QASP.doc

DOC document 191 KB Posted

Attached to
Testing for CO2 Scrubbers & CO/H2 Burners
Solicitation number
N4523A22R0818
Issued by

View the file

Other files

File Type Posted
DI-MGMT-81648 CFR.pdf PDF
CDRL A002 Work Completion Certification Report.pdf PDF
Wage Determination.pdf PDF
N4523A22R0818.pdf PDF
DI-MGMT-82061 Work Completion Cert.pdf PDF
CDRL A001 CFR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP)

Perform testing of No.1 & No.2 CO/H2 scrubber and burner units

TABLE OF CONTENTS

Section Title

Page

Background

Scope

Purpose

Authority

Role and Responsibilities

Performance Requirements and Method of Surveillance

APPENDICES

Title

Page Appendix 1 – Surveillance Matrix

Appendix 2 – Corrective Action Report (CAR)

Appendix 3 – Customer Complaint Record

Appendix 4 – Performance Assessment Report (PAR)

Quality Assurance Surveillance Plan (QASP) Refurbish No.2 SSMG

1 BACKGROUND

Government requires an in-place refurbishment of No. 2 Ships Service Motor Generators (SSMGs).

2 SCOPE

Complete an in-place refurbishment, DC field pole replacement, and testing of No. 2 Ships Service Motor Generators (SSMG).

3 Purpose

This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor meets the performance standards contained in the contract. The QASP establishes procedures on how the assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:

- What will be monitored

- How monitoring will take place

- Who will conduct the monitoring

- How monitoring efforts and results will be documented

The contractor is responsible for implementing and delivering performance meeting contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.

The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize unforeseen or uncontrollable circumstances might occur outside the control of the contractor.

Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

4 Authority Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.

5 Roles and Responsibilities The following personnel oversee and coordinate surveillance activities.

5.1 Program / Project Manager

The PM provides primary program oversight, nominates the Contracting Officer’s Representative (COR), ensures the COR is trained (before performing any COR duties) and supports the COR's performance assessment activities. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government's behalf.

Assigned PM: Mr. David Worley Organization or Agency: Puget Sound Naval Shipyard (PSNS)

Telephone: 360-204-3929

Email: david.worley@navy.mil

5.2 Contracting Office (KO)

The KO ensures performance of all necessary actions for effective contracting, including compliance with the contract terms, and safeguarding the interests of the United States in the contractual relationship. The KO ensures the contractor receives impartial, fair, and equitable treatment under the contract. The KO determines and documents the final assessment of the contractor's performance in the governments past performance tracking system.

Assigned KO: Mr. Nick Crowell

Telephone: (360) 517-3698

Email: Nicholas.a.crowell@navy.mil

5.3 Contracting Officer's Representative (COR)

The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR maintains a Quality Assurance file accurately documenting the contractor's actual performance. The purpose is to ensure the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government's behalf.

Assigned COR: Mr. Nick Rollinson

Telephone: (360) 476-1390

Email: david.worley@navy.mil

5.4 Contractor Representatives

The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract.

Program Manager – Telephone:

Email:

6 Performance Requirements and Method of Surveillance

This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.

6.1 Contract Surveillance

The goal of the QASP is to ensure contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.

6.2 Surveillance Matrix

The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards to be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards (PS) define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards. The PS should be used to form the foundation of the COR's inspection checklist.

In evaluating the quality of contractor’s performance, the following performance ratings may be used.

Performance

Rating Criteria

Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Appendix 1 - Surveillance Matrix

Statements
Standards/AQLs
Inspections
Ratings

2.1 Comply with the requirements of FY 22 NAVSEA Standard Items 009-06, 009-04, 009-24, 009-109, and 009-110.

Statements
Standards/AQLs
Inspections
Ratings

3.10 Submit requirements of 009-04 (para. 3.10.3) as part of contractor's proposal. (CDRL A001)

Statements
Standards/AQLs
Inspections
Ratings

2.2 Comply with the requirements of Northwest Regional Maintenance Center (NWRMC) Local Standard Items (LSI) 099-01NW, 099-04NW, and 099-12NW environmental and safety process requirements.

Statements
Standards/AQLs
Inspections
Ratings

3.10.5 Submit requirements of 099-04NW (para 3.2) as part of contractor's proposal. (CDRL A002)

Statements
Standards/AQLs
Inspections
Ratings

3.10.6.1 Submit Condition Found Report for all measurements and components replaced or modified for No. 2 SSMG sets. (CDRL A003)

Statements
Standards/AQLs
Inspections
Ratings

3.10.18.3 Submit a test and completion report for each SSMG. (CDRL A004 and CDRL A005)

Appendix 2 - Corrective Action Report (CAR)

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY FORMCHECKBOX

MAJOR FORMCHECKBOX

MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

FORMCHECKBOX

ACCEPTED FORMCHECKBOX

REJECTED

12. CLOSE DATE

Appendix 3 - Customer Complaint Record

CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 - Performance Assessment Report (PAR)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. FORMCHECKBOX

DEFICIENCY (CHECK ALL BOXES THAT APPLY)

FORMCHECKBOX

NEW

FORMCHECKBOX

REPEAT

FORMCHECKBOX

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX

CONCUR FORMCHECKBOX

NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. FORMCHECKBOX

CONCUR FORMCHECKBOX

NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS