QASP Laundry.pdf

PDF 282 KB Posted

Attached to
S209--Laundry & Linen Service
Solicitation number
36C24626Q0939
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a Department of Veterans Affairs contract. The QASP establishes systematic methods to monitor contractor performance, define acceptable quality levels, and document compliance with contract terms.

The QASP identifies key government personnel responsible for surveillance: Contracting Officer Jamie Sullivan and Contracting Officer's Representative (COR) Ronald Spangler from the Department of Veterans Affairs. The contractor's program manager position is listed as "TBD." Surveillance methods include direct observation requiring daily reporting at 100% coverage, periodic/random inspections conducted quarterly, validated customer complaint analysis compiled weekly and reviewed by the Laundry Supervisor, and verification of contractor-provided documentation through daily action reporting. The document establishes three primary performance objectives with 95% acceptable quality levels: adherence to background requirements per PWS Section 2, compliance with specific scope requirements per PWS Section 1, and fulfillment of specific tasks per PWS Sections 1 and 2. Performance ratings are measured as positive outcomes (98% or greater), acceptable outcomes (97-95%), and unacceptable outcomes (less than 95%). Incentives for favorable performance include positive evaluations, while disincentives include Contract Discrepancy Reports (CDRs) issued on first instance of failure, potential 5% monthly invoice reductions for two or more CDRs, and possible contract termination for failure to meet acceptable service levels. The contractor must respond in writing to COR notifications of non-compliance within five business days and provide corrective action plans. The COR provides quarterly written performance reports to the Contracting Officer, and the QASP is designated as a living document subject to revision through contract modification.

View the file

Other files

File Type Posted
36C24626Q0939 0001.pdf PDF
36C24626Q0939.pdf PDF
WD - 2015-4423 Rev. 34.pdf PDF
36C24626Q0939.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government's responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a "living document" and the Government may review and revise it on a regular basis.

However, the Government shall coordinate changes with the contractor through contract modification.

Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities. The work performed under this contract shall be subject to evaluation by the COR/CO via the QASP.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United

States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Jamie Sullivan Contracting Officer’s (CO)

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Ronald Spangler

Contracting Officer’s Representative (COR)

Department of Veterans Affairs

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

Program Manager – TBD

4. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION: 100% surveillance Action required via daily reporting. Surveillance results must be able to support action taken by the COR/Contracting Officer when nonperformance or unacceptable performance occurs.

b. PERIODIC/ RANDOM INSPECTION: Inspections scheduled and reported quarterly per COR delegation or as needed.

c. VALIDATED USER/CUSTOMER COMPLAINTS: Customer complaint data will be obtained via

Customer feedback and will be compiled weekly and reviewed by Laundry Supervisor and reported to the Service Chief. Any validated complaints against the Contractor which are not resolved within seven business days will be further investigated.

d. VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR: Contractor provided documentation will be reviewed via required daily action reporting.

5. INCENTIVE/DISINCENTIVES FOR ACCEPTABLE QUALITY LEVEL (AQL)

The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If issues are repetitive or consistent, the government shall take further corrective action or begin termination procedures. Incentives and Disincentives shall be based on exceeding, meeting, or not meeting performance standards.

a. Positive and negative performance will be documented locally (contract file) and/or in the appropriate contractor performance assessment reporting system/database.

b. Noncompliance to contract standards will be corrected at no cost to the government. The government reserves the right and may elect to measure/document negative performance through utilization of a performance report and/or a contract discrepancy report.

c. The contractor shall respond in writing to the Contracting Officer Representative (COR) to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the

Contracting Officer Representative and/or the Contracting Officer. The contractor's response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.

6. PERFORMANCE STANDARDS (MEASURES)

The contractor is responsible for performance of ALL terms and conditions of the contract.

CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. The performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements Summary Matrix is listed below in Table 1. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the

Acceptable Quality Level (AQL).

Table 1-Performance Requirements Summary Matrix

Acceptable Quality Level of Performance

ID Performance Objective

Acceptable

Quality

Level

Method of

Surveillance Incentive/Disincentive

The Contractor shall adhere to the

Background

Requirements in accordance with (IAW)

PWS Section 2.

95%

CO/COR Periodic

Surveillance

Periodic surveillances will be conducted on a scheduled basis

(daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.

Incentive: favorable contractor performance evaluation.

Disincentive:

A Contract Discrepancy Report

(CDR) will be issued on the first instance of failure to provide the acceptable level of service

Two or more issued CDRs may result in reduction of the monthly invoice of 5%.

adhere to the Specific

Scope Requirements

(IAW) PWS Section 1.

95%

CO/COR Periodic

Surveillance

Incentive: favorable contractor performance evaluation.

Disincentive:

A Contract Discrepancy Report

(CDR) will be issued on the first instance of failure to provide the acceptable level of service

Failure to provide the acceptable level of service may be grounds to terminate the contract adhere to the Specific

Tasks in (IAW) PWS

Section 1 & 2.

95% CO/COR Periodic

Surveillance

Incentive: favorable contractor performance evaluation.

Disincentive:

A Contract Discrepancy Report

(CDR) will be issued on the first instance of failure to provide the acceptable level of service

Failure to provide the acceptable level of service may be grounds to terminate the contract

7. CONTRACT PERFORMANCE MONITORING

Government personnel will monitor the contractor's performance to ensure contract compliance and that the VA is receiving the services. The government will be monitoring the following items:

a. CONTRACTOR PERFOMRANCE – Contractor shall uphold all standards and requirements as stated in the PWS.

b. CUSTOMER SATISFACTION – The Contractor shall provide satisfactory customer service with no customer complaints.

c. INVOICE VERIFICATION RECORDS – The Contractor must provide a complete and accurate invoice each month.

8. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Positive outcome: 98% or greater successful completion/outcome.

Acceptable outcome: 97%-95% Successful completion/outcome.

Unacceptable outcome: Less than 95% successful completion/outcome.

9. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.

When the COR determines formal written communication is required, the COR shall prepare a Contract

Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CDR below.

NETWORK CONTRACTING OFFICE (NCO) 6

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER

Report Number: Date:

2. TO: (Contractor and Manager Name) 3. FROM: (Contracting Officer’s Representative Name)

DATES

CONTRACTOR NOTIFICATION: CONTRACTOR RESPONSE

DUE BY:

RETURNED BY

CONTRACTOR:

ACTION COMPLETE:

4. DISCREPANCY OR PROBLEM (Describe in detail; Include reference in PWS / Directive. Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)

6. TO: (COR) 7. FROM: (Contractor)

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION, AND ACTIONS TO PREVENT RECURRENCE (Attach continuation sheet if necessary.)

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE 10. DATE

11. GOVERNMENT EVALUATION OF CONTRACTOR RESPONSE/RESOLUTION PLAN (Acceptable response/plan, partial acceptance of response/plan, rejection. Attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment withholding, cure notice, show cause, other.)

CLOSE OUT

CONTRACTOR NOTIFIED

NAME AND

TITLE

SIGNATURE DATE

COR

CONTRACTING OFFICER

10. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall communicate with the Contractor and will provide written reports to the Contracting

Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.

REVISIONS TO QASP: revisions to the surveillance plan are the joint responsibility of the COR and the Contracting Officer.

11. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

Signature – Contractor Program Manager Date

Signature – Contracting Officer’s Representative Date

File details come from the government source that posted it. Updated .