8'-0" 8'-0" 8'-0"
SECTION I-I
15kV CB (52-B1)
15kV CB (52-B1)
15kV CB (52-F6)
15kV CB (52-F5)
25kV GOABS
5' -0
MCM CU.
TANDEM
DISC. SW.
25kV GOABS
15kV CB (52-F2)
15kV CB (52-F3)
15kV CB (52-F4)
MCM CU.
TANDEM
DISC. SW.
CLF
#2
CU
M
IN
IM
U
M
0' -0
5'
-0
#2 CU TO Cɸ ONLY
NOTE:
FEEDER #8 NOT
SHOWN FOR CLARITY
CLF
#2
CU
M
IN
IM
U
M
0' -0
5'
-0
#2 CU TO Cɸ ONLY
NOTE:
FEEDER #1 NOT
SHOWN FOR CLARITY
SST
(SS1)
SST
(SS2)
GROUNDING STUDSGROUNDING STUDS
SCALE: 1/8" = 1'-0"
32'24'16'8'4'0 2'
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
0, R
0, R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
EN
ER
AL
A
R R
AN
G
EM
EN
T
PL
AN
, S
EC
TI
O N
S, D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
SE
C
TI
O
N S
F- F, G -G
, H -H
I-
I
/3
1/
1/ 8"
'-0
C D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
NEW MATERIALS ARE BLACK
FUTURE MATERIALS ARE GRAY
LEGEND
NOTES:
1. ALL PHASING IS ASSUMED AND SHOULD BE VERIFIED BEFORE IFC.
AutoCAD SHX Text
CLA
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STRUCTURE GROUND CONNECTION DETAIL
NTS
DUAL CONDUCTOR CLAMP SINGLE CONDUCTOR CLAMP
NOTE: USE SINGLE CONDUCTOR CLAMP IF ONLY THE
STRUCTURE IS GROUNDED. USE DUAL CONDUCTOR CLAMP TO
EXTEND THE GROUND CONDUCTOR UP THE STRUCTURE TO
GROUND EQUIPMENT, LIGHTNING MASTS, ETC. WHEN
CONTINUING THE GROUND CONDUCTOR UP THE STRUCTURE
INSTALL A SINGLE CONDUCTOR CLAMP A MINIMUM OF EVERY
FOUR FEET.
1/2" BOLT 1/2" BOLT
TO SINGLE
CONDUCTOR POLE
CLAMP
TO GROUND GRID
APPLY ELECTRICAL JOINT COMPOUND
TO BOTH CONNECTORS. USE TRANSITION
PLATES FOR COPPER TO ALUMINUM
CONNECTIONS, ONLY
CLAMPING BOLT TIGHTENING TORQUE
BOLT SIZE TORQUE VALUE
(in) (lbf-in) (lbf-ft) (N-m) 3/8 240 20 27
13/32 288 24 32 7/16 360 30 41 1/2 480 40 54 9/16 576 48 65 5/8 660 55 75
STAINLESS STEEL, GALVANIZED STEEL, OR SILICON BRONZE
BOLTS
ELECTRICAL CONNECTIONS
NTS
HEAVY HEX HEAD BOLT, 1/2" DIA x VARIOUS LENGTH
GALVANIZED STEEL, COURSE THREAD
FLAT WASHER, 1/2" DIA,
GALVANIZED STEEL
BELLEVILLE WASHER, 1/2" DIA
GALVANIZED STEEL
HEAVY HEX HEAD NUT, 1/2" DIA
GALVANIZED STEEL,
COURSE THREAD
ALUMINUM
TUBE
3/4"
ALUMINUM
TUBE
D R
IV
E
FI
T
NOTE: END OF EACH ALUMINUM TUBE MUST BE
CLOSED WITH AN END CAP, OR APPROVED EQUAL.
FOUR-HOLE NEMA TEE DETAIL
NTS
FELD WELD
4 HOLE NEMA
DRILLING
FELD WELD
BUS SUPPORT DETAIL
NTS
FIELD WELD FOR FIXED SUPPORT, ONLY
3/4" 3"
QUANTITY AND LOCATION OF COUPLINGS AS NEEDED
TUBECL
CL
WHEN INVERTED,
FIELD DRILL
1/4" Ø SEEP HOLE
FOR DRAINAGE
FIELD
WELD
FIELD DRILL
1/4" Ø SEEP HOLE
FOR DRAINAGE
TYPICAL WELDED TEE CONNECTOR
NTS
WELDED TERMINAL
NTS
WELDED COUPLER
NTS
FIELD DRILL 1/4" Ø SEEP
HOLE FOR DRAINAGE
CONTACT SURFACE
NEMA 4 HOLE PAD
SPACERS
180° APART-WELD OVER
FIELD WELD
ALL AROUND
EXPANSION BUS SUPPORT
NTS
ALUMINUM
TUBE
GROUND STUD CONNECTER DETAIL
NTS
BUS END CAP DETAIL
NTS
A-FRAME BUS
NTS
2'-8"
2'-0"
3" ALUM TUBE
2" ALUM TUBE
3" ALUM TUBE
FIELD DRILL 1/4" Ø
HOLE FOR DRAINAGE
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
0, R
0, R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
EN
ER
AL
A
R R
AN
G
EM
EN
T
PL
AN
, S
EC
TI
O N
S, D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
D
ET
AI
LS
/3
1/
N
TS C
D C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N C
C
3'-6" 3'-6"
(4) 3" SCH 80
PVC
(SPARE
CONDUIT
CAPPED @
CENTER ɸ)
'-0
CU
GROUNDING STUDS
SPARE CONDUIT
CAPPED (CENTER Ø)
SA
CU
CU
AɸBɸCɸ
Cɸ
4'-6" 3'-6" 3'-6" 4'-6"
S
S
#2
CU
EX EXEX
EX EXEX
EX
4'-6" 3'-6" 3'-6" 4'-6"
8'-0" 8'-0"
'-0
5'
-0
7' -6
℄ OF MAIN BUS
FROM GOABS
CLF &
SMD-20
BUS 1
METERING VT'S
#2
CU
#2
CU
SPACERS(2) 500
MCM CU.
