QASP.docx

DOCX document 24 KB Posted

Attached to
F108--Asbestos Abatement Federal contract opportunity
Solicitation number
36C24623Q1047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for asbestos abatement services at the Richmond Veterans Affairs Medical Center in Richmond, Virginia. The QASP outlines performance standards and monitoring procedures for the contractor. Key performance objectives include adhering to all contract requirements and ensuring contractor personnel are in compliance. Surveillance methods involve direct observation, complaints reviews, and user surveys. Positive performance will result in favorable evaluations while unfavorable performance may result in a Contract Discrepancy Report and corrective action plan. The COR will meet with the contractor monthly to assess performance.

The related federal contract opportunity is solicitation number 36C24623Q1047 for asbestos abatement services at the Richmond VAMC. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 6. The QASP provides details on performance monitoring for the contract awarded through this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to F108--Asbestos Abatement, newest first.
File Type Posted
ATTACHMENT A - Glossary.docx DOCX document
36C24623Q1047.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

QUALITY ASSURANCE SURVEILLANCE PLAN

The contractor shall be evaluated in accordance with the following QASP.

For: Richmond Veterans Affairs Medical Center, Richmond, Virginia

Contract Number: ________________________ <upon Award, Government shall enter number>

Contract Description: Asbestos Abatement Service for the Richmond VAMC

Contractor’s name: _______________________ (hereafter referred to as the contractor).

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

1. What shall be monitored.

1. How monitoring shall take place.

1. Who shall conduct the monitoring.

1. How monitoring efforts and results shall be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Diane Stoskopf / 757-728-3449

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: TBD

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager – ____________________________

b. Other Contractor Personnel ___________________________________(name and title)

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

ID
Performance Objective
Performance Standard
AQL
Method of Surveillance
Incentives / Disincentives

The Contractor shall adhere to all requirements in accordance with (IAW)Performance Work Statement (PWS) section B 2, B.3, B4 and B.5.

The Contractor and subcontractors are in compliance throughout the period of performance

95%

CO/COR periodic Inspection of vehicles Incentives: Favorable contactor performance evaluation.

Disincentive: Unfavorable contractor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level

The Contractor shall adhere to all requirements IAW B.2, B.3, B.4 and B.5.

The Contractor Personnel are in compliance throughout the period of performance

98%

CO/COR periodic surveillance of personnel and inspection of records

Incentives: Favorable contactor performance evaluation.

Disincentive: Unfavorable contractor performance evaluation.

A Contract Discrepancy Report (CDR) may be issued on the first instance of failure to provide the acceptable level

5. INCENTIVES/DISINCENTIVES

The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures.

Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.

6. PROCEDURES/METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. Direct Observation. (Can be performed periodically or through 100% surveillance.)

b. Complaints. Any complaint data is reviewed by the CO/COR – any validated complaints against a contractor will be further investigated.

c. User Survey. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.

Neutral outcome: No more than 3 incidents of not meeting the performance standard during the period of performance

Negative outcome: More than 3 incidents of not meeting the performance standard during the period of performance.

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the CO and COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.

<After award, both the contractor’s Program Manager and the COR shall this document>

Signature – Contractor Program Manager

Contracting Officer’s Representative

File details come from the government source that posted it. Updated .