View the file

Other files for this federal contract opportunity

Other files attached to Benefits Methods Development and Other Relevant Analyses for the Evaluation of Air Pollution Control Policies, newest first.
File Type Posted
Questions and Answers Final ID04200073 10 22 2020 .xlsx XLSX spreadsheet
ITO SOW v4 ID04200073 Amd 001 10 22 2020.pdf PDF
Pricing Spreadsheet ID04200073 08 13 2020.xlsx XLSX spreadsheet
ITO SOW v3 ID04200073 09 30 2020.pdf PDF
ITO Attachment Previous Experience Information Sheet ID04200073 06 23 2020.docx DOCX document
Past Performance Questionaire ID04200073 08 13 2020.doc DOC document
Questions and Answers Attachment ID04200073 06 22 2020.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE BASED

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR: ID04200073

TASK ORDER NUMBER: ID04200073

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Performance Requirements Matrix in the task order. The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the task order. The role of the Government is quality assurance to ensure task order standards are achieved.

In this task order the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” task order is to ensure that the quality control program approved at the beginning of the task order provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

Deliverable or Required Services

(1) Performance Standard(s)

(2) Acceptable Quality Level (AQL)

(3) Method of Surveillance

(4)

Statement of Work Section C.3 and all applicable subsections
Ensure delivery

of all CDRLs by the contractor adhere to the quality requirements and within the timeframe identified or ahead of schedule Quality CDRLs are delivered as identified within the specified timeframe 98% of the time.

100%

Inspections

Statement of Work Section C.3 and all applicable subsections
Ensure completed task orders are invoiced and submitted to the Government in a timely manner.
Invoices are received by the Government from the contractor within 60 calendar days of completion of task order.
100% Inspection
Section I and all applicable subsections
Compliance with Small

Business Subcontracting

Requirements

Contractor meets or exceeds small business requirements
100% Inspection through eSRS

SURVEILLANCE

The Government will evaluate the performance objectives through surveillance as reflected above by reviews and acceptance of work products and services.

STANDARD

The Contractor shall perform all work required in a satisfactory manner in accordance with the appropriate PWS paragraph. The QA shall not consider the services complete until all deficiencies have been corrected. The Contracting Officer’s Representative (COR) or Contracting Officer’s Technical Representative (COTR) shall notify the Contracting Officer for appropriate action if any of the above performance objectives are not in accordance with acceptable AQL.

PROCEDURES

The COR will inspect all tasks required by the task order to ensure Contractor compliance with the task order requirements. Inspection results will be recorded in a Surveillance Log noting the date, time and result of inspection or verification.

The COR will document all defects using a “Task Discrepancy Report (TDR)”. The COR will verbally notify the GSA Project Manager (PM) or Contracting Officer (CO) of the defect and will submit a copy of the TDR as an Action Memo in ITSS to the GSA PM/CO. The COR will ensure the TDR is completed in its entirety and coordinated through the Contracting Officer. The Contractor will also be furnished a copy of the TDR. The Contractor shall furnish their response to the TDR. The Contractor’s response will address the accuracy and validity of the defect, planned corrective action and actions to prevent recurrence. The TDR information will be included when assessing the Contractor’s overall performance (i.e., past performance assessments, exercise of options, etc.).

If any of the services do not conform to the task order requirements, the Government may require the Contractor to perform the services again in conformity with task order requirements. The Contractor must correct the defect(s) within the timeframes established in the PWS. The COR shall not certify satisfactory performance for the task order until all defects have been corrected.

When the defects in services cannot be corrected by re-performance, the Government may:

1) Require the Contractor to take necessary action to ensure that future performance conforms to task order requirements; and,

2) Reduce the task order price to reflect the reduced value of the services performed.

The COR shall, in addition to providing documentation to the GSA PM/CO, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions relating to the Government’s performance of the quality assurance function, including originals of all surveillance activity checklists. All such records will be retained for the life of the task order. The COR shall forward these records to the GSA PM/CO at completion or termination of the task order.

The COR shall upload a copy of the Surveillance Log as an Action Memo in ITSS addressed to the GSA PM/CO at least once every three months.

ACCEPTANCE OF SERVICES

Acceptance of services shall be based upon compliance with performance standards described in the PWS and surveillance procedures described in this QASP. Prior to approving/certifying any Contractor invoices, the COR will verify that all invoiced services have been performed in compliance with task order requirements. The COR shall not certify satisfactory performance for the task order until all defects have been corrected.

SURVEILLANCE LOG

TASK ORDER TITLE:

TASK ORDER NUMBER:

Task Requirement
PWS

Ref.

Method of

Surveillance Date

Accomplished Compliance Results

Task Discrepancy Report

1. Task Order Number:
2. Report Number

3. To: (Contractor and Manager’s Name)

4. From: (Name of Client Representative)

5.

Dates

Prepared:
Returned by Contractor
Action Completed

6. Discrepancy or Problem: (Describe in detail; include reference to PWS Directive; attach continuation sheet if necessary.)

Contractor Response

7. To: (Contracting Officer)

8. From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence; Attach continuation sheet if necessary. (Cite applicable Q.C. program procedures or new Q.C. procedures)

10. Government Evaluations (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

11. Government Actions (Reduced payment, cure notice, show cause, other)

Closeout

Name-Title

Signature

Date

Contractor Notified

Client Rep

CO/PM

File details come from the government source that posted it. Updated .