VT JCT.
BOX GOABS
OPERATOR
15kV CB (52-B1)
Cɸ Bɸ Aɸ 4'-6"3'-6"3'-6"4'-6"
8'-0"8'-0"
'-0
5'
-0
7' -6
℄ OF MAIN BUS
FROM GOABS
CLF &
SMD-20
BUS 1
METERING VT'S
#2
CU
#2
CU
SPACERS (2) 500
MCM CU.
VT JCT.
BOXGOABS
OPERATOR
15kV CB (52-B1)
CɸBɸAɸ
15kV CB
(FUT)
15kV CB (52-F3)
SECTION J-J SECTION K-K
(4) 3" SCH.
80 PVC
(TYP.)
15kV FDR.
#3
'-0
℄ OF 2" AL.
FEEDER BUS
'-0
3'
-6
M
IN
2' -6
M
IN
2'
-6
M
IN
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 2" AL. TUBE TRANSFER BUS
℄ OF 3" AL. TUBE MAIN BUS
℄ OF 3" AL. TUBE MAIN BUS
8'-0" 16'-0" 8'-0"
UG 15kV
FEEDER 1
TYPICAL FOR
ALL
FEEDERS
SECTION L-L
SECTION M-M
SCALE: 1/8" = 1'-0"
32'24'16'8'4'0 2'
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
0, R
0, R
0, R
0, R
- D
AN
VI
LL
E-
SW
ED
W O
O D
G
EN
ER
AL
A
R R
AN
G
EM
EN
T
PL
AN
, S
EC
TI
O N
S, D
ET
AI
LS
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C O
M
G
EN
ER
AL
A R
R
AN
G
EM
EN
T
SE
C
TI
O
N S
J- J, K -K
, L -L
M
-M
/3
1/
1/ 8"
'-0
C D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
NEW MATERIALS ARE BLACK
FUTURE MATERIALS ARE GRAY
LEGEND
NOTES:
1. ALL PHASING IS ASSUMED AND SHOULD BE VERIFIED BEFORE IFC.
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text H2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ESTCODE
ESTCODE
S.A.
72kV MOSA 57kV MCOV
S.A.
10kV MOSA 8.4kV MCOV
52-R2
TO FUTURE
AMP SUBSTATION
(3) VT'S
RITZ 72.5kV
40,250: 115/67.08V 350/600:1
(3) S.A.
72kV MOSA 57kV MCOV
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
72.5kV, 2000A
GOABS
52-R3
72.5kV, 2000A
GOABS
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
(3) VT'S
RITZ 72.5kV
40,250: 115/67.08V 350/600:1
(3) S.A.
72kV MOSA 57kV MCOV
52-R1
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
72.5kV, 2000A
GOABS
TO FUTURE
AMP SUBSTATION
(3) VT'S
RITZ 72.5kV
40,250: 115/67.08V 350/600:1
(3) S.A.
72kV MOSA 57kV MCOV
52-R6
72.5kV, 2000A
GOABS
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
(1) VT Cɸ
RITZ 72.5kV
40,250: 115/67.08V 350/600:1
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
72.5kV, 2000A
GOABS
(3) VT'S
RITZ 72.5kV 40,250: 115/67.08V 350/600:1
(3) S.A.
72kV MOSA 57kV MCOV
72.5kV, 2000A
GOABS
72.5kV, 2000A
CIRCUIT
BREAKER
72.5kV, 2000A
GOABS
(1) VT Aɸ
RITZ 72.5kV
40,250: 115/67.08V 350/600:1
52-R4
52-R5
72.5kV, 2000A
GOABS
72.5kV, 2000A
GOABS
72.5kV, 2000A
GOABS
72.5kV, 2000A
GOABS
52-T2
VCB
25kV, 2000A
DISC. SW.
25kV, 2000A
DISC. SW.
