QASP CCure CCTV Aquisition.docx
DOCX document 45 KB Posted
- Solicitation number
- 36C25924Q0828
About this file
This document is a Quality Assurance Surveillance Plan (QASP) that outlines the government's approach to monitoring contractor performance for a contract to provide CCURE system and CCTV maintenance services for the Department of Veterans Affairs (VA) Medical Services in Waco, Texas.
The key details include the performance standards, acceptable quality levels, and surveillance methods the government will use to evaluate the contractor's compliance with the contract requirements. The contractor is responsible for quality control and management, while the government conducts quality assurance. Performance will be monitored through direct observation, periodic inspections, progress meetings, and customer complaints. Unacceptable performance will result in Contracting Officer notification and the requirement for a corrective action plan from the contractor. The QASP is a "living document" that may be revised by the government in coordination with the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Amendment 36C25924Q0828 0002.docx | DOCX document | |
| 36C25924Q0828 0002.docx | DOCX document | |
| 36C25924Q0828 0001.docx | DOCX document | |
| RFQ Amendment 36C25924Q0828 0001.docx | DOCX document | |
| 36C25924Q0828.docx | DOCX document | |
| RFQ 36C25924Q0828.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Service Delivery Summary (SDS) in this contract.
The QASP provides a systematic method to evaluate the services the contractor is required to furnish.
The QASP is based on the premise, the government desires to maintain a quality standard in providing primary care/mental health services to its patients. The resulting contract is considered the best means of achieving that objective.
PURPOSE
The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is Quality Assurance (QA) to ensure contract standards are achieved.
This QASP does not detail how the contractor accomplishes the work; rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the government’s responsibility to be objective, fair, and consistent in evaluating performance. In this contract, the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program, approved at the beginning of the contract, provides the measures needed to lead the contractor to success.
This QASP explains the following:
1. What shall be monitored?
2. How monitoring shall take place.
3. Who shall conduct the monitoring?
4. How monitoring efforts and results shall be documented.
This QASP is a “living document” and the government may review and revise it on a regular basis; however, the government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and government officials implementing surveillance activities.
Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document shall ensure a robust quality assurance program.
PERFORMANCE STANDARDS
Performance standards define desired services. The government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The performance requirements summary matrix is incorporated within this QASP to include performance standards and disincentives. The government shall use these standards to determine contractor performance to Acceptable Quality Level (AQL) defined below for each performance requirement.
| PERFORMANCE THRESHOLD/ | ||
| TASK | STANDARD ACCEPTABLE QUALITY LEVEL | METHOD OF SURVEILLANCE |
Obtaining current License Agreements for the CCURE System.
Must keep the License agreement current for the applicable period.
100% Direct Observation - Direct observation shall be performed periodically or through 100% surveillance. All performance standards.
Keeping the CCURE and CCTV systems software agreements current.
| Must keep the software agreements up to date throughout the period. |
| 98% |
| Periodic Inspection - Evaluate outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, annually or unscheduled, as required. All performance standards. |
| Performing timely routine repairs to the CCURE and CCTV systems and equipment |
| Arriving to facility in a timely manner to make any necessary repairs to the CCure or CCTV systems |
| 98% |
| Direct Observation - Direct observation shall be performed periodically or through 100% surveillance. All performance standards. |
| Performing timely emergency repairs to the CCURE and CCTV systems and equipment |
| Respond and arrive at facility within the threshold for emergency repairs |
| 95% |
| Direct Observation - Direct observation shall be performed periodically or through 100% surveillance. All performance standards. |
| Providing all management, personnel, labor, supplies, tools, equipment, communication devices, transportation, and fuel necessary to service, repair, update, and provide licensing for the CCure/CCTV systems. |
| Having the correct personnel, management, tools, equipment, capabilities, and knowledge to perform the tasks listed in the PWS. |
98%
Periodic Inspection - Evaluate outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, annually or unscheduled, as required. All performance standards.
Surveillance: The government’s QA person and the COTR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation - Direct observation shall be performed periodically or through 100% surveillance. All performance standards.
b. Periodic Inspection - Evaluate outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, annually or unscheduled, as required. All performance standards.
c. Progress or status meetings - All performance standards.
d. Complaints - Complaints from agency personnel shall be passed to the contractor’s quality control inspector (QCI) for correction. All performance standards.
Standard: Customer complaints shall not exceed the thresholds cited above for each performance objective. The government’s QA personnel shall notify the Contracting Officer (CO) for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions – Commercial Items (May 1997) or the appropriate inspection of services clause, if any of the above service area exceed the customer complain thresholds.
DOCUMENTING PERFORMANCE
a. Acceptable Performance – The government shall document performance. Any report may become a part of the supporting documentation for any contractual action.
b. Unacceptable performance – When unacceptable performance occurs, the COTR shall inform the contractor. This shall normally be in writing unless circumstances necessitate verbal communication. In any case, the COTR shall document the discussion and place it in the COTR file.
When the COTR determines formal written communication is required, the COTR shall prepare a Contract Discrepancy Report (CDR) and present it to the Contracting Officer. In turn, the CO shall present the CDR to the contractor’s contracting personnel.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long, after receipt, the contractor has to present this corrective action plan to the COTR. The government shall review the contractor’s corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
Surveillance: The government evaluator shall evaluate the services required by each deliver/task order to ensure complete compliance.
Procedures: The government evaluator shall inspect to ensure contractor compliance with the appropriate section of the SOW periodically. The evaluator shall record results of inspection, noting the date & time of inspection. If inspection indicates unacceptable performance, the government evaluator shall notify the CO and/or QCI of the deficiencies and have QCI correct those deficiencies. Contractor shall be given notification to correct the deficiencies within a reasonable amount of time, on a case-by-case basis. The CO shall have the final authority on the amount of time the contractor has to correct the deficiency. The evaluator shall not issue a receiving report accepting the services for the month in question until all deficiencies have been corrected.
Frequency of Measurement: During contract performance, the COTR shall periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
a. Frequency of Performance Assessment Meetings.
The COTR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
Signature, Contractor Program Manager
Signature, Contracting Officer’s Technical Representative
Signature, Contracting Officer
File details come from the government source that posted it. Updated .