This Quality Assurance Surveillance Plan outlines the requirements for housekeeping equipment preventive maintenance services and repair at the G.V. "Sonny" Montgomery VA Medical Center in Jackson, Mississippi. The contractor shall provide preventive maintenance and corrective repairs on approximately 72 pieces of housekeeping equipment on a bi-monthly basis. Performance will be evaluated on completion of preventative maintenance according to manufacturer standards, timely repairs, adherence to the schedule, qualifications of personnel, and documentation. The total small business set-aside contract will be awarded for one year with an option to extend for four additional years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EQUIPMENT LISTING Table A.xlsx | XLSX spreadsheet | |
| S02 Final Combined Synopsis 36C25620Q0920 Houskeeping Equip PM Svcs.docx | DOCX document | |
| Wage Determination 2015-5153 REV 11 (06-26-2020).pdf | ||
| Annex 3 Typical Equipment Lifetimes.pdf | ||
| Solicitation Questions Request Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
HOUSEKEEPING EQUIPMENT PREVENTIVE MAINTENANCE SERVICES AND REPAIR
G.V. (SONNY) MONTGOMERY VA MEDICAL CENTER
JACKSON, MS
1.
INTRODUCTION
This Quality Assurance Surveillance Plan has been developed to evaluate Contractor performance while implementing and executing Performance Work Statement (PWS) tasks/deliverables for this requirement. It is designed to provide an effective surveillance method for monitoring and evaluating the Contractor’s performance for the requirements listed in the Performance Work Statement (PWS).
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the Contractor will accomplish the work that is required by the PWS. Rather, this QASP has been created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis to ensure that the QASP remains a valid, useful, and enforceable document. However, the Government will coordinate changes with the Contractor (if changes are required). Copies of the original QASP and revisions will be provided to the Contractor and Government officials implementing surveillance activities.
2.
OBJECTIVE
The foundation of this Quality Assurance Surveillance Plan (QASP) is derived from the Objective of this requirement which is the following: Contractor shall provide the following services for the facility: Housekeeping Equipment Preventive Maintenance Services and Repair (for a specified list of housekeeping equipment) to ensure continuous operation of this equipment in support of facility operations at G. V. (Sonny) Montgomery VA Medical Center. Such an effort will be supported through preventive maintenance services and corrective maintenance & repairs that are performed on the equipment while the contract is active.
3.
GOVERNMENT ROLES AND RESPONSIBILITIES
The following Government personnel are responsible for overseeing and coordinating surveillance activities.
1). Contracting Officer Representative (COR): The COR is responsible for technical administration of the contract and is responsible for ensuring proper Government surveillance of the Contractor’s performance. The COR is responsible for keeping a quality assurance file and after the contract, or when requested by the CO, providing corresponding documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
2). Contracting Officer (CO): The CO is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the contract terms, and safeguarding the interests of the United States in the contractual relationship. The CO is responsible for ensuring that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Upon award or before the performance period start date of the contract the individuals who will be involved in the execution of this Quality Assurance Surveillance Plan (QASP) will be identified.
4. PERFORMANCE INDICATORS (MEASURES). Contractor performance will be rated/evaluated by the COR or other authorized designee using the following metrics in the table below. The contractor’s performance under the terms and conditions of this contract will be based on how successfully the contractor executes the tasks/deliverables listed in the Performance Work Statement (PWS). At a minimum, the contractor must complete the required tasks and deliverables that are contained within the Performance Work Statement for this requirement.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) – PERFORMANCE METRICS
HOUSEKEEPING EQUIPMENT PREVENTIVE MAINTENANCE SERVICES AND REPAIR
G.V. (SONNY) MONTGOMERY VA MEDICAL CENTER JACKSON, MS
| Task NAME & PWS Reference |
| TaSK Description |
| schedule, EXPLANTION, Performance Standard |
| Acceptable Quality Levels (AQL) |
| Incentives/ |
Disincentives for Meeting/ Not Meeting AQL
| Preventive Maintenance Services (PWS Sections 5 and 9) |
| Contractor performs Preventive Maintenance Services on the equipment. |
| Contractor performs all required preventative maintenance services according to the standards, |
guidelines, and based on the recommendations from the Original Equipment Manufacturer (OEM) for all equipment in EQUIPMENT LISTING – Table A.
| 100%. (Unless there are issues and/or mitigating circumstances which includes actions by the government that prevents or limits contractor performance) |
| 1,2,3, & Quarterly Contractor Performance and Quality Control Meeting |
| Corrective Maintenance & Repairs (PWS Sections 5 and 9) |
| Contractor performs Corrective Maintenance & Repair on the equipment. |
| Contractor repairs equipment that is broken, inoperable, needs repair, and/or is otherwise not operating at full capacity/full functionality. |
| 100%. With prior approval, equipment is repaired or otherwise returned to an operable condition. Or a BER assessment is made which facilitates replacement of such equipment that cannot or should not be repaired. |
| 1,2,3, & Quarterly Contractor Performance and Quality Control Meeting |
| Schedule (PWS Section 9) |
| Contractor executes services and completes tasks/deliverables IAW scheduling timelines which includes proper check in and check out procedures while on site. |
| Two (2) visits to the site monthly to execute services for a minimum of sixteen (16) hours each month. |
| 100% (Contractor meets frequency and duration of schedule as outlined) |
| 1,2,3, & Quarterly Contractor Performance and Quality Control Meeting |
| Qualifications of Personnel performing services and executing tasks/deliverables (PWS Section 8) |
| Qualifications of Personnel |
| Personnel performing services are knowledgeable of the original equipment manufacturer standards associated with conducting Preventative Maintenance Services and Corrective Maintenance & Repairs on the equipment |
| 100; Contractor will correct deficiencies for negative actions or poor performance that results from the actions or inactions of unqualified personnel. |
| 1,2,3, & Quarterly Contractor Performance and Quality Control Meeting |
| Documentation and Reporting (PWS Section 9) |
| Required reports and documentation by contractor. |
| For work performed, services executed, and for tasks/deliverables completed the contractor will appropriately document their effort. |
| 100% Required reports submitted as stipulated in the contract. Reports and/or service logs submitted mirror the work that the contractor has performed. |
| 1,2,3, & Quarterly Contractor Performance and Quality Control Meeting |
Incentive/Disincentives for Meeting/Not Meeting AQL
1. Positive and negative performance will be documented locally (contract file) and/or in the appropriate contractor performance assessment reporting system/database.
2. Noncompliance to contract standards will be corrected at no cost to the government. The government reserves the right and may elect to measure/document negative performance through utilization of a performance report and/or a contract discrepancy report
3. The contractor shall respond in writing to the Contracting Officer Representative (COR) to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the Contracting Officer Representative and/or the Contracting Officer. The contractor’s response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.
The Performance Requirements Summary Matrix includes performance standards. The Government will use these standards to determine Contractor performance and will compare Contractor performance to the Acceptable Quality Level (AQL).
5.
RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. Metrics and methods are also designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
| MARGINAL: |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).
| UNSATISFACTORY: |
| Performance does not meet most contractual requirements and recovery |
is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency
6.
DOCUMENTING PERFORMANCE
a. ACCEPTABLE Performance.
If contractual terms and conditions are being met and/or exceeded documentation is not necessarily required. However positive performance by the contractor will be referenced and/or documented if/when the Quarterly Contractor Performance and Quality Control Meeting is held. If the total contract cost exceeds the Simplified Acquisition Threshold (SAT) a CPAR’s (Contractor Performance Assessment Reporting System) report is required where contractor performance information will be recorded.
b. UNACCEPTABLE performance.
When unacceptable performance occurs, the COR will inform the Contractor. This notification will normally be in writing unless circumstances necessitate verbal communication. Formal reporting may be done through generation of a Contract Discrepancy Report (CDR) if the issue cannot be rectified by other means.
When the COR determines that formal written communication and reporting is required the COR will prepare a Contract Discrepancy Report (CDR) and will present it to the appropriate Contractor representative.
The Contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor must present this corrective action plan back to the COR. The Government will review the Contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, other non-payment actions, or other actions deemed necessary by the CO.
The government reserves the right to document negative performance as stipulated above if/when a Quarterly Contractor Performance and Quality Control Meeting is held. If a CPARS report is required contractor performance will also be annotated in this database.
7.
FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will take periodic measurements as specified in the AQL column of the Performance Standards Summary Matrix and will analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
APPENDIX A – PERFORMANCE REPORT
Performance Report < This template will be used to formally document surveillance. >
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.> Prepared by: <Enter COR’s name>
Signature – Contracting Officer Representative
Date
APPENDIX B– CONTRACT DISCREPANCY REPORT
Contract Discrepancy Report (CDR)
< This template will be used to formally document discrepancies. >
1. Contract Number: <insert number>
2. TO: (Contractor Task Manager or on-site representative) <insert name>
3. FROM: (Name of COR) <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
6. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: <Enter COR’s name>
Signature – Contracting Officer Representative
Received by:
Signature - Contractor Representative