About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a janitorial services contract with the U.S. Forest Service for the Comanche National Grassland Office in Springfield, Colorado. The QASP outlines the government's approach to monitoring and evaluating contractor performance, with specific performance standards for services including floor/carpet cleaning, window washing, furniture and wall surface cleaning, bathroom and kitchen sanitization, trash removal, and entrance area maintenance. The surveillance plan includes detailed performance rating definitions (ranging from Exceptional to Unsatisfactory) and a comprehensive surveillance matrix with minimum acceptable levels, with potential invoice deductions of 1% for performance below 90-95% of specified standards.
The contract will be managed by Kurt Staton (Program Manager) and Stephen Holly (Contracting Officer) from the Forest Service, with surveillance conducted through random and periodic sampling methods. The QASP emphasizes that the contractor is responsible for quality control, and the government will use methods such as performance reports, corrective action reports, and customer complaint forms to track and address any service deficiencies. The document provides a flexible framework for continuous oversight, with the ultimate goal of ensuring that janitorial services meet or exceed the specified contract requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ComJanitorialFY2025_PWS r3.docx | DOCX document | |
| WD 2015-5433 r30.pdf | ||
| List of Sustainable Products.pdf | ||
| _1240LP25Q0124.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) Version – 07/30/2025
For Comanche Janitorial Contract Contract Number: TBD Contract Description: Janitorial Services Contractor’s Name: Steve Holly
1. Vision
The vision of this Quality Assurance Surveillance Plan is to ensure quality assurance at the Contractor level.
2. Mission
The mission of this Quality Assurance Surveillance Plan is to ensure Contractor performance meets or exceeds contract terms, conditions and specifications; To hold the Contractor accountable for quality control; and to encourage the Contractor to take appropriate steps to control and improve quality.
3. Purpose
This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance and their Quality Assurance/Quality Control (QA/QC) actions to assure they meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) or Functional Services Manager (FSM) – The PM/FSM provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities. While the PM/FSM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf.
Assigned PM/FSM: Kurt Staton Organization or Agency: Forest Service Telephone: 701-934-5954 Email: Kurt.Staton@usda.gov
Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO: Stephen Holly Organization or Agency: Forest Service Email: Stephen.holly@usda.gov
Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for surveillance of the contractor’s quality program and help the COR to document contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Other Key Government Personnel (enter name or delete this line if not applicable) This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
Contractor Representatives
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Contractor Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Contractor Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
6. Performance Requirements and Method of Surveillance
6.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the CO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2. Surveillance Matrix
The Surveillance Matrix (see Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance and frequency the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
6.3. Performance Rating Definitions
The performance ratings below reflect definitions at FAR 42.1503 Table 42-1. The COR will use these rating to evaluate the quality of contractor’s performance. [If your organization requires that you use a different rating mechanism, insert it here.]
Performance Rating Definition
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Note 1: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change the evaluation status.
Note 2: N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
6.4. Methods of Surveillance include but are not limited to: Random Sampling and Periodic Sampling
RANDOM SAMPLING: Performance will be reviewed on the criteria of The Surveillance Matrix. The sampling will be conducted on an unscheduled basis with little notice of it being conducted. Unplanned inspections are to determine the integrity of the services being conducted.
PERIODIC SAMPLING: Performance will be reviewed on the criteria of The Surveillance Matrix. Sampling will be conducted on the first business day of the month throughout the duration of the contract. Planned inspections are to enforce consistency of performance of work conducted.
7. Performance Reporting
7.1. Corrective Action Report (CAR)
Describes how discrepancies are reported and resolved (see sample CAR below).
7.2. Customer Complaint Form
(See sample customer complaint form below)
7.3. Performance Assessment Report (PAR) (See sample customer PAR below)
Appendix 1 - Surveillance Matrix Performance Standard
Minimum Acceptable Level (MAL)
Disincentive
Method of Surveillance
Floors/carpets Clean and free of dirt and debris
| No more than 2 visible marks or accumulations of dust, dirt, or other foreign object/ material over ½ in. in size. |
| Re work within 2 hours of notification. |
1% deduction of monthly invoice if below 90% or below of MAL
Random Sampling and Customer Comments
Windows/Glass Cleaned and free of dirt, streaks and smudges
| No more than 2 visible marks in excess of ½ in. in size |
| Re work within 2 hours of notification. |
1% deduction of monthly invoice if below 90% or below of MAL
Random Sampling and Customer Comments
Furniture/wall surfaces Cleaned and free of visible dust, dirt, and debris
| No more than 2 visible marks or accumulations of dust, dirt, smudges or other foreign object/material over ½ in. size. |
| Re work within 2 hours of notification. |
1% deduction of monthly invoice if below 90% or below of MAL
Random Sampling and Customer Comments
Bathrooms/Kitchen Clean/Sanitized
| No visible rust/encrustation in toilets, No more than 2 marks or accumulations of dust, dirt, smudges or other foreign object/material over ½ in. size. |
| Re work within 2 hours of notification. |
1% deduction of monthly invoice if below 95% or below of MAL
Random Sampling and Customer Comments
Removal of trash Emptied and cleaned
| No more than 2 trash receptacles with ¼ of trash remaining |
| Re work within next day of notification. |
1% deduction of monthly invoice if below 90% or below of MAL
Random Sampling and Customer Comments
| Front Entrance (outside area) |
| No visible trash, and kick plates/push bars with no more than 2 visible marks in excess of ½ in. in size |
| Re work within 2 hours of notification. |
1% deduction of monthly invoice if below 90% or below of MAL
Random Sampling and Customer Comments
Monthly cleaning of wall surfaces within 70 in.
of the floor
| No more than 2 visible marks or accumulations of dust, dirt, smudges or other foreign object/material over ½ in. size. |
| Re work within next day of notification. |
1% deduction of monthly invoice if below 90% of MAL
Random Sampling and Customer Comments
| Semi-annual stripping/applying floor finish to kitchen and restroom floors |
| No more that 2 visible marks or accumulations of dust, dirt, smudges or other foreign object/material over ½ in. size. |
| Re work within next day of notification. |
1% deduction of monthly invoice if below 90% of MAL
Random Sampling and Customer Comments
| Semi-annual cleaning of outside windows and blinds, |
| No more than 2 visible marks or accumulations of dust, dirt, smudges or other foreign object/material over ½ in. size. |
| Re work within next day of notification |
1% deduction of monthly invoice if below 90% of MAL
Random Sampling and Customer Comments
Inspection Metrologies:
M1: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS