About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity to conduct crane load testing at the Bonneville Lock and Dam in Washington. The QASP outlines the government's plan to monitor and evaluate the contractor's performance in completing the 100% crane load rating load test for Bridge Crane No. 3 at Powerhouse No. 2. The Contracting Officer's Representative will inspect the work progress, safety requirements, crane rigging setup, and final installation to ensure all requirements are met according to the Statement of Work/Performance Work Statement.

The related federal contract opportunity is solicitation W9127N24Q0093 for the Bonneville Crane Load Testing project. This is a Request for Quote (RFQ) for a Firm Fixed Price contract to conduct load testing and provide a final report for Bridge Crane 3 at Bonneville Dam Powerhouse 2. The work must be completed within 10 weeks of contract award, which is anticipated to be on 10 June 2024. The solicitation is a 100% Small Business Set-aside under NAICS Code 238290, and offerors must be registered in the System for Award Management (SAM) to be eligible. Contractor qualifications require at least 3 successful load tests of similar scope within the last 4 years.

View the file

Other files for this federal contract opportunity

Other files attached to Bonneville Crane Load Testing, newest first.
File Type Posted
RFQ W9127N24Q0093 AMND 0002.pdf PDF
Industry Questions and Responses through 6.12.24.pdf PDF
RFQ W9127N24Q0093 AMND 0003.pdf PDF
RFQ W9127N24Q0093.pdf PDF
RFQ W9127N24Q0093 AMND 0001.pdf PDF
B.01 1233-A Clearance Dwg.pdf PDF
Wage Rates Skamania County 2015-5563.pdf PDF
RFQ W9127N24Q0093.pdf PDF
A.02 Performance Work Statement for Crane Load Test - 28FEB24.pdf PDF
B.01 1233-1A General Dwg.pdf PDF
B.01 BDP-1-3-1_2.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan for

Bonneville Lock and Dam Crane Load Tests, Bridge Crane No. 3 – Powerhouse No. 2, Washington

PR&C#W66QKZ40601972

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate Contractor actions while implementing this Performance Work Summary (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective.

The QASP provides a systematic method to evaluate the services the Contractor is required to furnish.

This QASP is cited on the premise the Government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

Quality Assurance Surveillance Plan Performance Objective SOW

Line Description Performance Threshold

Bridge Crane No. 3 Load Test Bid Item 0001 100% crane load rating load test

1. SURVEILLANCE: The Contracting Officer’s Representative (COR) will inspect and monitor on a daily basis of work progress, ensuring all safety requirements are met. The representative will also inspect crane rigging setup and water connections prior to the filling of the test load bags. At completion, the COR will inspect final installation to determine if all requirements have been met. If COR discovers deficiencies and/or receives complaints, they will pass them on to the contractor’s Quality Control Inspector (QCI) for correction.

STANDARD: All work to be completed according to SOW/PWS.

2. PROCEDURES: COR will record findings of surveillance. If COR discovers deficiencies and/or receives complaints, they will pass them on to the contractor’s Quality Control Inspector (QCI) for correction.