15kV, 2000A
CIRCUIT
BREAKER
CLF
1AMP
(1) VT Cɸ
60:1
52-F6
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV
52-F5
VCB
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV 15kV FDR #5
UNDERGROUND
LINE
15kV FDR #6
UNDERGROUND
LINE
TR
AN
SF
ER
BU
S
52-F7
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV 15kV FDR #7
UNDERGROUND
LINE
52-F8
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA 8.4kV MCOV
15kV FDR #8
UNDERGROUND
LINE
25kV, 2000A
GOABS
15kV, 2000A
BUS CIRCUIT
BREAKER
25kV, 2000A
GOABS
52-B1
VCB
15kV, 1200A
CIRCUIT
BREAKER
CLF
1AMP
(3) VT Cɸ
60:1
CLF
1AMP
(3) VT Cɸ
60:1
TRANSFORMER T2 - LTC
15/20/25//28 MVA
69 TO 12.47kV
STATION
SERVICE
XFMR #2 Cɸ
(SS2)
3 AMP
CLF
S.A.
72kV MOSA 57kV MCOV
S.A.
10kV MOSA 8.4kV MCOV
72.5kV, 2000A
GOABS
52-T1
VCB
25kV, 2000A
DISC. SW.
25kV, 2000A
DISC. SW.
15kV, 2000A
CIRCUIT
BREAKER
CLF
1AMP
TRANSFORMER T1 - LTC
15/20/25//28 MVA
69 TO 12.47kV
(1) VT Cɸ
60:1
52-F3
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV
52-F4
VCB
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV
15kV FDR #4
UNDERGROUND
LINE
15kV FDR #3
UNDERGROUND
LINE
TR
AN
SF
ER
BU
S
52-F2
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA
8.4kV MCOV
15kV FDR #2
UNDERGROUND
LINE
52-F1
VCB
15kV, 1200A
CIRCUIT
BREAKER
25kV, 1200A
TANDEM
DISC. SW.
25kV, 1200A
DISC. SW.
(3) S.A.
10kV MOSA 8.4kV MCOV
15kV FDR #1
UNDERGROUND
LINE
15kV, 1200A
CIRCUIT
BREAKER
STATION
SERVICE
XFMR #1 Aɸ
(SS1)
3 AMP
CLF
M
AI
N
BU
S M
AI
N
BU
S
TO AIRSIDE
SUBSTATION
TO CYBERPARK
SUBSTATION
72.5kV, 2000A
GOABS
O N
E
LI
N E
D
IA
G R
AM
PH
YS
IC
AL
/3
1/
N O
N E
C D
C
H M
T H M
T
8/
/2
IS
SU
ED
F O
R B
ID
S
C D
C
DWG. NO.
D
ES
C R
IP
TI
O N
D
AT
E R
EV
C
LI
EN
T
PR
O J.
R
EF
. N o.
D
AT
E:
SC
AL
E:
D W
N B
Y:
C
KD
B Y:
AP
PV
D B
Y:
PR
O
J.
N o.
: 2
2-
8-
U :\U
TI
LI
TY
EN
G
IN
EE
R
IN
G
\C
LI
EN
TS
\D
AN
VI
LL
E
VA
\S U
BS
TA
TI
O
N S\
SW
ED
W O
O D
\D R
AW
IN
G S
ET
\C
O D
Y D
W G
S\
SU
BM
IT
TE
D
T O
U E
.3
1.
\1
R
- D
AN
VI
LL
E-
SW
ED
W O
O D
O
N E-
LI
N
E D
IA
G
R
AM
; P H
YS
IC
AL
.D
W G
BY
TH
IS
D R
AW
IN
G S
IZ
E
IS
4" X
6"
. W H
EN
P
LO
TT
ED
F
U
LL
S
IZ
ED
, T
H
IS
L
IN
E W
IL
L
PL
O
T
AS
-IN
C H
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
SE
AL
IS
SU
ED
F
O R
B
ID
S
C O
PY
R
IG
H
T
B Y
U
TI
LI
TY
EN
G
IN
EE
R
IN
G , L
LC
C
IT
Y O
F D
AN
VI
LL
E
D
AN
VI
LL
E, V
IR
G
IN
IA
SW
ED
W O
O D
9/ kV
S U
BS
TA
TI
O
N
LI
C
EN
SE
O
BE
R
LI
N
R O
AD
, S
U
IT
E
R
AL
EI
G H
, N C
U
TI
LI
TY
EN
G
IN
EE
R
IN
G
.C
| 26-27-016 Plans 140 |
| Sheets and Views |
| 140 |
| 26-27-016-Plans 120 |
| Sheets and Views |
| 120 |
| 26-27-016-Plans 121 |
| Sheets and Views |
| 121 |
| 26-27-016-Plans 240 |
| Sheets and Views |
| 240 |
| 26-27-016-Plans 241 |
| Sheets and Views |
| 241 |
| 26-27-016Plans 242 |
| Sheets and Views |
| 242 |
| 26-27-019 Plans 122 |
| Sheets and Views |
| 122 |
| 26-27-019 Plans 220 |
| Sheets and Views |
| 220 |
| 26-27-Plans 123 |
| Sheets and Views |
| 123 |
| QB-26-27-016 Plans 101 |
| Sheets and Views |
| 101 |
File details come from the government source that posted it. Updated .